Progressive Review for the month(s) of : January - 2021, January - 2019, January - 2020, February - 2021, February - 2019, February - 2020, March - 2021, March - 2019, March - 2020, April - 2021, April - 2019, April - 2020, May - 2021, May - 2020, July - 2020, July - 2018, August - 2020, August - 2019, September - 2020, September - 2018, September - 2019, October - 2020, October - 2019, November - 2018, November - 2019, December - 2020, December - 2018, December - 2019,

Showing Page Number : 1 of 1

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 33.15547 33.15547 22.455633 225.918633 309.299 44% 41%
December - 2019
27 Km road - 10 Km completed. 17 Km in progress.
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 37.238 16.128 9.31 212.773 309.299 44% 39%
November - 2019
27 Km road - 10 Km completed. 17 Km in progress.
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 37.238 9.31 9.31 212.773 309.299 44% 39%
October - 2019
27 Km road - 10 Km completed. 17 Km in progress.
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 37.238 9.31 9.245 212.708 309.299 44% 39%
September - 2019
27 Km road - 10 Km completed. 17 Km in progress.
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 37.238 9.31 0 203.463 309.299 44% 37%
August - 2019
27 Km road - 10 Km completed. 17 Km in progress.
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 51.155 51.155 51.085 254.548 309.299 44% 46%
May - 2020
27 Km road - 10 Km completed. 17 Km in progress. Demand Rs. 35 M
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 51.155 51.155 51.085 254.548 309.299 44% 46%
April - 2020
27 Km road - 10 Km completed. 17 Km in progress. Demand Rs. 35 M
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 51.155 51.155 51.085 254.548 309.299 44% 46%
March - 2020
27 Km road - 10 Km completed. 17 Km in progress. Demand Rs. 35 M
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 51.155 51.155 51.085 254.548 309.299 44% 46%
February - 2020
27 Km road - 10 Km completed. 17 Km in progress. Demand Rs. 35 M
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 550 203.463 37.238 33.15547 33.15547 33.085 236.548 309.299 44% 43%
January - 2020
27 Km road - 10 Km completed. 17 Km in progress. Demand Rs. 35 M
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
December - 2020
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
December - 2020
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
October - 2020
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
September - 2020
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
August - 2020
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
May - 2021
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
April - 2021
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
March - 2021
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
February - 2021
No Image
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
FR Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 - -
January - 2021
No Image
853
(OG)
170577-Construction of Thalikot Bridge at Jhari Kass road i/c 2 Km road, District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 75.23 0 0.001 0.001 0.0005 0 0 75.229 0% -
September - 2018
Spectra consultant. MOM awaited. Summary submitted for change of nomenclature.
No Image
PK-52, Haripur
853
(OG)
170577-Construction of Thalikot Bridge at Jhari Kass Road, District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 Line Deptt 75.23 0 0.001 0.001 0.0005 0 0 0 - -
July - 2018
Spectra consultant. PC-I/DCE submitted to P&D Approved in PDWP, AA and MOM awaited. Summary submitted for change of nomenclature.
No Image
PK-52, Haripur
853
(OG)
191507-130471 - Opening of 2 CDs in FR Kohat. [MA]
Kohat
30-11--1 30-11--1 - 30-11--1 - 15.036 12.549 0 0 0 0 12.549 0 -
July - 2020
No Image
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
December - 2018
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
November - 2018
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
November - 2018
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
April - 2019
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
March - 2019
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
March - 2019
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
February - 2019
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher
853
(OG)
160641-Improvement of road village Tordher, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 40 35 11 11 11 10.996 45.996 0 100% 100%
January - 2019
Completed.
No Image
1) Baghi Aram Tordher to Rozi Abd road
2) Dhand Park to Shagai road
3) Guldher Tordher Jalsai Lar road
4) Farooq Banda to Navey Nehr road
5) Farooq Banda to Shehbz Lar Tordher road
6) Road from Abdul Karim Khan MPA Hujra to Maulana Rohul Amin House Village Tordher