Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
July - 2020 |
No Image | |
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 15 | 6.752021 | 154.274021 | 12.304 | 93% |
88% December - 2019 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 15 | 5.167 | 152.689 | 12.304 | 93% |
87% November - 2019 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 15 | 6.5 | 154.022 | 12.304 | 93% |
88% October - 2019 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 3.75 | 3.7 | 151.222 | 12.304 | 93% |
86% September - 2019 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 3.75 | 0 | 147.522 | 12.304 | 93% |
84% August - 2019 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 6.752 | 6.168 | 153.69 | 12.304 | 93% |
88% May - 2020 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 6.752 | 6.168 | 153.69 | 12.304 | 93% |
88% April - 2020 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 6.752 | 6.168 | 153.69 | 12.304 | 93% |
88% March - 2020 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 6.752 | 6.168 | 153.69 | 12.304 | 93% |
88% February - 2020 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 174.826 | 147.522 | 15 | 15 | 15 | 6.168 | 153.69 | 12.304 | 93% |
88% January - 2020 |
Out of 4 bridges, all in progress (Agharily, Arif Killi, Darangal Khwar, Markhani Maidan bridges). |
No Image |
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge | |||||||||||||||||||
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- December - 2020 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- December - 2020 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- October - 2020 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- September - 2020 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- August - 2020 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- May - 2021 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- April - 2021 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- March - 2021 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- February - 2021 |
No Image | |
849 (OG) |
191499-130476 - Opening of 8 CHCs/CDs in FR D.I.Khan. [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.19 | 62.42 | 0 | 0 | 0 | 0 | 62.42 | 0 | - |
- January - 2021 |
No Image | |
849 (OG) |
160189-Improvement and widening of Suraj Gali Hattar road (6.50 Kms), District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116.536 | 44.2 | 0.001 | 0.001 | 0.0005 | 0 | 44.2 | 72.335 | 38% |
38% September - 2018 |
Length 6.5 Km - 80% earth work, 60% structure work completed. |
No Image |
Haripur | |||||||||||||||||||
849 (OG) |
160189-Improvement and widening of Suraj Gali Hattar road (6.50 Kms), District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116.536 | 44.2 | 0.001 | 0.001 | 0.0005 | 0 | 44.2 | 72.335 | 38% |
38% July - 2018 |
Length 6.5 Km - 80% earth work, 60% structure work completed. |
No Image |
Haripur | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.005 | 10 | 20 | 20 | 20 | 232.005 | 77.995 | 74% |
77% December - 2018 |
Length 8 Km - PCC, base course, structure work, sub base in progress. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.005 | 10 | 16 | 16 | 10.624 | 222.629 | 77.995 | 74% |
74% November - 2018 |
Length 8 Km - PCC, base course, structure work, sub base in progress. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.005 | 10 | 16 | 16 | 10.624 | 222.629 | 77.995 | 74% |
74% November - 2018 |
Length 8 Km - PCC, base course, structure work, sub base in progress. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.021 | 10 | 20 | 19.9995 | 19.9995 | 232.0205 | 77.979 | 74% |
77% April - 2019 |
Length 8 Km - PCC, base course, structure work, sub base in progress. Rs.67.979 m required for completion of work. CMD recived for enhancement of cost to Rs. 600 m. Summary under process. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.021 | 10 | 20 | 19.9995 | 19.9995 | 232.0205 | 77.979 | 74% |
77% March - 2019 |
Length 8 Km - PCC, base course, structure work, sub base in progress. Rs.67.979 m required for completion of work. CMD recived for enhancement of cost to Rs. 600 m. Summary under process. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.021 | 10 | 20 | 19.9995 | 19.9995 | 232.0205 | 77.979 | 74% |
77% March - 2019 |
Length 8 Km - PCC, base course, structure work, sub base in progress. Rs.67.979 m required for completion of work. CMD recived for enhancement of cost to Rs. 600 m. Summary under process. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.021 | 10 | 20 | 19.9995 | 19.9995 | 232.0205 | 77.979 | 74% |
77% February - 2019 |
Length 8 Km - PCC, base course, structure work, sub base in progress. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
849 (OG) |
150959-Constn/BT of roads (a) Parmoli Bypass, (b) Permoli Sabar Wand Lar, (c) Sher Dara, (d) Spin Kany Bandi Oba, (e) S.K.B.O Dojangi, (f) Spin Kany Aman Kot Lar PCC rd, (g) KSK Sheikh Jana, (h) Qamardand Narangi, (i) Banzara, (k) Shewa Shera Ghund, ? (q) Ghulama Permoli Bypass Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 212.021 | 10 | 20 | 20 | 20 | 232.021 | 77.979 | 74% |
77% January - 2019 |
Length 8 Km - PCC, base course, structure work, sub base in progress. |
No Image |
1) Permoli Bypass road (1.584 Km)
2) Permoli Sabar Wand Lar Permoli road (1.828 Km)
3) Sher Darra Naranji road (4.050 Km)
4) Speen Kany Bande Obe road (2.133 Km)
5) Speen Kany Bande Obe Dojangi road (2.194 Km)
6) Speen Kany Aman Kot Lar PCC road (2.194 Km)
7) KSK Sheikh Jana road (1 Km)
8) Nawan Killi Sheikh Jana (1 Km)
9) Speen Kany Aman Kot road (1 Km)
10) Qamar Dhand Naranji road (1 Km)
11) Black Topped road Banzara (1 Km)
12) Shewa Shera Ghund road (1 Km)
13) Shewa Khalil Macha Khel (1 Km)
14) Naranji Bypass road (1 Km)
15) Tarkai Behai Dojangi road (1 Km)
16) Asota road (1 Km)
17) Shewa Permoli Bypass road (1 Km)
18) Ghulam Permoli Bypass road (1 Km) | |||||||||||||||||||
Pages : 1 |