Progressive Review for the month(s) of : January - 2020, January - 2021, January - 2019, February - 2019, February - 2020, February - 2021, March - 2019, March - 2020, March - 2021, April - 2019, April - 2020, April - 2021, May - 2020, May - 2021, July - 2020, August - 2019, August - 2020, September - 2019, September - 2020, October - 2019, October - 2020, November - 2019, November - 2018, December - 2018, December - 2019, December - 2020,

Showing Page Number : 1 of 1

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 143.625 143.625 93.875412 127.875412 279.231 40% 28%
December - 2019
Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 150 37.5 37.5 71.5 279.231 40% 15%
November - 2019
Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 150 37.5 37.5 71.5 279.231 40% 15%
October - 2019
Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 150 37.5 37.5 71.5 279.231 40% 15%
September - 2019
Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 150 37.5 0 34 279.231 40% 7%
August - 2019
Earth work in progress. Rev AA issued.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 143.625 143.625 143.624 177.624 279.231 40% 38%
May - 2020
Length 35 KM Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 143.625 143.625 143.624 177.624 279.231 40% 38%
April - 2020
Length 35 KM Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 143.625 143.625 143.624 177.624 279.231 40% 38%
March - 2020
Length 35 KM Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 143.625 143.625 143.624 177.624 279.231 40% 38%
February - 2020
Length 35 KM Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
170574-BT/PCC Road 35 Km in PK-38, District Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 463.231 34 150 143.625 143.625 129.226 163.226 279.231 40% 35%
January - 2020
Length 35 KM Earth work in progress.
No Image
1) Improvement/PCC/BT of Qalandar Abad to Tanawal road with link Tahairli UC Banda Pir Khan
2) Improvement/PCC/BT of Tarhana Bala with link to Basti Khawas Khan UC Banda Pir Khan
3) Rehabilitation of PCC road Abdalto Banda Pir Khan UC Banda Pir Khan
4) PCC road Mangal to Chittal Maira with link to Katha Mangal UC Baldheri
5) Improvement of PCC road More Kalan UC Baldheri
6) Construction of road Choonry Ahlan Kaloor UC Banda Pir Khan
7) Construction of road from Karlan to Bucha Gali Bagh Dara UC Chamad
8) Improvement/PCC/BT o Shah De Gali to Bal Gojri via Kasakki Kalan UC Salhad
9) Improvement and PCC of road Ban Seri to Kasakki Hurd i/c Butial road UC Chamad
10) Improvement/PCC/BT of Kuthial Gali toToda Maira road UC Kuthiala
11) Improvement/PCC of road Sabzi Mandi to Gravity Tank Upper Darra UC Salhad
12) Improvement of Banda Sinjlian to JabrianKutakian road UC Salhad
13) Improvement/PCC of rod from Lalgah to Kandar Jandakka road UC Salhad
14) Improvement/BT of Banda Qazian to Gajjal road UC Havelian Urban
15) Improvement/PCC of road from Dobahar to Boi Di Gali UC Jhangi
16) Improvement/PCCof road Thanda Maira Ziarat UC Salhad
17) Construction of road Dohabla to Darriaya UC Havelian Urban
18) Improvement/BT of road Kakaot to Shahkot UC Pawa
19) Rehabilitatoin of akian to Pind Gali Beer road via Khanda Khoo UC Pind Kargo Khan
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 5 5 0 219 39.894 85% 83%
December - 2020
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Functional by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 5 5 0 219 39.894 85% 83%
December - 2020
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Functional by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 520.851 0 0 5.2 0 520.851 0 - 100%
October - 2020
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Function by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 520.851 0 0 5.2 0 520.851 0 - 100%
September - 2020
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Function by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 520.851 0 0 0 0 520.851 0 - 100%
August - 2020
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Function by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 583.66 0 0 0 0 583.66 0 - 100%
July - 2020
GGDC Tarkha PK-12 - main building Roof laid, BW in
No Image
1) GGDC Jalozai PK-12
2) GGDC T
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 65.67 65.67 28.965 247.965 39.894 85% 94%
May - 2021
02-Units 1. Finishing in progress 2. Completed occupied and functional by Higher Educaiton
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 65.67 65.67 28.965 247.965 39.894 85% 94%
April - 2021
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Functional by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 33.184 33.184 11.465 230.465 39.894 85% 87%
March - 2021
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Functional by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 33.184 33.184 11.465 230.465 39.894 85% 87%
February - 2021
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Functional by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
140013-F/S and Construction of two Girls Colleges in District Nowshera.
Nowshera
30-11--1 30-11--1 - 30-11--1 - 263.894 219 5 5.234 5.234 5.234 224.234 39.894 85% 85%
January - 2021
GGDC Tarkha PK-12 - completed. 2- GGDC Jallozai Pk-12 completed & Functional by Higher Education.
No Image
1) GGDC Jalozai PK-12
2) GGDC Tarkha PK-12
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 84.692 47.5955 165.2725 0.92 100% 71%
December - 2018
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 56.4615 43.1625 160.8395 0.92 100% 69%
November - 2018
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 56.4615 43.1625 160.8395 0.92 100% 69%
November - 2018
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 112.9235 65.7095 183.3865 0.92 100% 79%
April - 2019
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 112.9235 65.7095 183.3865 0.92 100% 79%
March - 2019
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 112.9235 65.7095 183.3865 0.92 100% 79%
March - 2019
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 112.9235 47.5955 165.2725 0.92 100% 71%
February - 2019
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
906
(OG)
150819-F/S, Design, Construction and Widening of Shalpin to Jishar Road, Babu to Mashkomai Maira road,Topsin to Ganajir Top road, Chinkolai to Faqira road, Khwazakhela to Dumbara road, Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 231.52 117.677 112.923 112.923 84.6915 47.5955 165.2725 0.92 100% 71%
January - 2019
Length 16.2 Km (5 units) - Shalpin Jishar road - 40% completed. Topsin to Ganajir road - 40% completed. Khawza Khela to Dambara - 30% completed.
No Image
PK 86, Swat
Pages : 1