Progressive Review for the month(s) of : January - 2020, January - 2021, January - 2018, January - 2019, February - 2019, February - 2020, February - 2021, February - 2018, March - 2019, March - 2020, March - 2021, March - 2018, April - 2019, April - 2020, April - 2021, April - 2018, May - 2020, May - 2021, May - 2018, June - 2018, July - 2020, July - 2017, July - 2018, August - 2019, August - 2020, August - 2017, September - 2019, September - 2020, September - 2017, September - 2018, October - 2019, October - 2020, October - 2017, November - 2019, November - 2017, November - 2018, December - 2018, December - 2019, December - 2020, December - 2017,

Showing Page Number : 1 of 3

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
821
(OG)
140881-F/S, Design, BT and Extention of road from Sujal Kot to Thesi (8 Km), Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 118.498 71.634 5 5 5 2.5 74.134 41.864 65% 63%
September - 2018
Length 8 Km - earth work 80%, masnory work 45% completed.
No Image
Abbottabad
821
(OG)
140881-F/S, Design, BT and Extention of road from Sujal Kot to Thesi (8 Km), Abbottabad.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 118.498 71.634 5 5 2.5 0 71.634 41.864 65% 60%
July - 2018
Length 8 Km - earth work 80%, masnory work 45% completed.
No Image
Abbottabad
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
December - 2017
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress. Court case on land.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
September - 2017
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress. Court case on land.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
August - 2017
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress. Court case on land.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
July - 2017
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress. Court case on land.
No Image
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner.
Buner
30-11--1 30-11--1 - 30-11--1 - 250 51.439 25 25 25 25 76.439 173.561 31% 31%
December - 2019
Length 11.3 Km - 8 units in progress. Demand 50 M
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
November - 2017
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress. Court case on land.
No Image
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner
Buner
30-11--1 30-11--1 - 30-11--1 - 200 51.439 25 25 25 25 76.439 123.561 38% 38%
November - 2019
Length 11.3 Km - 8 units in progress.Revised DCE for Rs. 250 M approved in PDWP on 8/10/2019. AA Awaited.
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
October - 2017
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress. Court case on land.
No Image
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner
Buner
30-11--1 30-11--1 - 30-11--1 - 200 51.439 25 25 6.25 6.25 57.689 123.561 38% 29%
October - 2019
Length 11.3 Km - 8 units in progress.Revised DCE for Rs. 250 M approved in PDWP on 8/10/2019. AA Awaited.
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner
Buner
30-11--1 30-11--1 - 30-11--1 - 200 51.439 25 25 6.25 6.25 57.689 123.561 38% 29%
September - 2019
Length 11.3 Km - 8 units in progress.Revised DCE for Rs. 250 M approved in PDWP on 8/10/2019. AA Awaited.
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner
Buner
30-11--1 30-11--1 - 30-11--1 - 200 51.439 25 25 6.25 0 51.439 123.561 38% 26%
August - 2019
Length 11.3 Km - 8 units in progress.
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
June - 2018
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress.
No Image
Totalai Buner
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2018
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress.
No Image
Totalai Buner
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner.
Buner
30-11--1 30-11--1 - 30-11--1 - 250 51.439 25 25 25 25 76.439 173.561 31% 31%
May - 2020
Length 11.3 Km - 8 units in progress. Demand 50 M
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
April - 2018
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress.
No Image
Totalai Buner
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner.
Buner
30-11--1 30-11--1 - 30-11--1 - 250 51.439 25 25 25 25 76.439 173.561 31% 31%
April - 2020
Length 11.3 Km - 8 units in progress. Demand 50 M
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
March - 2018
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress.
No Image
Totalai Buner
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner.
Buner
30-11--1 30-11--1 - 30-11--1 - 250 51.439 25 25 25 25 76.439 173.561 31% 31%
March - 2020
Length 11.3 Km - 8 units in progress. Demand 50 M
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
February - 2018
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress.
No Image
Totalai Buner
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner.
Buner
30-11--1 30-11--1 - 30-11--1 - 250 51.439 25 25 25 25 76.439 173.561 31% 31%
February - 2020
Length 11.3 Km - 8 units in progress. Demand 50 M
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
January - 2018
(XEN Charsadda - focal person). PC-II for Rs.10 m approved in DDWP on 07/10/2016. LOA issued (MAK) on 15/02/2017. Survey in progress.
No Image
821
(OG)
150798-Construction and Blacktopping of roads in PK-77 District Buner.
Buner
30-11--1 30-11--1 - 30-11--1 - 250 51.439 25 25 25 25 76.439 173.561 31% 31%
January - 2020
Length 11.3 Km - 8 units in progress. Demand 50 M
No Image
1) Charkot to Ghazi Kot 2.30 Km (improvement/BT)
2) Charkot to Mangal Thana 1 Km (improvement/BT)
3) Swawai to Batkanai 1 Km ( improvement/BT)
4) Darahind road 1 Km (improvement/BT)
5) Dandikot road 1 Km (improvement/BT)
6) Badir to Ashari 1 Km (improvement/BT)
7) Khanano Dheri to Banda Tangai road 2 Km (improvement/widening and extension)
8) Banda Tangai to Nagrai raod 2 Km (improvement/widening and extension)
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
- - - - Line Deptt 10 0 0 0 0 0 0 10 - -
December - 2017
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
- - - - Line Deptt 10 0 0 0 0 0 0 10 - -
September - 2017
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
- - - - Line Deptt 10 0 0 0 0 0 0 10 - -
August - 2017
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC.
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
- - - - Line Deptt 10 0 0 0 0 0 0 10 - -
July - 2017
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC.
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 10 0 0 0 0 0 0 10 - -
November - 2017
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 10 0 0 0 0 0 0 10 - -
October - 2017
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
June - 2018
PC-II for Rs.10 m approved. LOA issued to MAK Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person PBC -II).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2018
PC-II for Rs.10 m approved. LOA issued to MAK Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person PBC -II).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
April - 2018
PC-II for Rs.10 m approved. LOA issued to MAK Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person PBC -II).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
March - 2018
PC-II for Rs.10 m approved. LOA issued to MAK Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person PBC -II).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 10 0 0 0 0 0 0 10 - -
February - 2018
PC-II for Rs.10 m approved. LOA issued to MAK Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 10 0 0 0 0 0 0 10 - -
January - 2018
PC-II for Rs.10 m approved. LOA issued to Mach Consultant on 15/02/2017. Master planning finalized and submitted to PHC (focal person).
No Image
Charsadda
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
December - 2017
PC-I under preparation (XEN Charssada focal person) MAK consultant selected.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
September - 2017
PC-I under preparation (XEN Charssada focal person) MAK consultant selected.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
August - 2017
PC-I under preparation (XEN Charssada focal person) MAK consultant selected.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
- - - - Line Deptt 0 0 0 0 0 0 0 0 - -
July - 2017
PC-I under preparation (XEN Charssada focal person) MAK consultant selected.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
November - 2017
PC-I under preparation (XEN Charssada focal person) MAK consultant selected.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
October - 2017
PC-I under preparation (XEN Charssada focal person) MAK consultant selected.
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
June - 2018
PC-I under preparation (XEN Charssada focal person) MAK consultant selected. Site not available.
No Image
DI.Khan
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2018
PC-I under preparation (XEN Charssada focal person) MAK consultant selected. Site not available.
No Image
DI.Khan
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
April - 2018
PC-I under preparation (XEN Charssada focal person) MAK consultant selected. Site not available.
No Image
DI.Khan
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
March - 2018
PC-I under preparation (XEN Charssada focal person) MAK consultant selected. Site not available.
No Image
DI.Khan
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
February - 2018
PC-I under preparation (XEN Charssada focal person) MAK consultant selected. Site not available.
No Image
DI.Khan
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
January - 2018
PC-I under preparation (XEN Charssada focal person) MAK consultant selected. (Site not available)
No Image
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Hangu
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
June - 2018
PC-I/DCE submitted to Registrar PHC Peshawar by MAK consulant. Master planning finalized and submitted to PHC (focal person PBC-II).
No Image
Jundicial Complex at Thall Hangu
821
(New)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand), Thall (Hangu), Shabqadar (Charsadda), Tank, Totalai (Buner) and Kulachi (DI.Khan) (PC-II approved).
Hangu
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2018
PC-I/DCE submitted to Registrar PHC Peshawar by MAK consulant. Master planning finalized and submitted to PHC (focal person PBC-II).
No Image
Jundicial Complex at Thall Hangu