Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
- | 30-06-18 | - | - | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
- | 30-06-18 | - | - | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
- | 30-06-18 | - | - | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
- | 30-06-18 | - | - | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
No Image | |
819 (OG) |
140782-F/S, Design, Construction, Improvement and Black Topping of Roads in Galyat Region, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 324.287 | 116.05 | 25 | 25 | 25 | 12.5 | 128.55 | 183.237 | 43% |
40% September - 2018 |
Length 26 Km (5 units) - earth work, structure work in progress. |
No Image |
1) Improvement/expansion and BT of Kahu to Julial road (2 Km) PK-45
2) Construction of road from Jandal to Lower Palak road (6 Km) PK-45
3) Improvement and BT of road from Mumbal to Kurli road (4 Km) PK-45
4) Improvement and BT of road from Butti to Lower Surjal Dana raod (10 Km) PK-45
5) Rehabilitation of flood damage road i/c bridge at Hoterol to BHU Mohra (4 Km) PK-45 | |||||||||||||||||||
819 (OG) |
140782-F/S, Design, Construction, Improvement and Black Topping of Roads in Galyat Region, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 324.287 | 116.05 | 25 | 25 | 12.5 | 0 | 116.05 | 183.237 | 43% |
36% July - 2018 |
Length 26 Km (5 units) - earth work, structure work in progress. |
No Image |
1) Improvement/expansion and BT of Kahu to Julial road (2 Km) PK-45
2) Construction of road from Jandal to Lower Palak road (6 Km) PK-45
3) Improvement and BT of road from Mumbal to Kurli road (4 Km) PK-45
4) Improvement and BT of road from Butti to Lower Surjal Dana raod (10 Km) PK-45
5) Rehabilitation of flood damage road i/c bridge at Hoterol to BHU Mohra (4 Km) PK-45 | |||||||||||||||||||
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
No Image | |
819 (New) |
170191-Construction of Peshawar High Court Abbottabad Bench -ERRA funded(GoKP Share). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 80 | 0 | 80 | 80 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
No Image | |
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 199.099 | 50% |
50% December - 2019 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Revised- Technical Evaluatiion of contractor in progress. Demand 40 M |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 99.099 | 67% |
67% November - 2019 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress.
Revised- tender called on 26/11/2019. |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 190.901 | 10 | 10 | 10 | 8.75 | 199.651 | 99.099 | 67% |
67% October - 2019 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress.
Revised- tender called on 26/11/2019. |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 190.901 | 10 | 10 | 2.5 | 2.5 | 193.401 | 99.099 | 67% |
64% September - 2019 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress.
Revised approved for Rs. 400 m on 8/10/2019. AA awaited. |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 190.901 | 10 | 10 | 2.5 | 2.5 | 193.401 | 99.099 | 67% |
64% August - 2019 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Liability Rs.10 m. |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 199.099 | 50% |
50% May - 2020 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Revised- Technical recalled on 17/2/20. Demand Rs. 5 M |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 199.099 | 50% |
50% April - 2020 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Revised- Technical recalled on 17/2/20. Demand Rs. 5 M |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 199.099 | 50% |
50% March - 2020 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Revised- Technical recalled on 17/2/20. Demand Rs. 5 M |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 199.099 | 50% |
50% February - 2020 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Revised- Technical recalled on 17/2/20. Demand Rs. 5 M |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140638-F/S, design, improvement, B/T and extention of Budal-Jabo road via Sher Ali, (20-KM) District Buner. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 190.901 | 10 | 10 | 10 | 10 | 200.901 | 199.099 | 50% |
50% January - 2020 |
Length 20 Km - Pack-1 (1 to 12 Km) - earth work, structure in progress. Pack-2 (13 to 20 Km) - earth work. Structure work in progress. Revised- Technical recalled on 17/2/20. Demand Rs. 5 M |
No Image |
Package-1 (Km-1 to 12) PK-78 Buner
Package-2 (Km-13 to 20) PK-78 Buner | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.145 | 15 | 19.912 | 19.912 | 19.912 | 742.057 | 272.85 | 73% |
73% December - 2018 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.145 | 15 | 19.912 | 19.912 | 19.912 | 742.057 | 272.85 | 73% |
73% November - 2018 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.145 | 15 | 19.912 | 19.912 | 19.912 | 742.057 | 272.85 | 73% |
73% November - 2018 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.146 | 15 | 19.912 | 19.912 | 19.912 | 742.058 | 272.849 | 73% |
73% April - 2019 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.146 | 15 | 19.912 | 19.912 | 19.912 | 742.058 | 272.849 | 73% |
73% March - 2019 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.146 | 15 | 19.912 | 19.912 | 19.912 | 742.058 | 272.849 | 73% |
73% March - 2019 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.146 | 15 | 19.912 | 19.912 | 19.912 | 742.058 | 272.849 | 73% |
73% February - 2019 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
140935-F/S, Design, Impr & Wid of Roads (a) Akora Khattak-Guldheri, Manai, Duran, Tarkhel, (b) Shahab Khel-Guldheri, ? Pitao-Dam, (d) Kaka Sahib-Khwar Miangan, (e) K.S-Bagh Gali (f) Khwar-Pitao, (g) Pitao-Sawarkhel, (h) K.S-A bkhel Wali, (i) Walai MR-S.K via Khwar, (j) K.S-Kili Kandao, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 722.146 | 15 | 19.912 | 19.912 | 19.912 | 742.058 | 272.849 | 73% |
73% January - 2019 |
Original scope - 27 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 0 | 698 | 140 | 140 | 110.458 | 110.458 | 507 | 58% |
9% May - 2021 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
Scope of work:
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 0 | 698 | 222.817 | 222.817 | 83.48 | 83.48 | 507 | 58% |
7% April - 2021 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 698 | 510.8 | 30.696 | 356.744 | 180.952 | 85% |
30% December - 2020 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 698 | 510.8 | 30.696 | 356.744 | 180.952 | 85% |
30% December - 2020 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 698 | 174 | 8.0833 | 334.1313 | 180.952 | 85% |
28% October - 2020 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress. |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 698 | 174 | 7.5 | 333.548 | 180.952 | 85% |
28% September - 2020 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress. |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 698 | 174 | 0 | 326.048 | 180.952 | 85% |
27% August - 2020 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress. |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 0 | 0 | 0 | 326.048 | 180.952 | 85% |
27% July - 2020 |
Raft foundation, RW, Column pouring, Brick work in progress. |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 0 | 698 | 380.819 | 380.819 | 61.551 | 61.551 | 507 | 58% |
5% March - 2021 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 0 | 698 | 380.819 | 380.819 | 61.551 | 61.551 | 507 | 58% |
5% February - 2021 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
| |||||||||||||||||||
819 (OG) |
130630-Upgradation of Existing Accident & Emergency Unit and ICU at HMC, Peshawar. |
Peshawar PBC-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1205 | 326.048 | 698 | 510 | 510.8 | 30.696 | 356.744 | 180.952 | 85% |
30% January - 2021 |
Tyles work in progress. Plumbing work in progrss.
Electrict work in progress.
Revised TS Submitted to SE |
No Image |
HMC Peshawar
| |||||||||||||||||||
Pages : 1 |