Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 17.691 | 12.194 | 158.619 | 13.987 | 92% |
86% December - 2018 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 17.691 | 9.341 | 155.766 | 13.987 | 92% |
85% November - 2018 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 17.691 | 9.341 | 155.766 | 13.987 | 92% |
85% November - 2018 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 23.588 | 22.188 | 168.613 | 13.987 | 92% |
92% April - 2019 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. Demand Rs.13.634 m above TS. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 23.588 | 16.526 | 162.951 | 13.987 | 92% |
89% March - 2019 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. Demand Rs.13.634 m above TS. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 23.588 | 16.526 | 162.951 | 13.987 | 92% |
89% March - 2019 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. Demand Rs.13.634 m above TS. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 23.588 | 12.194 | 158.619 | 13.987 | 92% |
86% February - 2019 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. Demand 13.634 M above TS |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 17.691 | 12.194 | 158.619 | 13.987 | 92% |
86% January - 2019 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. |
No Image |
Haripur | |||||||||||||||||||
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
25-05-16 | - | - | 02-11-15 | - | 100.1 | 21.75 | 30 | 25.65 | 25.65 | 16.97 | 38.72 | 48.35 | 52% |
39% December - 2017 |
Length 10.25 Km - PCC 5/17 components completed. |
No Image |
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
25-05-16 | - | - | 02-11-15 | - | 100.1 | 21.75 | 30 | 30 | 25.65 | 4.138 | 25.888 | 48.35 | 52% |
26% September - 2017 |
5/17 components completed. |
No Image |
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
25-05-16 | - | - | 02-11-15 | - | 100.1 | 21.75 | 30 | 30 | 10.65 | 4.138 | 25.888 | 48.35 | 52% |
26% August - 2017 |
3/17 components completed. |
No Image |
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
25-05-16 | - | - | 02-11-15 | - | 100.1 | 21.75 | 30 | 30 | 10.65 | 0 | 21.75 | 48.35 | 52% |
22% July - 2017 |
3/17 components completed. |
No Image |
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 25.65 | 25.65 | 16.923 | 38.673 | 48.35 | 52% |
39% November - 2017 |
length 10.25 PCC - 5/17 components completed. |
No Image |
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 30 | 25.65 | 9.121 | 30.871 | 48.35 | 52% |
31% October - 2017 |
5/17 components completed. |
No Image |
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 36.023 | 36.023 | 36.023 | 57.773 | 48.35 | 52% |
58% June - 2018 |
Length 10.25 Km - PCC 9/17 components completed. |
No Image |
1) PCC Road Togh-I (1798.72 rft)
2) PCC Road Togh-II (1798.75 rft)
3) PCC Road Bazid Khel
4) PCC Road Sheikhan
5) PCC Road Bahadar Kot
6) PCC Road Dhoda
7) PCC Road Ghulam Banda
8) PCC Road Shadi Khel (3587.44 rft)
9) PCC Road Daud Khel
10) PCC Road Dan Banda (3587.44 rft)
11) PCC Road Gumbat
12) PCC Road Bo;otang (3587.44 rft)
13) PCC Road Parsai
14) PCC Road Gul Hasan Banda
15) PCC Road Rungi
16) PCC Road Rahdi Dhok
17) PCC Road Kata Khel | |||||||||||||||||||
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 36.023 | 36.023 | 33.333 | 55.083 | 48.35 | 52% |
55% May - 2018 |
Length 10.25 Km - PCC 9/17 components completed. |
No Image |
1) PCC Road Togh-I (1798.72 rft)
2) PCC Road Togh-II (1798.75 rft)
3) PCC Road Bazid Khel
4) PCC Road Sheikhan
5) PCC Road Bahadar Kot
6) PCC Road Dhoda
7) PCC Road Ghulam Banda
8) PCC Road Shadi Khel (3587.44 rft)
9) PCC Road Daud Khel
10) PCC Road Dan Banda (3587.44 rft)
11) PCC Road Gumbat
12) PCC Road Bo;otang (3587.44 rft)
13) PCC Road Parsai
14) PCC Road Gul Hasan Banda
15) PCC Road Rungi
16) PCC Road Rahdi Dhok
17) PCC Road Kata Khel | |||||||||||||||||||
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 36.023 | 36.023 | 32.111 | 53.861 | 48.35 | 52% |
54% April - 2018 |
Length 10.25 Km - PCC 9/17 components completed. |
No Image |
1) PCC Road Togh-I (1798.72 rft)
2) PCC Road Togh-II (1798.75 rft)
3) PCC Road Bazid Khel
4) PCC Road Sheikhan
5) PCC Road Bahadar Kot
6) PCC Road Dhoda
7) PCC Road Ghulam Banda
8) PCC Road Shadi Khel (3587.44 rft)
9) PCC Road Daud Khel
10) PCC Road Dan Banda (3587.44 rft)
11) PCC Road Gumbat
12) PCC Road Bo;otang (3587.44 rft)
13) PCC Road Parsai
14) PCC Road Gul Hasan Banda
15) PCC Road Rungi
16) PCC Road Rahdi Dhok
17) PCC Road Kata Khel | |||||||||||||||||||
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 33.333 | 33.333 | 23.005 | 44.755 | 48.35 | 52% |
45% March - 2018 |
Length 10.25 Km - PCC 9/17 components completed. |
No Image |
1) PCC Road Togh-I (1798.72 rft)
2) PCC Road Togh-II (1798.75 rft)
3) PCC Road Bazid Khel
4) PCC Road Sheikhan
5) PCC Road Bahadar Kot
6) PCC Road Dhoda
7) PCC Road Ghulam Banda
8) PCC Road Shadi Khel (3587.44 rft)
9) PCC Road Daud Khel
10) PCC Road Dan Banda (3587.44 rft)
11) PCC Road Gumbat
12) PCC Road Bo;otang (3587.44 rft)
13) PCC Road Parsai
14) PCC Road Gul Hasan Banda
15) PCC Road Rungi
16) PCC Road Rahdi Dhok
17) PCC Road Kata Khel | |||||||||||||||||||
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 33.333 | 33.333 | 23.005 | 44.755 | 48.35 | 52% |
45% February - 2018 |
Length 10.25 Km - PCC 5/17 components completed. |
No Image |
1) PCC Road Togh-I (1798.72 rft)
2) PCC Road Togh-II (1798.75 rft)
3) PCC Road Bazid Khel
4) PCC Road Sheikhan
5) PCC Road Bahadar Kot
6) PCC Road Dhoda
7) PCC Road Ghulam Banda
8) PCC Road Shadi Khel (3587.44 rft)
9) PCC Road Daud Khel
10) PCC Road Dan Banda (3587.44 rft)
11) PCC Road Gumbat
12) PCC Road Bo;otang (3587.44 rft)
13) PCC Road Parsai
14) PCC Road Gul Hasan Banda
15) PCC Road Rungi
16) PCC Road Rahdi Dhok
17) PCC Road Kata Khel | |||||||||||||||||||
992 (OG) |
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100.1 | 21.75 | 30 | 33.333 | 33.333 | 23.005 | 44.755 | 48.35 | 52% |
45% January - 2018 |
Length 10.25 Km - PCC 5/17 components completed. |
No Image |
1) PCC Road Togh-I | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 48.460075 | 48.460075 | 48.46 | 1412.16 | 312.392 | 82% |
82% December - 2019 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 50.611 | 12.653 | 12.653 | 1376.353 | 312.392 | 82% |
80% November - 2019 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 50.611 | 12.653 | 12.653 | 1376.353 | 312.392 | 82% |
80% October - 2019 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 50.611 | 12.653 | 12.653 | 1376.353 | 312.392 | 82% |
80% September - 2019 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 50.611 | 12.653 | 12.653 | 1376.353 | 312.392 | 82% |
80% August - 2019 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 48.46 | 48.460075 | 48.46 | 1412.16 | 312.392 | 82% |
82% May - 2020 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 48.46 | 48.460075 | 48.46 | 1412.16 | 312.392 | 82% |
82% April - 2020 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 48.46 | 48.460075 | 48.46 | 1412.16 | 312.392 | 82% |
82% March - 2020 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 48.46 | 48.460075 | 48.46 | 1412.16 | 312.392 | 82% |
82% February - 2020 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera. |
Nowshera PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1726.703 | 1363.7 | 50.611 | 48.460075 | 48.460075 | 48.46 | 1412.16 | 312.392 | 82% |
82% January - 2020 |
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress. |
No Image |
Package-1 (Malang to Kana Khel)
Package-2 (Kana Khel to Sadu Khel)
Package-3 (Sadu Khel to Gajo Khel) | |||||||||||||||||||
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2020 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2020 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2020 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2021 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2021 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2021 |
No Image | |
992 (OG) |
180104-Case Management System in the Directorate of Prosecution and its District Offices (Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 94.927 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2021 |
No Image | |