Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 10 | 3 | 3 | 4.5 | 17.533 | 40% |
15% December - 2020 |
06- Units
work in progress in all units. |
No Image |
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 10 | 3 | 3 | 4.5 | 17.533 | 40% |
15% December - 2020 |
06- Units
work in progress in all units. |
No Image |
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 10 | 3 | 3 | 4.5 | 17.533 | 40% |
15% October - 2020 |
06- Units
work in progress in all units. |
No Image |
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 10 | 3 | 3 | 4.5 | 17.533 | 40% |
15% September - 2020 |
06- Units
work in progress in all units. |
No Image |
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 10 | 3 | 0 | 1.5 | 17.533 | 40% |
5% August - 2020 |
06- Units
work in progress in all units. |
No Image |
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 13.354 | 10 | 0 | 0 | 0 | 13.354 | 0 |
July - 2020 |
No Image | ||
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 7.653 | 7.653 | 7.629 | 9.129 | 17.533 | 40% |
31% May - 2021 |
06- Units
1. M. Buld: upto lintel level
2. B/Wall completed, M. Buld: upto lintel level
3. Plastering in progress
4. Lintel level
5. Roof level
6. Finishing |
No Image |
1 CVD Shno Ghundo
2 CVD Gurbaz Safi
3 CVD Kassai Halmzai
4 CVD Mamazai (Bazai)
5 CVD Navi Killi (Prang Ghar)
6 CVD Badmanai (Bazai)
Scope of work:
| |||||||||||||||||||
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 7.653 | 7.653 | 7.629 | 9.129 | 17.533 | 40% |
31% April - 2021 |
06- Units
work in progress in all units. |
No Image |
1 CVD Shno Ghundo
2 CVD Gurbaz Safi
3 CVD Kassai Halmzai
4 CVD Mamazai (Bazai)
5 CVD Navi Killi (Prang Ghar)
6 CVD Badmanai (Bazai) | |||||||||||||||||||
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 7.653 | 7.653 | 5.395 | 6.895 | 17.533 | 40% |
24% March - 2021 |
06- Units
work in progress in all units. |
No Image |
1 CVD Shno Ghundo
2 CVD Gurbaz Safi
3 CVD Kassai Halmzai
4 CVD Mamazai (Bazai)
5 CVD Navi Killi (Prang Ghar)
6 CVD Badmanai (Bazai) | |||||||||||||||||||
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 7.653 | 7.653 | 3 | 4.5 | 17.533 | 40% |
15% February - 2021 |
06- Units
work in progress in all units. |
No Image |
1 CVD Shno Ghundo
2 CVD Gurbaz Safi
3 CVD Kassai Halmzai
4 CVD Mamazai (Bazai)
5 CVD Navi Killi (Prang Ghar)
6 CVD Badmanai (Bazai) | |||||||||||||||||||
92 (OG) |
191097-180257 - Strengthening / Improvement and Construction of existing Livestock facilities including Breed Improvement System in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.033 | 1.5 | 10 | 3 | 3 | 3 | 4.5 | 17.533 | 40% |
15% January - 2021 |
06- Units
work in progress in all units. |
No Image |
1 CVD Shno Ghundo
2 CVD Gurbaz Safi
3 CVD Kassai Halmzai
4 CVD Mamazai (Bazai)
5 CVD Navi Killi (Prang Ghar)
6 CVD Badmanai (Bazai) | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
11-09-15 | - | - | 25-03-15 | - | 215.561 | 105.085 | 44 | 54 | 29.8 | 28.605 | 133.69 | 66.476 | 69% |
62% December - 2017 |
15 Nos - 5 Nos (5 marla) - RW completed, basement slab laid, GF column work in progress.
8 Nos (10 marla), slab laid - RW completed.
2 Nos (1 Kanal) - raft completed, RW in progress. |
No Image |
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% December - 2019 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 44 | 29.8 | 25.17 | 130.255 | 66.476 | 69% |
60% November - 2017 |
15 Nos - 5 Nos (5 marla) - RW completed, basement slab laid, GF column work in progress.
8 Nos (10 marla), slab laid - RW completed.
2 Nos (1 Kanal) - raft completed, RW in progress. |
No Image |
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% November - 2019 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 44 | 19.8 | 18.89 | 123.975 | 66.476 | 69% |
58% October - 2017 |
15 Nos - 5 Nos (5 marla) - RW completed, basement slab laid, GF column work in progress.
8 Nos (10 marla), slab laid - RW completed.
2 Nos (1 Kanal) - raft completed, RW in progress. |
No Image |
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% October - 2019 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
11-09-15 | - | - | 25-03-15 | - | 215.561 | 105.085 | 44 | 44 | 19.8 | 7.3 | 112.385 | 66.476 | 69% |
52% September - 2017 |
15 Nos - 5 Nos (5 marla) - RW completed, basement slab laid, GF column work in progress.
8 Nos (10 marla), slab laid - RW completed.
2 Nos (1 Kanal) - raft completed, RW in progress. |
No Image |
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% September - 2019 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
11-09-15 | - | - | 25-03-15 | - | 215.561 | 105.085 | 44 | 44 | 19.8 | 0.465 | 105.55 | 66.476 | 69% |
49% August - 2017 |
15 Nos - 5 Nos (5 marla) - RW completed, basement slab laid, GF column work in progress.
8 Nos (10 marla), slab laid - RW completed.
2 Nos (1 Kanal) - raft completed, RW in progress. |
No Image |
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% August - 2019 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
11-09-15 | - | - | 25-03-15 | - | 215.561 | 105.085 | 44 | 44 | 19.8 | 0 | 105.085 | 66.476 | 69% |
49% July - 2017 |
15 Nos - 5 Nos (5 marla) - RW completed, basement slab laid, GF column work in progress.
8 Nos (10 marla), slab laid - RW completed.
2 Nos (1 Kanal) - raft completed, RW in progress. |
No Image |
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 54 | 54 | 54 | 159.085 | 66.476 | 69% |
74% June - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 54 | 54 | 54 | 159.085 | 66.476 | 69% |
74% May - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% May - 2020 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 54 | 54 | 46.086 | 151.171 | 66.476 | 69% |
70% April - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% April - 2020 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 54 | 54 | 33.738 | 138.823 | 66.476 | 69% |
64% March - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% March - 2020 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 54 | 29.8 | 29.8 | 134.885 | 66.476 | 69% |
63% February - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. |
No Image |
Hayatabad Peshawar (5 Marla Duplex House 5 Nos / 20 Marla Duplex House 2 Nos / 10 Marla Duplex House 8 Nos) | |||||||||||||||||||
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% February - 2020 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
140701-Designing and Consruction of duplex residential accommodation of different categories for Govt Officers/Officials in Hayatabad Peshawar. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 215.561 | 105.085 | 44 | 54 | 29.8 | 28.837 | 133.922 | 66.476 | 69% |
62% January - 2018 |
15 Nos - 5 Nos (5 marla) - finishing in progress.
8 Nos (10 marla) - roof tile in progress. 2 Nos (1 Kanal) - finishing in progress. |
No Image |
1) 5 Marla Duplex House (5 Nos) 2) 20 Marla Duplex House (2 Nos) 3) 10 Marla Duplex House (8 Nos) | |||||||||||||||||||
92 (OG) |
160616-Strengthening & Capacity Building of Peshawar Flying Club |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.84 | 40 | 19.84 | 19.84 | 0 | 0 | 40 | 0 | 100% |
67% January - 2020 |
Execution by Admin Deptt. Purchase of 4 Nos of engines from UK. LC opened. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 2.5005 | 0 | 0 | 54.825 | 8% |
- December - 2018 |
NOC awaited from Admin Deptt for demolishing of old building. Revised drawings submitted for approval. Revised PC-I/DCE under preparation. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 2.5005 | 0 | 0 | 54.825 | 8% |
- November - 2018 |
NOC awaited from Admin Deptt for demolishing of old building. Revised drawings submitted for approval. Revised PC-I/DCE under preparation. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 2.5005 | 0 | 0 | 54.825 | 8% |
- November - 2018 |
NOC awaited from Admin Deptt for demolishing of old building. Revised drawings submitted for approval. Revised PC-I/DCE under preparation. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 2.5 | 0 | 0 | 54.825 | 8% |
- April - 2019 |
Approval of financial bid under process. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 3.7505 | 0 | 0 | 54.825 | 8% |
- March - 2019 |
Technical evaluation of bidders under process. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 3.7505 | 0 | 0 | 54.825 | 8% |
- March - 2019 |
Technical evaluation of bidders under process. |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 3.7505 | 0 | 0 | 54.825 | 8% |
- February - 2019 |
Technical Evaluationof contractors in progresss |
No Image |
Peshawar | |||||||||||||||||||
92 (OG) |
170355-Rehabilitation / Renovation of P&D Department Old Block. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 59.825 | 0 | 5 | 5 | 2.5005 | 0 | 0 | 54.825 | 8% |
- January - 2019 |
NOC awaited from Admin Deptt for demolishing of old building. Revised drawings submitted for approval. Revised PC-I/DCE under preparation. |
No Image |
Peshawar | |||||||||||||||||||
Pages : 1 |