Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2018, January - 2019, January - 2020, January - 2021, February - 2021, February - 2018, February - 2019, February - 2020, March - 2021, March - 2018, March - 2019, March - 2020, April - 2021, April - 2018, April - 2019, April - 2020, May - 2021, May - 2018, May - 2020, June - 2018, July - 2020, July - 2017, August - 2019, August - 2020, August - 2017, September - 2017, September - 2019, September - 2020, October - 2017, October - 2019, October - 2020, November - 2017, November - 2018, November - 2019, December - 2017, December - 2018, December - 2019, December - 2020,

Showing Page Number : 1 of 1

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
15-04-16 - - 10-09-15 - 199.99 18.55 50 42.75 30.25 22.497 41.047 131.44 34% 21%
December - 2017
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited. Summary for change of nomenclature submitted to CA.
No Image
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 199.99 18.55 50 42.75 30.25 17.75 36.3 131.44 34% 18%
November - 2017
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited. Sumary for Change of Nomenclature Submitted to CA.
No Image
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 199.99 18.55 50 50 17.75 17.75 36.3 131.44 34% 18%
October - 2017
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited.
No Image
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
15-04-16 - - 10-09-15 - 199.99 18.55 50 50 17.75 17.75 36.3 131.44 34% 18%
September - 2017
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units S/Base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited.
No Image
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
15-04-16 - - 10-09-15 - 199.99 18.55 50 50 17.75 12 30.55 131.44 34% 15%
August - 2017
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Revised PC-I/DCE for Rs.199.968 m submitted Pre-PDWP held.
No Image
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
15-04-16 - - 10-09-15 - 199.99 18.55 50 50 17.75 0 18.55 131.44 34% 9%
July - 2017
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Revised PC-I/DCE for Rs.199.968 m submitted to SOR on 23/06/2017. Pre-PDWP held.
No Image
963
(OG)
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 18.55 50 57.818 57.818 57.818 76.368 129.573 35% 39%
June - 2018
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress. Additional work - work order issued.
No Image
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works
963
(OG)
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 18.55 50 57.818 57.818 57.818 76.368 129.573 35% 39%
May - 2018
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress. Additional work - work order issued. Rs.19.750 m demanded.
No Image
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works
963
(OG)
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 18.55 50 57.818 57.818 57.676 76.226 129.573 35% 38%
April - 2018
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress. Additional work - work order issued. Rs.19.750 m demanded.
No Image
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works
963
(OG)
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 18.55 50 57.818 57.818 57.818 76.368 129.573 35% 39%
March - 2018
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress. Revised scope tender approval in process.
No Image
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works
963
(OG)
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 18.55 50 55.128 55.128 30.25 48.8 129.573 35% 25%
February - 2018
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised Scope Tender approval in procerss.
No Image
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works
963
(OG)
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 18.55 50 55.128 55.128 30.25 48.8 129.573 35% 25%
January - 2018
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Summary for change of nomenclature submitted to CA.
No Image
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.5005 0 31.75 58.25 42% 32%
December - 2018
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.501 0 31.75 58.25 42% 32%
November - 2018
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.501 0 31.75 58.25 42% 32%
November - 2018
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 9.5005 9.5 41.25 58.25 42% 41%
April - 2019
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.5005 0 31.75 58.25 42% 32%
March - 2019
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.5005 0 31.75 58.25 42% 32%
March - 2019
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.5005 0 31.75 58.25 42% 32%
February - 2019
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(OG)
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 100 31.75 10 9.5 4.5005 0 31.75 58.25 42% 32%
January - 2019
Length 7 Km - 4.9 Km completed.
No Image
PK-55, Mansehra
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
December - 2020
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
December - 2020
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
October - 2020
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
September - 2020
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
August - 2020
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
July - 2020
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
May - 2021
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
April - 2021
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
March - 2021
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
February - 2021
No Image
963
(New)
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives.
Mardan
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 0 0 0 0 0 0 - -
January - 2021
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 500 0 17.24 17.24 0 0 0 482.76 3% -
December - 2019
Work order issued.
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 17.24 17.24 0 0 0 482.76 3% -
November - 2019
Financial Bid opened on 6/12/2019
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 17.24 17.24 0 0 0 482.76 3% -
October - 2019
Technical bid opening obn 21/11/2019
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 17.24 17.24 0 0 0 482.76 3% -
September - 2019
Approved. Procuremnet in progress.
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 Line Deptt 500 0 17.24 17.24 0 0 0 0 - -
August - 2019
PC-I/DCE under preparation.Identification awaited from CA
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 500 0 105.045 105.045 105.045 105.045 105.045 394.955 21% 21%
May - 2020
13 - Units Work in progress on all units.
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 500 0 17.24 17.24 12.428 12.428 12.428 482.76 3% 2%
April - 2020
13 - Units 7- Work in progress. 6-Work order issued.
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 500 0 17.24 17.24 12.428 12.428 12.428 482.76 3% 2%
March - 2020
13 - Units 7- Work in progress. 6-Work order issued.
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 500 0 17.24 17.24 12.428 12.428 12.428 482.76 3% 2%
February - 2020
13 - Units 7- Work in progress. 6-Work order issued.
No Image
963
(New)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 500 0 17.24 17.24 12.428 12.428 12.428 482.76 3% 2%
January - 2020
13 - Units 7- Work in progress. 6-Work order issued.
No Image
Pages : 1