Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 28.725 | 28.725 | 28.725 | 1000.175 | 608.51 | 62% |
62% December - 2019 |
Land acquisition in progress. 6 Nos culverts, clearing and grubbing in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 30 | 7.5 | 7.5 | 978.95 | 608.51 | 62% |
61% November - 2019 |
Land acquisition in progress. 6 Nos culverts, clearing and grubbing in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 30 | 7.5 | 7.5 | 978.95 | 608.51 | 62% |
61% October - 2019 |
Land acquisition in progress. 6 Nos culverts, clearing and grubbing in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 30 | 7.5 | 7.5 | 978.95 | 608.51 | 62% |
61% September - 2019 |
Land acquisition in progress. 6 Nos culverts, clearing and grubbing in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 30 | 7.5 | 7.5 | 978.95 | 608.51 | 62% |
61% August - 2019 |
Land acquisition in progress. 6 Nos culverts, clearing and grubbing in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 120.725 | 120.725 | 120.725 | 1092.175 | 608.51 | 62% |
68% May - 2020 |
Pack-1 (5 Km) sub base, WBM, WC, asphalt in progress. Pack-2 (4 Km) 2 bridges completed except expansion joint. Pack-3 (3 Km) sub base, WBM, WC, asphalt in progress. Pack-4 (4 Km) sub base, WBM, WC, asphalt in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 28.725 | 28.725 | 28.725 | 1000.175 | 608.51 | 62% |
62% April - 2020 |
Pack-1 (5 Km) sub base, WBM, WC, asphalt in progress. Pack-2 (4 Km) 2 bridges completed except expansion joint. Pack-3 (3 Km) sub base, WBM, WC, asphalt in progress. Pack-4 (4 Km) sub base, WBM, WC, asphalt in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 28.725 | 28.725 | 28.725 | 1000.175 | 608.51 | 62% |
62% March - 2020 |
Pack-1 (5 Km) sub base, WBM, WC, asphalt in progress. Pack-2 (4 Km) 2 bridges completed except expansion joint. Pack-3 (3 Km) sub base, WBM, WC, asphalt in progress. Pack-4 (4 Km) sub base, WBM, WC, asphalt in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 28.725 | 28.725 | 28.725 | 1000.175 | 608.51 | 62% |
62% February - 2020 |
Pack-1 (5 Km) sub base, WBM, WC, asphalt in progress. Pack-2 (4 Km) 2 bridges completed except expansion joint. Pack-3 (3 Km) sub base, WBM, WC, asphalt in progress. Pack-4 (4 Km) sub base, WBM, WC, asphalt in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-1A, District Charsadda (13 KM). |
Charsadda PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1609.96 | 971.45 | 30 | 28.725 | 28.725 | 28.725 | 1000.175 | 608.51 | 62% |
62% January - 2020 |
Pack-1 (5 Km) sub base, WBM, WC, asphalt in progress. Pack-2 (4 Km) 2 bridges completed except expansion joint. Pack-3 (3 Km) sub base, WBM, WC, asphalt in progress. Pack-4 (4 Km) sub base, WBM, WC, asphalt in progress. |
No Image |
Package-1 (Naguman Chowk to Hajizai
Package-2 (Bridge at Km 4+420 and Bridge at Km 4+010 at Hajizai)
Package-3 (Hajizai to Ocha Wala)
Package-4 (Ocha Wala to Shabqadar Chowk) | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.329 | 20 | 20 | 10 | 9.98 | 451.309 | 0 | 100% |
100% December - 2018 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.329 | 20 | 20 | 10 | 8.632 | 449.961 | 0 | 100% |
100% November - 2018 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.329 | 20 | 20 | 10 | 8.632 | 449.961 | 0 | 100% |
100% November - 2018 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.328 | 20 | 20 | 20 | 10.034 | 451.362 | 0 | 100% |
100% April - 2019 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.328 | 20 | 20 | 20 | 9.98 | 451.308 | 0 | 100% |
100% March - 2019 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.328 | 20 | 20 | 20 | 9.98 | 451.308 | 0 | 100% |
100% March - 2019 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.328 | 20 | 20 | 20 | 9.98 | 451.308 | 0 | 100% |
100% February - 2019 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
140910-F/S, Design & Construction of road (a) Akhoon Bandi to Magri road (b) Pharrori to Bandi Mian Pid Dad via Bian Ahmed Ali Khan to Kandal (c) Sarai Nimat Khan to Jabri road, District Haripur (23 Kms). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 446.915 | 441.328 | 20 | 20 | 10 | 9.98 | 451.308 | 0 | 100% |
100% January - 2019 |
Length 23 Km width 12 ft - earth work 90%, sub-base 90%, base course 40%, structure work 70% completed. |
No Image |
Haripur | |||||||||||||||||||
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
26-02-16 | - | - | 10-09-15 | - | 100 | 14.991 | 30 | 25.65 | 18.15 | 10.65 | 25.641 | 55.009 | 45% |
26% December - 2017 |
Length 12 Km - 3 Km asphalt completed. |
No Image |
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
26-02-16 | - | - | 10-09-15 | - | 100 | 14.991 | 30 | 30 | 10.65 | 2.553 | 17.544 | 55.009 | 45% |
18% September - 2017 |
Length 15.7 Km - 3 Km base course completed. |
No Image |
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
26-02-16 | - | - | 10-09-15 | - | 100 | 14.991 | 30 | 30 | 10.65 | 2.553 | 17.544 | 55.009 | 45% |
18% August - 2017 |
Length 15.7 Km - 3 Km base course completed. |
No Image |
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
26-02-16 | - | - | 10-09-15 | - | 100 | 14.991 | 30 | 30 | 10.65 | 0 | 14.991 | 55.009 | 45% |
15% July - 2017 |
Length 15.7 Km - 3 Km base course completed. |
No Image |
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 25.65 | 18.15 | 10.65 | 25.641 | 55.009 | 45% |
26% November - 2017 |
Length 12 Km - 3 Km asphalt completed. |
No Image |
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 30 | 17.7 | 10.65 | 25.641 | 55.009 | 45% |
26% October - 2017 |
Length 12 Km - 2 Km asphalt completed. |
No Image |
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 30.402 | 30.402 | 30.402 | 45.393 | 55.009 | 45% |
45% June - 2018 |
Length 12 Km (width 18 ft) - 3 Km TST completed. |
No Image |
1) BT Road of Bahadar Kot (2 Km) ( W- 14 ft)
2) BT Road of Bazid Khel (3 Km) (w - 18ft )
3) BT Road of Paracha Town (1 Km) (width 12 Ft)
4) BT Road of UC Kharmato (2 Km) (width 18 ft )
5) BT Road of UC Chorlaki (2 Km) (width 18 ft )
6) BT Road of UC KhushalGarh (2 Km) (width 18 ft) | |||||||||||||||||||
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 50.65 | 50.65 | 21.376 | 36.367 | 55.009 | 45% |
36% May - 2018 |
Length 12 Km (width 18 ft) - 3 Km TST completed. |
No Image |
1) BT Road of Bahadar Kot (2 Km) ( W- 14 ft)
2) BT Road of Bazid Khel (3 Km) (w - 18ft )
3) BT Road of Paracha Town (1 Km) (width 12 Ft)
4) BT Road of UC Kharmato (2 Km) (width 18 ft )
5) BT Road of UC Chorlaki (2 Km) (width 18 ft )
6) BT Road of UC KhushalGarh (2 Km) (width 18 ft) | |||||||||||||||||||
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 43.15 | 43.15 | 21.245 | 36.236 | 55.009 | 45% |
36% April - 2018 |
Length 12 Km (width 18 ft) - 3 Km TST completed. |
No Image |
1) BT Road of Bahadar Kot (2 Km) ( W- 14 ft)
2) BT Road of Bazid Khel (3 Km) (w - 18ft )
3) BT Road of Paracha Town (1 Km) (width 12 Ft)
4) BT Road of UC Kharmato (2 Km) (width 18 ft )
5) BT Road of UC Chorlaki (2 Km) (width 18 ft )
6) BT Road of UC KhushalGarh (2 Km) (width 18 ft) | |||||||||||||||||||
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 43.15 | 43.15 | 10.65 | 25.641 | 55.009 | 45% |
26% March - 2018 |
Length 12 Km (width 18ft) - 3 Km TST completed. |
No Image |
1) BT Road of Bahadar Kot (2 Km) ( W- 14 ft)
2) BT Road of Bazid Khel (3 Km) (w - 18ft )
3) BT Road of Paracha Town (1 Km) (width 12 Ft)
4) BT Road of UC Kharmato (2 Km) (width 18 ft )
5) BT Road of UC Chorlaki (2 Km) (width 18 ft )
6) BT Road of UC KhushalGarh (2 Km) (width 18 ft) | |||||||||||||||||||
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 43.15 | 43.15 | 10.65 | 25.641 | 55.009 | 45% |
26% February - 2018 |
Length 12 Km (width 18ft) - 3 Km asphalt completed. |
ADP's Images |
1) BT Road of Bahadar Kot (2 Km) ( W- 14 ft)
2) BT Road of Bazid Khel (3 Km) (w - 18ft )
3) BT Road of Paracha Town (1 Km) (width 12 Ft)
4) BT Road of UC Kharmato (2 Km) (width 18 ft )
5) BT Road of UC Chorlaki (2 Km) (width 18 ft )
6) BT Road of UC KhushalGarh (2 Km) (width 18 ft) | |||||||||||||||||||
990 (OG) |
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 14.991 | 30 | 25.65 | 18.15 | 10.65 | 25.641 | 55.009 | 45% |
26% January - 2018 |
Length 12 Km - 3 Km asphalt completed. |
No Image |
1) BT Road of Bahadar Kot (2 Km)
2) BT Road of Bazid Khel (3 Km)
3) BT Road of Paracha Town (1 Km)
4) BT Road of UC Kharmato (2 Km)
5) BT Road of UC Chorlaki (2 Km)
6) BT Road of UC KhushalGarh (2 Km) | |||||||||||||||||||
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2020 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2020 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2020 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2021 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2021 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2021 |
No Image | |
990 (New) |
191585-F/S & Establishment/Upgradition of Colleges/Universities/Campuses in Merged Areas (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2021 |
No Image | |