Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2020, January - 2021, January - 2018, January - 2019, February - 2020, February - 2021, February - 2018, February - 2019, March - 2020, March - 2021, March - 2018, March - 2019, April - 2020, April - 2021, April - 2018, April - 2019, May - 2020, May - 2021, May - 2018, June - 2018, July - 2020, July - 2017, August - 2019, August - 2020, August - 2017, September - 2019, September - 2020, September - 2017, October - 2019, October - 2020, October - 2017, November - 2019, November - 2017, November - 2018, December - 2019, December - 2020, December - 2017, December - 2018,

Showing Page Number : 1 of 1

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 16.001 13.5 161.429 61.731 72% 73%
December - 2018
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 13.501 13.5 161.429 61.731 72% 73%
November - 2018
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 13.501 13.5 161.429 61.731 72% 73%
November - 2018
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 17.8755 16 163.929 61.731 72% 75%
April - 2019
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 17.8755 16 163.929 61.731 72% 75%
March - 2019
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 17.8755 16 163.929 61.731 72% 75%
March - 2019
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 17.8755 16 163.929 61.731 72% 75%
February - 2019
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 219.66 147.929 10 18.5 16.001 16 163.929 61.731 72% 75%
January - 2019
Length 20 Km - all 22 units, all in progress.
No Image
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
12-10-16 - - 15-09-17 - 220 3.75 20 17.1 7.1 7.1 10.85 196.25 11% 5%
December - 2017
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
- - - 02-11-15 - 175.218 3.75 20 20 7.1 0.974 4.724 151.468 14% 3%
September - 2017
Structure work 600 rft completed. Removal of encroachment in progress. 2nd Revised PC-I/DCE for Rs.220 m approved, AA awaited.
No Image
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
- - - 02-11-15 - 175.218 3.75 20 20 7.1 0 3.75 151.468 14% 2%
August - 2017
Structure work 600 rft completed. Removal of encroachment in progress. 2nd Revised PC-I/DCE for Rs.234.132 m submitted to P&D.
No Image
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
- - - 02-11-15 - 175.218 3.75 20 20 7.1 0 3.75 151.468 14% 2%
July - 2017
Structure work 600 rft completed. Removal of encroachment in progress. 2nd Revised PC-I/DCE for Rs.234.132 m submitted to SOR on 27/07/2017.
No Image
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 7.1 7.1 10.85 196.25 11% 5%
November - 2017
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 20 7.1 7.1 10.85 196.25 11% 5%
October - 2017
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 17.1 17.1 20.85 196.25 11% 9%
June - 2018
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
5 Km Bannu
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 17.1 17.1 20.85 196.25 11% 9%
May - 2018
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
5 Km Bannu
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 17.1 17.1 20.85 196.25 11% 9%
April - 2018
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
5 Km Bannu
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 7.1 7.1 10.85 196.25 11% 5%
March - 2018
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
5 Km Bannu
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 7.1 7.1 10.85 196.25 11% 5%
February - 2018
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
5 Km Bannu
974
(OG)
140886-F/S, Design & Construction of 05 Km roads from Bannu City to Kakki via Mundan, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 220 3.75 20 17.1 7.1 7.1 10.85 196.25 11% 5%
January - 2018
Structure work 600 rft completed. Removal of encroachment in progress.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 0 0 0 189.4 5% -
December - 2019
Tender floated on 13/01/2020.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 0 0 0 189.4 5% -
November - 2019
Approved.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 Line Deptt 200 0 10 10 0 0 0 0 - -
October - 2019
DCE will be re submitted by P&D. Deffered. Observation attended.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 Line Deptt 200 0 10 10 0 0 0 0 - -
September - 2019
DCE will be re submitted by 21-10-2019 on MRS 2019.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 Line Deptt 200 0 10 10 0 0 0 0 - -
August - 2019
Dce under preparation
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 10 0 0 189.4 5% -
May - 2020
Work order issued.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 10 0 0 189.4 5% -
April - 2020
Work order issued.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 10 0 0 189.4 5% -
March - 2020
Work order issued.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 10 0 0 189.4 5% -
February - 2020
Work order issued.
No Image
974
(New)
190585-Rehabilitation of Roads in PK-31, District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 199.4 0 10 10 10 0 0 189.4 5% -
January - 2020
Tender approval under process.
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
December - 2020
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
December - 2020
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
October - 2020
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
September - 2020
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
August - 2020
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 -
July - 2020
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
May - 2021
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
April - 2021
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
March - 2021
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
February - 2021
No Image
974
(OG)
191578-160459 - Award of In Land Scholarships to FATA Students During (2017-18) [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 350 150 0 0 0 0 150 0 - -
January - 2021
No Image
Pages : 1