Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 9.575 | 9.575 | 9.575 | 63.195 | 136.38 | 32% |
32% December - 2019 |
Length 13 Km - out of 5 units, all earth work in progress. |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 10 | 2.5 | 2.5 | 56.12 | 136.38 | 32% |
28% November - 2019 |
Length 13 Km - out of 5 units, all earth work in progress. |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 10 | 2.5 | 2.5 | 56.12 | 136.38 | 32% |
28% October - 2019 |
Length 13 Km - out of 5 units, all earth work in progress. |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 10 | 2.5 | 2.5 | 56.12 | 136.38 | 32% |
28% September - 2019 |
Length 13 Km - out of 5 units, all earth work in progress. |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 10 | 2.5 | 0 | 53.62 | 136.38 | 32% |
27% August - 2019 |
Length 13 Km - out of 5 units, all earth work in progress. |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 9.575 | 9.575 | 9.575 | 63.195 | 136.38 | 32% |
32% May - 2020 |
Length 13 Km - out of 5 units, all earth work in progress.
P-II ( Rs. 120 M ) |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 9.575 | 9.575 | 9.575 | 63.195 | 136.38 | 32% |
32% April - 2020 |
Length 13 Km - out of 5 units, all earth work in progress.
P-II ( Rs. 120 M ) |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 9.575 | 9.575 | 9.575 | 63.195 | 136.38 | 32% |
32% March - 2020 |
Length 13 Km - out of 5 units, all earth work in progress.
P-II ( Rs. 120 M ) |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 9.575 | 9.575 | 9.575 | 63.195 | 136.38 | 32% |
32% February - 2020 |
Length 13 Km - out of 5 units, all earth work in progress.
P-II ( Rs. 120 M ) |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
150864-Construction of road from Haji Gali to Naguara Gali, Guda Takia, Beesian Riala, Sajikot Ghora Road District Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 53.62 | 10 | 9.575 | 9.575 | 9.575 | 63.195 | 136.38 | 32% |
32% January - 2020 |
Length 13 Km - out of 5 units, all earth work in progress.
P-II ( Rs. 120 M ) |
No Image |
1) Hajia Gali toChamnakaroad (2.5 Km) PK-47
2) Phumermar to Nagra Gali road (2.5 Km) PK-47
3) Guda Takia raod (2 Km) PK-47
4) Beesan Riala road (2.5 Km) PK-47
5) Sajikot Ghora road (2 Km) PK-47 | |||||||||||||||||||
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- December - 2020 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- December - 2020 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- October - 2020 |
No Image | |
899 (OG) |
170173-Provision for Liabilities of Land Compensation. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 496.839 | 0 | 0.001 | 0.001 | 0.0005 | 0 | 0 | 0 | - |
- September - 2018 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- September - 2020 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- August - 2020 |
No Image | |
899 (OG) |
170173-Provision for Liabilities of Land Compensation. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 496.839 | 0 | 0.001 | 0.001 | 0.0005 | 0 | 0 | 0 | - |
- July - 2018 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
July - 2020 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- May - 2021 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- April - 2021 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- March - 2021 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- February - 2021 |
No Image | |
899 (OG) |
195148-Strengthening of National Program (NP) for Family Planning (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 794.342 | 6 | 0 | 0 | 0 | 0 | 6 | 0 | - |
- January - 2021 |
No Image | |
899 (OG) |
170173-Provision for Liabilities of Land Compensation. |
Provincial PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 496.839 | 10 | 0 | 0 | 0 | 0 | 10 | 486.839 | - |
2% September - 2018 |
Approved. |
No Image |
Construction of Northern Bypass road Mardan - Enhanced Land Compensation in court case titled Nazar Muhammad Khan & other versus PKHA and others (decretal amount) | |||||||||||||||||||
899 (OG) |
170173-Provision for Liabilities of Land Compensation. |
Provincial PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 496.839 | 10 | 0 | 0 | 0 | 0 | 10 | 486.839 | - |
2% July - 2018 |
Approved. |
No Image |
Construction of Northern Bypass road Mardan - Enhanced Land Compensation in court case titled Nazar Muhammad Khan & other versus PKHA and others (decretal amount) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.727 | 4.727 | 132.829 | 7.171 | 95% |
95% December - 2018 |
Completed (14 Km). |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.727 | 4.727 | 132.829 | 7.171 | 95% |
95% November - 2018 |
Length 14 Km (width 12 ft) - BT 5.9 Km completed (2 units). Pack-1 - structure work, road work in progress. Pack-2 - structure work, road work in progress. Pack-3 - structure work, WBM in progress. |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.727 | 4.727 | 132.829 | 7.171 | 95% |
95% November - 2018 |
Length 14 Km (width 12 ft) - BT 5.9 Km completed (2 units). Pack-1 - structure work, road work in progress. Pack-2 - structure work, road work in progress. Pack-3 - structure work, WBM in progress. |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.7265 | 4.7265 | 132.8285 | 7.171 | 95% |
95% April - 2019 |
Completed (14 Km). Rs.7.17 m required for completion. |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.7265 | 4.7265 | 132.8285 | 7.171 | 95% |
95% March - 2019 |
Completed (14 Km). Rs.7.17 m required for completion. |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.7265 | 4.7265 | 132.8285 | 7.171 | 95% |
95% March - 2019 |
Completed (14 Km). Rs.7.17 m required for completion. |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.7265 | 4.7265 | 132.8285 | 7.171 | 95% |
95% February - 2019 |
Completed (14 Km). 7.17 M required for completion |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
899 (OG) |
140968-F/S, Design & Construction of (a) Chapryal to Balasoor road, (b) Kherarai to Mandoor road, (c) Durash Khela to Baz Khela, (d) Mandal Daag Road & (e) Venai to Aghal road, (f) Dedpanai Village Road & UC Chapriyal, Asharai Drush Khela, Swat. |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140 | 128.102 | 4.727 | 4.727 | 4.727 | 4.727 | 132.829 | 7.171 | 95% |
95% January - 2019 |
Completed (14 Km). |
No Image |
1) Package-1 - Vainai Chowk to Aghal road (5.65 Km)
2) Package-2 - Chuprial to Balasorr road (2 Km)/Durash Khela to Baz Khela road (1.80 Km)
3) Package-3 - Kharerai to Mandoor road (2.5 Km)/Mandal Dag road (1 Km)/Dedpanai village road (0.6 Km) | |||||||||||||||||||
Pages : 1 |