Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.084 | 15.198 | 4.06 | 35.765 | 0 | 100% |
55% December - 2018 |
2 Packages - earth work completed. Sub base in progress. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.084 | 15.198 | 0 | 31.705 | 0 | 100% |
49% November - 2018 |
2 Packages - earth work completed. Sub base in progress. Site disputed by locals regarding land. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.084 | 15.198 | 0 | 31.705 | 0 | 100% |
49% November - 2018 |
2 Packages - earth work completed. Sub base in progress. Site disputed by locals regarding land. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.0844 | 32.0849 | 5.724 | 37.429 | 0 | 100% |
58% April - 2019 |
2 Packages - earth work completed. Sub base in progress. Cannot be completed, instead 978 will be completed. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.0844 | 32.0849 | 5.724 | 37.429 | 0 | 100% |
58% March - 2019 |
2 Packages - earth work completed. Sub base in progress. Cannot be completed, instead 978 will be completed. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.0844 | 32.0849 | 5.724 | 37.429 | 0 | 100% |
58% March - 2019 |
2 Packages - earth work completed. Sub base in progress. Cannot be completed, instead 978 will be completed. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.0844 | 32.0849 | 5.724 | 37.429 | 0 | 100% |
58% February - 2019 |
2 Packages - earth work completed. Sub base in progress. Cannot be completed, instead 978 will be completed. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (OG) |
140785-Improvement and Blacktopping of Butti to Lower Surjal - 3.5 Km, District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65 | 31.705 | 33.773 | 32.084 | 15.1974 | 5.724 | 37.429 | 0 | 100% |
58% January - 2019 |
2 Packages - earth work completed. Sub base in progress. Cannot be copmplted , intead 978 will be complted. |
No Image |
1) Package-1 - 0+00 - 2+00 (2 Km)
2) Package-2 - 2.2+00 - 3+500 (1.50 Km) | |||||||||||||||||||
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
DCE under preparation for Rs. 120 M on MRS Submitted to CE on 5/12/2019. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
DCE under preparation for Rs. 120 M on MRS Submitted to CE on 5/12/2019. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
DCE under preparation for Rs. 120 M on MRS 2019. Will be submitted by 18/10/2019 |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
DCE under preparation for Rs. 120 M on MRS 2019. Will be submitted by 18/10/2019 |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
DCE under preparation. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
Approved . AA Awaited. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
Approved . AA Awaited. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
Approved . AA Awaited. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
Approved . AA Awaited. |
No Image |
970 (New) |
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 120 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- January - 2020 |
Approved . AA Awaited. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 100.386 | 20 | 8.523 | 64.857 | 12.723 | 92% |
38% December - 2020 |
Work in progress, 33% work completed. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 100.386 | 20 | 8.523 | 64.857 | 12.723 | 92% |
38% December - 2020 |
Work in progress, 33% work completed. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 100.386 | 20 | 6.687 | 63.021 | 12.723 | 92% |
37% October - 2020 |
Work in progress, 33% work completed. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 100.386 | 20 | 5.757 | 62.091 | 12.723 | 92% |
37% September - 2020 |
Work in progress, 33% work completed. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 100.386 | 20 | 5.757 | 62.091 | 12.723 | 92% |
37% August - 2020 |
Work in progress, 33% work completed. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 69.057 | 100.386 | 0 | 0 | 0 | 69.057 | 0 | 100% |
41% July - 2020 |
Work in progress, 33% work completed. |
No Image |
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 61.561 | 61.561 | 36.912 | 93.246 | 12.723 | 92% |
55% May - 2021 |
Work in progress,
33% work completed.
Demand Rs: 12.82 M |
No Image |
GGDC Bara, Khyber Agency. (G.D) [MA] | |||||||||||||||||||
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 61.561 | 61.561 | 36.912 | 93.246 | 12.723 | 92% |
55% April - 2021 |
Work in progress,
33% work completed.
Demand Rs: 12.82 M |
No Image |
GGDC Bara, Khyber Agency. (G.D) [MA] | |||||||||||||||||||
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 61.561 | 61.561 | 20.435 | 76.769 | 12.723 | 92% |
45% March - 2021 |
Work in progress,
33% work completed.
Demand Rs: 12.82 M |
No Image |
GGDC Bara, Khyber Agency. (G.D) [MA] | |||||||||||||||||||
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 20 | 20 | 20 | 76.334 | 12.723 | 92% |
45% February - 2021 |
Work in progress,
33% work completed.
Demand Rs: 12.82 M |
No Image |
GGDC Bara, Khyber Agency. (G.D) [MA] | |||||||||||||||||||
970 (OG) |
191579-160460 - Establishment of GGDC Bara, Khyber Agency. (G.D) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.443 | 56.334 | 100.386 | 20 | 20 | 13.381 | 69.715 | 12.723 | 92% |
41% January - 2021 |
Work in progress, 33% work completed. |
No Image |
GGDC Bara, Khyber Agency. (G.D) [MA] | |||||||||||||||||||
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
- | - | - | 03-11-16 | - | 150 | 0 | 10 | 8.55 | 6.05 | 6.05 | 6.05 | 140 | 7% |
4% December - 2017 |
Length 6 Km - earth work started. |
No Image |
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
- | - | - | 03-11-16 | - | 150 | 0 | 10 | 10 | 5 | 0.439 | 0.439 | 140 | 7% |
0% September - 2017 |
Length 6 Km - earth work started. |
No Image |
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
- | - | - | 03-11-16 | - | 150 | 0 | 10 | 10 | 3.55 | 0 | 0 | 140 | 7% |
- August - 2017 |
Work started. |
No Image |
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
- | - | - | 03-11-16 | - | 150 | 0 | 10 | 10 | 3.55 | 0 | 0 | 140 | 7% |
- July - 2017 |
Work started. |
No Image |
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 8.55 | 6.05 | 0.439 | 0.439 | 140 | 7% |
0% November - 2017 |
Length 6 Km - earth work started. |
No Image |
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 10 | 5 | 0.439 | 0.439 | 140 | 7% |
0% October - 2017 |
Length 6 Km - earth work started. |
No Image |
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 11.55 | 11.55 | 11.549 | 11.549 | 140 | 7% |
8% June - 2018 |
Length 6 Km - earth work, sub base in progress. |
No Image |
PK-76, Lakki Marwat | |||||||||||||||||||
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 11.55 | 11.55 | 11.549 | 11.549 | 140 | 7% |
8% May - 2018 |
Length 6 Km - earth work, sub base in progress. |
No Image |
PK-76, Lakki Marwat | |||||||||||||||||||
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 11.55 | 11.55 | 11.549 | 11.549 | 140 | 7% |
8% April - 2018 |
Length 6 Km - earth work, sub base in progress. |
No Image |
PK-76, Lakki Marwat | |||||||||||||||||||
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 9.05 | 9.05 | 9.05 | 9.05 | 140 | 7% |
6% March - 2018 |
Length 6 Km - earth work started. |
No Image |
PK-76, Lakki Marwat | |||||||||||||||||||
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 9.05 | 9.05 | 9.05 | 9.05 | 140 | 7% |
6% February - 2018 |
Length 6 Km - earth work started. |
ADP's Images |
PK-76, Lakki Marwat | |||||||||||||||||||
970 (OG) |
150797-Construction / Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 0 | 10 | 9.05 | 9.05 | 9.05 | 9.05 | 140 | 7% |
6% January - 2018 |
Length 6 Km - earth work started. |
No Image |
Pages : 1 |