Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
842 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 11.794 | 5.541 | 151.966 | 13.987 | 92% |
83% September - 2018 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. |
No Image |
Haripur | |||||||||||||||||||
842 (OG) |
150686-Construction of roads (a) Mohari to Akhun Bandi Bridge (b) Durnian to Thipra to Mirupur Kahal road (c) Talhad village road and (d) Badshaia to Rehana Maira road District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184 | 146.425 | 23.588 | 23.588 | 11.794 | 0 | 146.425 | 13.987 | 92% |
80% July - 2018 |
Length 13.3 Km width 12 ft - earth work and structure work in progress. |
No Image |
Haripur | |||||||||||||||||||
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- December - 2020 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- December - 2020 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- October - 2020 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- September - 2020 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- August - 2020 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
July - 2020 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- May - 2021 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- April - 2021 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- March - 2021 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- February - 2021 |
No Image | |
842 (OG) |
191505-060013 - Health Management Information System in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 216.936 | 173.486 | 0 | 0 | 0 | 0 | 173.486 | 0 | - |
- January - 2021 |
No Image | |
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.327 | 28.327 | 100 | 0 | 100% |
100% December - 2018 |
Length 8 Km - embankment, WBM completed. |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.327 | 28.327 | 100 | 0 | 100% |
100% November - 2018 |
Length 8 Km - embankment, WBM completed. |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.327 | 28.327 | 100 | 0 | 100% |
100% November - 2018 |
Length 8 Km - embankment, WBM completed. |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.3265 | 28.3265 | 99.9995 | 0 | 100% |
100% April - 2019 |
Completed (8 Km). (Physically). |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.3265 | 28.3265 | 99.9995 | 0 | 100% |
100% March - 2019 |
Completed (8 Km). (Physically/financially). |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.3265 | 28.3265 | 99.9995 | 0 | 100% |
100% March - 2019 |
Completed (8 Km). (Physically/financially). |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.3265 | 28.3265 | 99.9995 | 0 | 100% |
100% February - 2019 |
Length 8 Km - Completd. (Physically = financially ) |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 71.673 | 28.327 | 28.327 | 28.327 | 28.327 | 100 | 0 | 100% |
100% January - 2019 |
Length 8 Km - embankment, WBM completed. |
No Image |
1) Shah Mansoor Town to Sikandariroad (0.88 Km) width 18ft
2) GGHS Maneri Bala to Saleem Khan Chowk road (3.500 Km) width 18ft
3) Panjpir main road to Shaga Bridge (2.20 Km) width 18ft
4) Qazi Abad to Aboo Banda raod (1.800 Km) width 18ft | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 120 | 120 | 110.5 | 241.94 | 618.661 | 27% |
28% December - 2019 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 105 | 105 | 105 | 236.44 | 618.661 | 27% |
28% November - 2019 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 105 | 105 | 105 | 236.44 | 618.661 | 27% |
28% October - 2019 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 100 | 100 | 25 | 156.44 | 618.661 | 27% |
18% September - 2019 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 100 | 25 | 15 | 146.44 | 618.661 | 27% |
17% August - 2019 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 291.327 | 291.327 | 291.327 | 422.767 | 618.661 | 27% |
50% May - 2020 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 291.327 | 291.327 | 291.327 | 422.767 | 618.661 | 27% |
50% April - 2020 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 291.327 | 291.327 | 291.327 | 422.767 | 618.661 | 27% |
50% March - 2020 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 291.327 | 291.327 | 291.327 | 422.767 | 618.661 | 27% |
50% February - 2020 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
842 (OG) |
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska |
Swat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 850.101 | 131.44 | 100 | 120 | 120 | 119.8 | 251.24 | 618.661 | 27% |
30% January - 2020 |
Package-1, Package-2 - Work in progress. . Package-3 - WBM in progress. |
No Image |
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3 | |||||||||||||||||||
Pages : 1 |