Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 10 | 5.0005 | 0 | 272.592 | 116.894 | 71% |
68% December - 2018 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 10 | 5.001 | 5 | 277.592 | 116.894 | 71% |
69% November - 2018 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 10 | 5.001 | 5 | 277.592 | 116.894 | 71% |
69% November - 2018 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 15 | 15.0005 | 15 | 287.592 | 116.894 | 71% |
72% April - 2019 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 15 | 10.0005 | 10 | 282.592 | 116.894 | 71% |
71% March - 2019 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 15 | 10.0005 | 10 | 282.592 | 116.894 | 71% |
71% March - 2019 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 15 | 10.0005 | 0 | 272.592 | 116.894 | 71% |
68% February - 2019 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140656-F/S, Design & Construction of road from (i) Sulam Khand to Sira road (6.50 Km), (ii) Ghazi to Sulam Khand, Salam Khan Gali to Triman (8.5 Km) and (iii) Ghazi Jari Kas road (5 Km), District Haripur (20-Km). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.486 | 272.592 | 10 | 10 | 5.0005 | 0 | 272.592 | 116.894 | 71% |
68% January - 2019 |
Length 18.5 Km - width 12 ft, Pack-I - earth work completed, road work, structure work in progress and 3.5 Km shifted to Jarikus. |
No Image |
1) Pack-1 - Sira to Salam Khund road 6.5 Km
2) Pack-2 - Sira to Salam Khund road 8.5 Km
3) Pack-3 - Jhari Kas 3.5 Km | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
02-06-15 | 30-06-18 | - | 10-09-15 | - | 260.114 | 256.411 | 19.636 | 8.596 | 3.687 | 3.686 | 260.097 | 0 | 100% |
100% December - 2017 |
Completed (5 Km). |
No Image |
Kohat PK-38 | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
02-06-15 | 30-06-18 | - | 10-09-15 | - | 260.114 | 256.411 | 19.636 | 19.636 | 9.818 | 0 | 256.411 | 0 | 100% |
99% September - 2017 |
Length 5 Km - 5 asphalt completed. Bridge -completed. Approaches WC in progress. |
No Image |
Kohat PK-38 | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
02-06-15 | 30-06-18 | - | 10-09-15 | - | 260.114 | 256.411 | 19.636 | 19.636 | 9.818 | 0 | 256.411 | 0 | 100% |
99% August - 2017 |
Length 5 Km - 5 asphalt completed. Bridge - deck slab in progress. |
No Image |
Kohat PK-38 | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
02-06-15 | 30-06-18 | - | 10-09-15 | - | 260.114 | 256.411 | 19.636 | 19.636 | 6.971 | 0 | 256.411 | 0 | 100% |
99% July - 2017 |
Length 5 Km - 5 asphalt completed. Bridge - deck slab in progress. |
No Image |
Kohat PK-38 | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.411 | 19.636 | 8.596 | 3.687 | 3.686 | 260.097 | 0 | 100% |
100% November - 2017 |
Completed (5 Km). |
No Image |
Kohat PK-38 | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.411 | 19.636 | 19.636 | 8.609 | 3.697 | 260.108 | 0 | 100% |
100% October - 2017 |
Length 5 Km - 5 asphalt completed. Bridge - completed. |
No Image |
Kohat PK-38 | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.41 | 19.636 | 3.687 | 3.687 | 3.687 | 260.097 | 0 | 100% |
100% June - 2018 |
Completed (5 Km). |
No Image |
PK-38 Kohat | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.41 | 19.636 | 6.364 | 6.364 | 3.686 | 260.096 | 0 | 100% |
100% May - 2018 |
Completed (5 Km). |
No Image |
PK-38 Kohat | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.41 | 19.636 | 6.364 | 6.364 | 3.686 | 260.096 | 0 | 100% |
100% April - 2018 |
Completed (5 Km). |
No Image |
PK-38 Kohat | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.41 | 19.636 | 12.864 | 12.864 | 3.686 | 260.096 | 0 | 100% |
100% March - 2018 |
Completed (5 Km) (width - varying) |
No Image |
PK-38 Kohat | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.41 | 19.636 | 12.864 | 12.864 | 3.686 | 260.096 | 0 | 100% |
100% February - 2018 |
Completed (5 Km) (width - varying) |
No Image |
PK-38 Kohat | |||||||||||||||||||
989 (OG) |
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 260.114 | 256.411 | 19.636 | 12.864 | 12.864 | 3.686 | 260.097 | 0 | 100% |
100% January - 2018 |
Completed (5 Km). |
No Image |
PK-38 Kohat | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 95.75 | 95.75 | 95.75 | 942.533 | 173.176 | 85% |
84% December - 2019 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 100 | 25 | 25 | 871.783 | 173.176 | 85% |
78% November - 2019 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 100 | 25 | 25 | 871.783 | 173.176 | 85% |
78% October - 2019 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 100 | 25 | 25 | 871.783 | 173.176 | 85% |
78% September - 2019 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 100 | 25 | 25 | 871.783 | 173.176 | 85% |
78% August - 2019 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 199.97 | 199.17 | 199.97 | 1046.753 | 173.176 | 85% |
93% May - 2020 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 95.75 | 95.75 | 95.75 | 942.533 | 173.176 | 85% |
84% April - 2020 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 95.75 | 95.75 | 95.75 | 942.533 | 173.176 | 85% |
84% March - 2020 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 95.75 | 95.75 | 95.75 | 942.533 | 173.176 | 85% |
84% February - 2020 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
120282-Improvement and Widening of Road from Mufti Mehmood Flyover to old Budni Bridge upto Whaid Garhi 9 Km on PH S-I i/c reconstruction of old Budhni Bridge District Peshawar |
Peshawar PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1119.959 | 846.783 | 100 | 95.75 | 95.75 | 95.75 | 942.533 | 173.176 | 85% |
84% January - 2020 |
Bridge completed and opened for traffic. Section-1 (1550 mtr) - asphalt overlay both side completed, drain in progress. Section-2 (1000 mtr)- sub base, aggregate base, RCC pipe culvert completed, asphalt base course, asphalt WC in progress. |
No Image |
1) 2.5 Km | |||||||||||||||||||
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2020 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2020 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2020 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2021 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2021 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2021 |
No Image | |
989 (OG) |
195140-Feasibility for the establishment of University in NW (AIP). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2021 |
No Image | |
Pages : 1 |