Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
15-04-16 | - | - | 10-09-15 | - | 199.99 | 18.55 | 50 | 42.75 | 30.25 | 22.497 | 41.047 | 131.44 | 34% |
21% December - 2017 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited. Summary for change of nomenclature submitted to CA. |
No Image |
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.99 | 18.55 | 50 | 42.75 | 30.25 | 17.75 | 36.3 | 131.44 | 34% |
18% November - 2017 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited. Sumary for Change of Nomenclature Submitted to CA. |
No Image |
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.99 | 18.55 | 50 | 50 | 17.75 | 17.75 | 36.3 | 131.44 | 34% |
18% October - 2017 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited. |
No Image |
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
15-04-16 | - | - | 10-09-15 | - | 199.99 | 18.55 | 50 | 50 | 17.75 | 17.75 | 36.3 | 131.44 | 34% |
18% September - 2017 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units S/Base in progress. Revised PC-I/DCE for Rs.199.968 m approved. AA awaited. |
No Image |
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
15-04-16 | - | - | 10-09-15 | - | 199.99 | 18.55 | 50 | 50 | 17.75 | 12 | 30.55 | 131.44 | 34% |
15% August - 2017 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Revised PC-I/DCE for Rs.199.968 m submitted Pre-PDWP held. |
No Image |
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
15-04-16 | - | - | 10-09-15 | - | 199.99 | 18.55 | 50 | 50 | 17.75 | 0 | 18.55 | 131.44 | 34% |
9% July - 2017 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Revised PC-I/DCE for Rs.199.968 m submitted to SOR on 23/06/2017. Pre-PDWP held. |
No Image |
963 (OG) |
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.123 | 18.55 | 50 | 57.818 | 57.818 | 57.818 | 76.368 | 129.573 | 35% |
39% June - 2018 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress.
Additional work - work order issued. |
No Image |
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works | |||||||||||||||||||
963 (OG) |
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.123 | 18.55 | 50 | 57.818 | 57.818 | 57.818 | 76.368 | 129.573 | 35% |
39% May - 2018 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress.
Additional work - work order issued. Rs.19.750 m demanded. |
No Image |
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works | |||||||||||||||||||
963 (OG) |
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.123 | 18.55 | 50 | 57.818 | 57.818 | 57.676 | 76.226 | 129.573 | 35% |
38% April - 2018 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress.
Additional work - work order issued. Rs.19.750 m demanded. |
No Image |
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works | |||||||||||||||||||
963 (OG) |
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.123 | 18.55 | 50 | 57.818 | 57.818 | 57.818 | 76.368 | 129.573 | 35% |
39% March - 2018 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6 units sub base in progress.
Revised scope tender approval in process. |
No Image |
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works | |||||||||||||||||||
963 (OG) |
150780-(a) Construciton / Rehabilitation of Road from Tank Adda to Zafar Abad Colony, Tank Adda to Daraban Chungi (b) Road from Circular Road to Muryali Mor, Shah Alam Abad/Eye Hospital road, Chashma road to Village Singar, Sheikh Yousaf (Grid Road) in District DI.Khan PK-64 (10.24 Kms) (i) Road from Circular Road to Multan Road (Old Sabzi Mandi Front) 0.43 Km (ii) Rehabilitation of Diyal Road balance length 0.88 Km (iii) Construction of Bannu Road to Kotli Road (0.31 Km) (iv) TB Hospital Chowk to Circular House Road (0.78 Km) (v) Repair/construction of Drain from Kotli to Shobra Hotel. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.123 | 18.55 | 50 | 55.128 | 55.128 | 30.25 | 48.8 | 129.573 | 35% |
25% February - 2018 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress.
Revised Scope Tender approval in procerss. |
No Image |
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works | |||||||||||||||||||
963 (OG) |
150780-(a) Construciton / Rehabilitation of road from Tank Ada to Zafar Abad Colony, Tank Ada to Darraban Chungi (b) Road from Circular Road to Muryali Morr, Shah Alam Abad Road, Eye Hospital rd, Chashma rd to Village Singar, Sheikh Yousaf Abad rd, District DI.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.123 | 18.55 | 50 | 55.128 | 55.128 | 30.25 | 48.8 | 129.573 | 35% |
25% January - 2018 |
Length 10.24 Km -Zafarabad portion - 2.25 Km BT completed. Remaining 6-units sub base in progress. Summary for change of nomenclature submitted to CA. |
No Image |
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.5005 | 0 | 31.75 | 58.25 | 42% |
32% December - 2018 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.501 | 0 | 31.75 | 58.25 | 42% |
32% November - 2018 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.501 | 0 | 31.75 | 58.25 | 42% |
32% November - 2018 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 9.5005 | 9.5 | 41.25 | 58.25 | 42% |
41% April - 2019 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.5005 | 0 | 31.75 | 58.25 | 42% |
32% March - 2019 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.5005 | 0 | 31.75 | 58.25 | 42% |
32% March - 2019 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.5005 | 0 | 31.75 | 58.25 | 42% |
32% February - 2019 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (OG) |
150870-Improvement / carpeting of road from Dhodial to Shatay Road, Baffa Doraha to Khwajgan and Dhodial to Shatay Road PK-55 District Manshera. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 31.75 | 10 | 9.5 | 4.5005 | 0 | 31.75 | 58.25 | 42% |
32% January - 2019 |
Length 7 Km - 4.9 Km completed. |
No Image |
PK-55, Mansehra | |||||||||||||||||||
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2020 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2020 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2020 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2021 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2021 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2021 |
No Image | |
963 (New) |
190443-Support to Abdul Wali Khan University Mardan for Special Initiatives. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2021 |
No Image | |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 0 | 17.24 | 17.24 | 0 | 0 | 0 | 482.76 | 3% |
- December - 2019 |
Work order issued. |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 17.24 | 17.24 | 0 | 0 | 0 | 482.76 | 3% |
- November - 2019 |
Financial Bid opened on 6/12/2019 |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 17.24 | 17.24 | 0 | 0 | 0 | 482.76 | 3% |
- October - 2019 |
Technical bid opening obn 21/11/2019 |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 17.24 | 17.24 | 0 | 0 | 0 | 482.76 | 3% |
- September - 2019 |
Approved. Procuremnet in progress. |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 500 | 0 | 17.24 | 17.24 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
PC-I/DCE under preparation.Identification awaited from CA |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 0 | 105.045 | 105.045 | 105.045 | 105.045 | 105.045 | 394.955 | 21% |
21% May - 2020 |
13 - Units
Work in progress on all units. |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 0 | 17.24 | 17.24 | 12.428 | 12.428 | 12.428 | 482.76 | 3% |
2% April - 2020 |
13 - Units
7- Work in progress.
6-Work order issued. |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 0 | 17.24 | 17.24 | 12.428 | 12.428 | 12.428 | 482.76 | 3% |
2% March - 2020 |
13 - Units
7- Work in progress.
6-Work order issued. |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 0 | 17.24 | 17.24 | 12.428 | 12.428 | 12.428 | 482.76 | 3% |
2% February - 2020 |
13 - Units
7- Work in progress.
6-Work order issued. |
No Image |
963 (New) |
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 500 | 0 | 17.24 | 17.24 | 12.428 | 12.428 | 12.428 | 482.76 | 3% |
2% January - 2020 |
13 - Units
7- Work in progress.
6-Work order issued. |
No Image |
Pages : 1 |