Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2021, January - 2019, January - 2020, February - 2021, February - 2019, February - 2020, March - 2021, March - 2019, March - 2020, April - 2021, April - 2019, April - 2020, May - 2021, May - 2020, July - 2020, July - 2018, August - 2020, August - 2019, September - 2020, September - 2018, September - 2019, October - 2020, October - 2019, November - 2018, November - 2019, December - 2020, December - 2018, December - 2019,

Showing Page Number : 1 of 3

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 112.61 35 35 35 7.4 120.01 35.736 81% 65%
December - 2020
Academic block, staff hostel - Flooring in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 112.61 35 35 35 7.4 120.01 35.736 81% 65%
December - 2020
Academic block, staff hostel - Flooring in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 0 15 15 15 7.4 7.4 168.346 8% 4%
October - 2020
Academic block, staff hostel - Flooring in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 0 15 15 15 0 0 168.346 8% -
September - 2020
Academic block, staff hostel - Flooring in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 0 0 0 0 0 0 183.346 - -
August - 2020
Academic block, staff hostel - in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 0 0 0 0 0 0 183.346 - -
July - 2020
Academic block, staff hostel - in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 142.606 25 25 25 17.376 159.982 15.74 91% 87%
May - 2021
01- Unit (i) Academic Block Flooring in progress (ii) Staff Hostel: finishing in progress G/floor completed. 1st floor completed. 2nd floor completed. (iii) Academic block finishing in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
 
Scope of work:
  • Academic/Admin Block
  • Staff Hostel
  • Bachelor Suit 01 No
  • Watch Tower & Visitor Room
 
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 112.61 35 35 35 17.376 129.986 35.736 81% 71%
April - 2021
(i) Academic Block Flooring in progress (ii) Staff Hostel: finishing in progress G/floor completed. 1st floor completed. 2nd floor completed. (iii) Academic block finishing in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 112.61 35 35 35 17.776 130.386 35.736 81% 71%
March - 2021
(i) Academic Block Flooring in progress (ii) Staff Hostel: finishing in progress G/floor completed. 1st floor completed. 2nd floor completed. (iii) Academic block finishing in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 112.61 35 35 35 17.776 130.386 35.736 81% 71%
February - 2021
(i) Academic Block Flooring in progress (ii) Staff Hostel: finishing in progress G/floor completed. 1st floor completed. 2nd floor completed. (iii) Academic block finishing in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 183.346 112.61 35 35 35 7.4 120.01 35.736 81% 65%
January - 2021
Academic block, staff hostel - Flooring in progress.
No Image
1) GGDC Lower Tanawal, Abbottabad
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 6.326 103.762 137.734 48% 39%
December - 2020
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 6.326 103.762 137.734 48% 39%
December - 2020
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 0 0 13 13 2.707 2.707 263.17 - 1%
October - 2020
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 55.9 0 2 2 1 1 1 53.9 4% 2%
September - 2018
Layout given. BW in progress.
No Image
Timergara, Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 0 0 13 13 0 0 263.17 - -
September - 2020
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 0 0 0 0 0 0 263.17 - -
August - 2020
Khall College - in progress. Land acquired recentl
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 55.9 0 2 2 0 0 0 53.9 4% -
July - 2018
Layout given. BW in progress.
No Image
Timergara, Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 0 0 0 0 0 0 263.17 - -
July - 2020
Khall College - in progress. Land acquired recentl
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 21.467 118.903 137.734 48% 45%
May - 2021
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
 
Scope of work:
  • Main Building
  • Cafteria
  • Guard Room
  • Ext: W/S
  • Dev: works
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 15.199 112.635 137.734 48% 43%
April - 2021
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 15.199 112.635 137.734 48% 43%
March - 2021
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 15.199 112.635 137.734 48% 43%
February - 2021
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 263.17 97.436 28 28 28 15.199 112.635 137.734 48% 43%
January - 2021
Khall College - in progress. Land acquired recently.
No Image
1) Establishment of GGDC Khall Dir Lower
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 20 20 20 17.606 104.304 104.156 51% 49%
December - 2020
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 20 20 20 17.606 104.304 104.156 51% 49%
December - 2020
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 0 0 0 0 0 0 210.854 - -
October - 2020
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 0 0 0 0 0 0 210.854 - -
September - 2020
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 0 0 0 0 0 0 210.854 - -
August - 2020
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 0 0 0 0 0 0 210.854 - -
July - 2020
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 48 48 48 27.597 114.295 76.156 64% 54%
May - 2021
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 48 48 48 27.597 114.295 76.156 64% 54%
April - 2021
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 48 48 48 27.597 114.295 76.156 64% 54%
March - 2021
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 48 48 48 27.597 114.295 76.156 64% 54%
February - 2021
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 210.854 86.698 20 20 20 17.606 104.304 104.156 51% 49%
January - 2021
AB up to roof level.
No Image
1) GGDC Bandi Tehsil Barawal PK-91
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 48.31 48.31 14.205326 372.241326 8.654 98% 93%
December - 2019
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 33.31 33.31 11.79 369.826 8.654 98% 92%
November - 2019
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 366.69 33.31 33.31 8.328 8.327 375.017 0 100% 94%
October - 2019
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 366.69 33.31 33.31 8.328 6.737 373.427 0 100% 93%
September - 2019
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 366.69 33.31 33.31 8.328 0 366.69 0 100% 92%
August - 2019
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 48.31 48.31 19.48 377.516 8.654 98% 94%
May - 2020
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft). Will be completed.
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 48.31 48.31 19.48 377.516 8.654 98% 94%
April - 2020
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft). Will be completed.
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 48.31 48.31 19.48 377.516 8.654 98% 94%
March - 2020
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft). Will be completed.
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 48.31 48.31 19.48 377.516 8.654 98% 94%
February - 2020
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft). Will be completed.
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
150883-Pavement of roads/ Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 358.036 33.31 48.31 48.31 16.15 374.186 8.654 98% 94%
January - 2020
88 units - 37 completed, 51 in progress (PCC BT componenets - avg width 10 - 18 ft). Will be completed.
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Karak
30-11--1 30-11--1 - 30-11--1 - 171.289 42.991 19 19 19 18.864 61.855 109.298 36% 36%
December - 2020
BW 90% completed. MB- upto DPC level. Baclor suit - Roof level. Princiapal vila :- Roof level. Demand Rs. 20 M
No Image
GGDC Latamber PK-41
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Karak
30-11--1 30-11--1 - 30-11--1 - 171.289 42.991 19 19 19 18.864 61.855 109.298 36% 36%
December - 2020
BW 90% completed. MB- upto DPC level. Baclor suit - Roof level. Princiapal vila :- Roof level. Demand Rs. 20 M
No Image
GGDC Latamber PK-41
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Karak
30-11--1 30-11--1 - 30-11--1 - 171.289 0 13 13 13 13 13 158.289 8% 8%
October - 2020
BW 90% completed. MB- upto DPC level. Baclor suit - Roof level. Princiapal vila :- Roof level. Demand Rs. 20 M
No Image
GGDC Latamber PK-41
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Karak
30-11--1 30-11--1 - 30-11--1 - 171.289 0 0 0 0 0 0 171.289 - -
September - 2020
BW 90% completed. MB- upto DPC level. Baclor suit - Roof level. Princiapal vila :- Roof level. Demand Rs. 20 M
No Image
GGDC Latamber PK-41
911
(OG)
140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa .
Karak
30-11--1 30-11--1 - 30-11--1 - 171.289 0 0 0 0 0 0 171.289 - -
August - 2020
BW 90% completed. MB- upto DPC level. Baclor suit - Roof level. Princiapal vila :- Roof level.
No Image
GGDC Latamber PK-41
Pages : 1 2 3