Progressive Review for the month(s) of : January - 2019, January - 2020, January - 2021, February - 2019, February - 2020, February - 2021, March - 2019, March - 2020, March - 2021, April - 2019, April - 2020, April - 2021, May - 2020, May - 2021, July - 2020, July - 2018, August - 2019, August - 2020, September - 2018, September - 2019, September - 2020, October - 2019, October - 2020, November - 2019, November - 2018, December - 2018, December - 2019, December - 2020,

Showing Page Number : 1 of 1

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 8 8 4.696146 46.396146 39.92 56% 51%
December - 2019
Completed.
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 10 2.5 2.267 43.967 39.92 56% 48%
November - 2019
Work on 10 Km in progress. Shingle road (width 18 ft avg).
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 10 2.5 2.5 44.2 39.92 56% 48%
October - 2019
Work on 10 Km in progress. Shingle road (width 18 ft avg).
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 10 2.5 0 41.7 39.92 56% 46%
September - 2019
Work on 10 Km in progress. Shingle road (width 18 ft avg).
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 10 2.5 0 41.7 39.92 56% 46%
August - 2019
Work on 10 Km in progress. Shingle road (width 18 ft avg).
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 4.697 4.697 4.697 46.397 39.92 56% 51%
May - 2020
Original scope Completed. Revsion under process for additional scope from savings
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 4.697 4.697 4.697 46.397 39.92 56% 51%
April - 2020
Original scope Completed. Revsion under process for additional scope from savings
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 4.697 4.697 4.697 46.397 39.92 56% 51%
March - 2020
Original scope Completed. Revsion under process for additional scope from savings
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 4.697 4.697 4.697 46.397 39.92 56% 51%
February - 2020
Original scope Completed. Revsion under process for additional scope from savings
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
140831-F/S, Design and Construction of B/TRoad to connect two districts of (10-KM) Districts Dir Lower and Dir Upper.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 91.62 41.7 10 8 8 4.696146 46.396146 39.92 56% 51%
January - 2020
Original scope Completed. Revsion under process for additional scope from savings
No Image
1) Package-1 (Km-1 to 4)
2) Package-2 (Km-5 to 7)
3) Package-3 (Km-8 to 10)
846
(OG)
150883-Pavement of roads / Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 300.636 0.001 0.001 0.0005 0 300.636 99.363 75% 75%
September - 2018
75 units - 40% work completed (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
846
(OG)
150883-Pavement of roads / Streets in different UCs of PK-50 Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 400 300.636 0.001 0.001 0.0005 0 300.636 99.363 75% 75%
July - 2018
75 units - 40% work completed (PCC BT componenets - avg width 10 - 18 ft).
No Image
1) Pavement of street Aslam Khan Colony and Naeem Khan Colony UC Central
2) Pavement of street at Bashar Colony and Mohallah Sherazi
3) Construction of road The Lexicon School
4) Construction of road/street at Ibrar Colony UC Central
5) Construction of road/street at Mohallah Eidgah
6) Construction of road at Sabzi Mandi UC Central
7) Construction of road/street at Mohallah Kund and Elementary School Mohallah UC Central
8) Construction of road/street at Farooq-e-Azam road to Malik Asad Advocate House
9) Construction of road/street at Mohallah Rehmaniya Town and Model Town UC Central
10) Construction of road/street at Saeeda Abad, Amina Abad
11) Construction of road/street at Roshan Abad, Alma Abad, Karim Abad UC South
12) Construction of road/street at Qazi Abad Kachi road
13) Construction of road/street at Mohallah Aziz Abad UC South
14) Construction of road/street at Banda and Noor Colony UC South
15) Construction of road at TIP HC UC South
16) Construction of road/street at Afzal Abad and Aziz Colony, Raja Abad UC South
17) Construction of road at Nai Abadi (Bilal Masjid to Suzuki stop) Mohara Mahmdu
18) Pavement of street Mohara Mahmdu
19) Construction of road/street at Khyber Adda Mohallah Banda Derwesh
20) Construction of culvert and causeway Mohallah Mughal Abad Mohara Mahmdu UC Mankarai
21) Pavement of street at village Kahaka Pharallah UC Mankarai
22) Construction of road/street at Mankarai UC Mankarai
23) Construction of road/bridge at Meelum UC Derwash
24) Pavement of street at village Derwash
25) Pavement of street at Pathan Colony UC Derwash
26) Construction of road University Mohallah Banda
27) Pavement of street at Mohallah Banda
28) Construction of road at Daband
29) Pavement of street at Doyian Abi
30) Pavement of street at Nasim Town UC Derwash
31) Construction of road from Dispensary to Mohallah Lassan Teen
32) Construction of road from Seen Gali Haq Nawaz Shaheed Teer UC PH Khan
33) Construction of road from Rafique House to Fida House Teer
34) Pavement of street at Mohallah Nalger Teer
35) Pavement of street at Mohallah Mistriya
36) Pavement of street at Mohallah Dahmghar and Ibrahim UC PJ Khan
37) Construction of road at Mohallah Dahangri UC PH Khan
38) Construction of road/streets at village PH Khan Mohallah Mohara and Naigar
39) Pavement of road/streets at Mohallah Neeli Dhaki and Mohari UC PH Khan
40) Construction of road Mohallah Saydan Maira, Mohallah Nikka to Lambi Dheri UC PH Khan
41) Construction of road/streetsat village Chapri and Magri UC PH Khan
42) Construction of Mohari No.1 road
43) Construction 0f Gujjar Mohara road
44) Construction of road/streets at village Nartopa UC PH Khan
45) Construction of raod from graveyard to Sikandarpur
46) Construction of road from Mohallah Younis Abad to GGHS Sikandarpur
47) Construction of road at Raja Abad Dheri UC Sikandarpur
48) Construction of road Hasrat Abad Dheri
49) Construction of road Chaonian road at graveyard Sikandarpur near Mosque UC Sikandarpur
50) Construction of road (Tandoor wala) N/O Akhtar Shah Malkiyar
51) Construction of road Mughal Abad Malkiyar UC Sikandarpur
52) Construction of road at Mohallah Shaeedan Makhan Colony UC Sikandarpur
53) Construction of road at N/O of Babu Khalid Sikandarpur
54) Construction of road/strest at Dahral-ul-Aloom UC Sikandarpur
55) Construction of road/street at Upper Ramzani
56) Construction of nallah/path at Mohallah Babu
57) Construction of road/street Mohallah Kahoo UC North
58) Construction of street Mohallah Asif Abad
59) Pavement of street/drain at Mohallah Sawatian
60) Pavement of streets at Sessin House UC North
61) Pavement of street a Karrach
62) Construction of path at Mangloor Colony (Sob Yousaf)
63) Pavement of road/street path at Noorpur, Lohar Darra UC Sarai Nimat
64) Pavement of street at Mohara
65) Pavement of street at Shingri Bagh
66) Construction of road at Kundal Hajj
67) Construction of path at Bayian Ahmad Ali Khan
68) Pavement of road/street at Sarai Nimat Khan
69) Pavement of road/street Ainpur/Golra UC Serai Nimat Khan
70) Construction of road at Dharam Pani
71) Pavement of street at Talhad
72) Pavement of street/path at Sairian (Master Ashraf) UC Sarai Nimat Khan
73) Pavement of street at Sarian (Kamrala/Karlan)
74) Pavement of street/path at Bandi Mian Pir Dad
75) Pavement of street at Plasi Maira
76) Construction of path Sarai Nimat Khan (Zardar and Miskeen House) UC Sarai Nimat Khan
77) Construction of road at Paswal
78) Pavement of street at Banda Munir Khan
79) Mohallah Mohrian Nehari Abad UC Sarai Nimat Khan
80) Pavement of road at Teer
81) Construction of road at Sikandarpur Farooq-e-Azam (boundary wall)
82) Construction of road Mohallah City
83) Construction of road Diff Mohallah City No.1 Haripur
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
December - 2020
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
December - 2020
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
October - 2020
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
September - 2020
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
August - 2020
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 -
July - 2020
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
May - 2021
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
April - 2021
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
March - 2021
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
February - 2021
No Image
846
(OG)
191537-990088 - Award of Scholarships to Tribal Medical Students [MA]
Provincial
30-11--1 30-11--1 - 30-11--1 - 142.614 112.614 0 0 0 0 112.614 0 - -
January - 2021
No Image
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.215 20 24 24 20 225.215 124.785 64% 64%
December - 2018
Length 16 Km (10 units) - 8 Km asphalt completed, sub base, WBM, structure work in process.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.215 20 20 20 20 225.215 124.785 64% 64%
November - 2018
Length 16 Km (10 units) - 8 Km asphalt completed, sub base, WBM, structure work in process.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.215 20 20 20 20 225.215 124.785 64% 64%
November - 2018
Length 16 Km (10 units) - 8 Km asphalt completed, sub base, WBM, structure work in process.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-Feasibility Study, Design / Construction of Road Pavment "Boko to Tashkand Road, Jhanda Pajaman Road, Bada Check Post via Mangal Chai to Gabasni, Marghuz Yousafi Road, Pabani Road, Zarobi Road, Kalabat Khazana Road, Sharshamai Kotha Road, Yara Khel Lar Kotha Road, Kalabat Topi Swabi Road, Pabaini Road Gandaf Lar, Kotha Swabi Road Naray Lar, Arbazo Chowk to Tariq Maneri Payan Road (2.2 Km), Darra Bridge to Panjpir Road (1.4 Km), Qadray Kaka Hujra to Shamaqo Masjid (Marghuz), Naray Lar Zandy Panjpir (1.2 Km), Swabi, Maner Dagai Lar Road (2 Km), Bilal Masjid to via Shagai Neher to Small Neher (2.5 Km), Kandaro Road Maneri Payan (1 Km), Main Road Jehangira to Darra Village", District Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.217 20 24 24 24 229.217 124.783 64% 65%
April - 2019
Length 22.3 Km (15 units) - 8 Km asphalt completed, sub base, WBM, structure work in process. Revised PC-I/DCE for Rs.350 m submitted.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.217 20 24 24 24 229.217 124.783 64% 65%
March - 2019
Length 22.3 Km (15 units) - 8 Km asphalt completed, sub base, WBM, structure work in process. Revised PC-I/DCE for Rs.350 m submitted.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.217 20 24 24 24 229.217 124.783 64% 65%
March - 2019
Length 22.3 Km (15 units) - 8 Km asphalt completed, sub base, WBM, structure work in process. Revised PC-I/DCE for Rs.350 m submitted.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.217 20 24 24 20 225.217 124.783 64% 64%
February - 2019
Length 22.3 Km (15 units) - 8 Km asphalt completed, sub base, WBM, structure work in process.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)
846
(OG)
150853-F/S, Design / construction of road and street pavment (a) Boko-Tashkand (b) Jhanda-Pajaman (c) Bada Ceck Post via Mangal Chai-Gabasni (d) Marguz-Yousafi (e) Pabani (f) Zarobi (g) Kalabat-Khazana (h) Sharshami Lar Kotha (i) Yara Khel Lar Kotha (j) Kalabat-Topi Swabi (l) Pabini, (k) Kotha, Swabi.
Swabi
30-11--1 30-11--1 - 30-11--1 - 350 205.217 20 24 24 20 225.217 124.783 64% 64%
January - 2019
Length 16 Km (10 units) - 8 Km asphalt completed, sub base, WBM, structure work in process.
No Image
1) Boko to Tashkand road (2 Km) Package-1
2) Boko to Tashkand road (2.80 Km) Package-2
3) Jhanda Panjmanroad (0.457 Km)
4) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-1
5) Bada Check Post via Mangal Chai to Gabasni road (2 Km) Package-2
6) Bada Check Post via Mangal Chai to Gabasni road (1.80 Km) Package-3
7) Marghuz Yousafi road (2.80 Km)
8) Pabani road (1 Km)
9) Zaroobi road (5 Km)
10) Kalabat Khazana road (1 Km)
11) Sharshami Lar Kotha road (1.4 Km)
12) Yara Khel Lar Kotha road (1.6 Km)
13) Kalabat Topi Swabi raod (1 Km)
14) Pabinin road (Gandaf Lar) (1 Km)
15) Kotha Swabi raod Naray Lar (1 Km)