Progressive Review for the month(s) of : January - 2021, January - 2018, January - 2019, January - 2020, February - 2021, February - 2018, February - 2019, February - 2020, March - 2021, March - 2018, March - 2019, March - 2020, April - 2021, April - 2018, April - 2019, April - 2020, May - 2021, May - 2018, May - 2020, June - 2018, July - 2017, July - 2018, July - 2020, August - 2017, August - 2019, August - 2020, September - 2020, September - 2017, September - 2018, September - 2019, October - 2020, October - 2017, October - 2019, November - 2017, November - 2018, November - 2019, December - 2020, December - 2017, December - 2018, December - 2019,

Showing Page Number : 1 of 2

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
16-05-13 - - 15-09-17 - 730 578.036 30 30 0 0 578.036 121.964 83% 79%
December - 2017
Main building, bar room, mosque, shed, tube well 85% completed. Rev PC-I approved Rs.859 m. NIT floated for opening on 08/01/2018.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
16-05-13 - - 29-11-12 - 585.646 578.036 30 30 0 0 578.036 0 100% 99%
September - 2017
Main building, bar room, mosque, shed, tube well in progress. Revised PC-I/DCE for Rs.842 m submited to Registrar PHC on 27/01/2017.Pre- PDWP held.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
16-05-13 - - 29-11-12 - 585.646 578.036 30 30 0 0 578.036 0 100% 99%
August - 2017
Main building, bar room, mosque, shed, tube well in progress. Revised PC-I/DCE for Rs.908.131 m submited to Registrar PHC on 27/01/2017.Pre- PDWP held.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
16-05-13 - - 29-11-12 - 585.646 578.036 30 30 0 0 578.036 0 100% 99%
July - 2017
Main building, bar room, mosque, shed, tube well in progress. Revised PC-I/DCE for Rs.908.131 m submited to Registrar PHC on 27/01/2017.Pre- PDWP held.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 730 578.036 30 30 0 0 578.036 121.964 83% 79%
November - 2017
Main building, bar room, mosque, shed, tube well in progress. Rev PC-I approved Rs.859 m. AA awaited.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 730 578.036 30 30 0 0 578.036 121.964 83% 79%
October - 2017
Main building, bar room, mosque, shed, tube well in progress.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 859 608.426 30 30 30 30 638.426 220.574 74% 74%
June - 2018
Main building, bar room, mosque, shed, tube well 85% completed. Balance work - work started.
No Image
Judicial Complex Haripur
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 859 608.426 30 30 30 30 638.426 220.574 74% 74%
May - 2018
Main building, bar room, mosque, shed, tube well 85% completed. Balance work - work started. Demand Rs.100 m.
No Image
Judicial Complex Haripur
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 859 608.426 30 30 25 25 633.426 220.574 74% 74%
April - 2018
Main building, bar room, mosque, shed, tube well 85% completed. Balance work - work started. Demand Rs.100 m.
No Image
Judicial Complex Haripur
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 859 608.426 30 30 25 25 633.426 220.574 74% 74%
March - 2018
Main building, bar room, mosque, shed, tube well 85% completed. Balance work - work started. Demand Rs.100 m.
No Image
Judicial Complex Haripur
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 859 608.426 30 30 15 15 623.426 220.574 74% 73%
February - 2018
Main building, bar room, mosque, shed, tube well 85% completed. Balance work - Work started.
No Image
807
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 730 578.036 30 30 15 15 593.036 121.964 83% 81%
January - 2018
Main building, bar room, mosque, shed, tube well 85% completed. Rev PC-I approved Rs.859 m. NIT floated for opening on 08/01/2018.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
December - 2020
Completed.
No Image
1) BHU Marai Payan ? Rs: 1.170 M
2) BHU Khadar Khel ? Rs: 1.933 M
3) RHC Gumbat ? Rs: 2.561 M
4) RHC Chorlaki? Rs: 4.720 M
5) BHU Tolanj.? Rs: 0.944 M
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
December - 2020
Completed.
No Image
1) BHU Marai Payan ? Rs: 1.170 M
2) BHU Khadar Khel ? Rs: 1.933 M
3) RHC Gumbat ? Rs: 2.561 M
4) RHC Chorlaki? Rs: 4.720 M
5) BHU Tolanj.? Rs: 0.944 M
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 0 0 0 0 0 0 11.328 - -
October - 2020
Completed.
No Image
1) BHU Marai Payan
2) BHU Khadar Khel  
3) RHC Gumbat
4) RHC Chorlaki
5) BHU Tolanj.
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 0 0 0 0 0 0 11.328 - -
September - 2020
Completed.
No Image
1)
2)
3)
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 0 0 0 0 0 0 11.328 - -
August - 2020
Completed.
No Image
1)
2)
3)
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 0 0 0 0 0 0 11.328 - -
July - 2020
Completed.
No Image
1)
2)
3)
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
May - 2021
05/05 units work Completed.
No Image
1. BHU Marai Payan ? Rs. 1.170 M, TS 1.051
2. BHU Khadar Khel ? Rs. 1.933 M, TS 1.873
3. RHC Gumbat ? Rs. 2.561 M
4. RHC Chorlaki? Rs. 4.720 M
5. BHU Tolanj.? Rs. 0.944 M
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
April - 2021
05 units Completed.
No Image
1) BHU Marai Payan ? Rs: 1.170 M (TS 1.051)
2) BHU Khadar Khel ? Rs: 1.933 M (TS 1.873)
3) RHC Gumbat ? Rs: 2.561 M
4) RHC Chorlaki? Rs: 4.720 M
5) BHU Tolanj.? Rs: 0.944 M
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
March - 2021
05 units Completed.
No Image
1) BHU Marai Payan ? Rs: 1.170 M (TS 1.051)
2) BHU Khadar Khel ? Rs: 1.933 M (TS 1.873)
3) RHC Gumbat ? Rs: 2.561 M
4) RHC Chorlaki? Rs: 4.720 M
5) BHU Tolanj.? Rs: 0.944 M
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
February - 2021
05 units Completed.
No Image
1) BHU Marai Payan ? Rs: 1.170 M (TS 1.051)
2) BHU Khadar Khel ? Rs: 1.933 M (TS 1.873)
3) RHC Gumbat ? Rs: 2.561 M
4) RHC Chorlaki? Rs: 4.720 M
5) BHU Tolanj.? Rs: 0.944 M
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Kohat
30-11--1 30-11--1 - 30-11--1 - 11.328 9.916 0 0 0 0 9.916 1.412 - 88%
January - 2021
Completed.
No Image
1) BHU Marai Payan ? Rs: 1.170 M
2) BHU Khadar Khel ? Rs: 1.933 M
3) RHC Gumbat ? Rs: 2.561 M
4) RHC Chorlaki? Rs: 4.720 M
5) BHU Tolanj.? Rs: 0.944 M
807
(OG)
140670-F/S, Design & Construction / Improvement of (a) Kulhari Gharbi Road (2.5 Km) (b) PCC Road from GHSS Baffa to Kharah (Kulhari Sharqi) & (c) Kulhari Sharqi Baffa (1 Km), District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 50 39.6 17 17 17 8.5 48.1 0 100% 96%
September - 2018
Length 4.8 Km - Physically completed.
No Image
PK-55, Mansehra
807
(OG)
140670-F/S, Design & Construction / Improvement of (a) Kulhari Gharbi Road (2.5 Km) (b) PCC Road from GHSS Baffa to Kharah (Kulhari Sharqi) & (c) Kulhari Sharqi Baffa (1 Km), District Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 50 39.6 17 17 8.5 0 39.6 0 100% 79%
July - 2018
Length 4.8 Km - Physicaly complete.
No Image
PK-55, Mansehra
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
December - 2020
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
December - 2020
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
October - 2020
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
September - 2020
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
August - 2020
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
July - 2020
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 9.689 0 0 0 0 9.689 0.761 - 93%
May - 2021
07- Units All Completed & HO.
No Image
  1. BHU Mohib Banda PK-51
  2. BHU Garhi Ismailzai PK-51
  3. BHU Shamat Pur PK-51
  4. BHU Katti Garhi PK-49
  5. BHU Charguli PK-49
  6. RHC Palo Dheri PK-49
  7. BHU Kohi Barmol PK-48
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 9.689 0 0 0 0 9.689 0.761 - 93%
April - 2021
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 9.689 0 0 0 0 9.689 0.761 - 93%
March - 2021
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 9.689 0 0 0 0 9.689 0.761 - 93%
February - 2021
Completed & HO.
No Image
807
(OG)
120888-Integration of Health Services Delivery with special focus on MNCH, LHW, EPI and Nutrition Programme (DFID & AusAid Assisted. Foreign Cost Rs. 8.12 Bn).
Mardan
30-11--1 30-11--1 - 30-11--1 - 10.45 0 0 0 0 0 0 10.45 - -
January - 2021
Completed & HO.
No Image
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 19.006 11.776104 152.770104 0 100% 95%
December - 2019
Completed (original scope 9 Km). Revised scope of work - in progress.
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 4.752 4.338 145.332 0 100% 91%
November - 2019
Completed (original scope 9 Km). Revised scope of work - in progress.
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 4.752 4.752 145.746 0 100% 91%
October - 2019
Completed (original scope 9 Km). Revised scope of work - in progress.
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 4.752 4.752 145.746 0 100% 91%
September - 2019
Completed (original scope 9 Km). Revised scope of work - in progress.
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 4.752 4.782 145.776 0 100% 91%
August - 2019
Completed (original scope 9 Km). Revised scope of work - in progress.
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 19.006 18.673 159.667 0 100% 100%
May - 2020
Completed (original scope 9 Km). Revised scope of work - in progress. RS. 24.40 M required as per TS + incorrect PFY
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 19.006 17.578 158.572 0 100% 99%
April - 2020
Completed (original scope 9 Km). Revised scope of work - in progress. RS. 24.40 M required as per TS + incorrect PFY
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 19.006 17.578 158.572 0 100% 99%
March - 2020
Completed (original scope 9 Km). Revised scope of work - in progress. RS. 24.40 M required as per TS + incorrect PFY
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 19.006 17.578 158.572 0 100% 99%
February - 2020
Completed (original scope 9 Km). Revised scope of work - in progress. RS. 24.40 M required as per TS + incorrect PFY
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
140931-F/S, Design & Const: a)Btgm Nehr-DolatZai b)Katlng-Kudi Noor c)Dubi Ada-Srekh d)Gani Shekh Behani e)Katlng- Qaziabad f)Garhi rd Mardan Rural g)Bakhshali Dheri-Jungarha h)Bakhshali Chargulay-Barikab i)Lura B/Bala Garhi j)Naseer Kili-Shikhano Babainy
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 160 140.994 19.006 19.006 19.006 11.776104 152.770104 0 100% 95%
January - 2020
Completed (original scope 9 Km). Revised scope of work - in progress. RS. 24.40 M required as per TS + incorrect PFY
No Image
1) Battagram Nehar to Daulatzai road (1.7 Km) UC Kot Daulatzai PK-30 (rehabilitation/improvement) width 18 ft
2) Katlang road to Khudai Noor village road (1.5 Km) UC Babanay PK-30 (rehabilitation/improvement) width 18 ft
3) Dubai Adda to Sreekh village road (1.1 Km) UC Gujrat PK-30 (rehabilitation/improvement) width 18 ft
4) Ghani Sheikh road (1 Km) UC Babenay (construction/BT) width 18 ft
5) Katlang to Qazi Abad (1 Km) UC Fatima (construction/BT) width 12 ft
6) Garhi raod (1.3 Km) UC Mardan Rural (construction/BT) width 12 ft
7) Bakhshali Palo Dheri road to Jungara vilalg (1.4 Km) UC Gujrat (construction/BT) width 18 ft
8) Bakhshali Charguli road Barikab village (2.3 Km) UC Kata Khat (rehabilitation/improvement) width 18 ft
9) Lora Banda road (1.3 Km) UC Bala Garhi (construction/BT) width 18 ft
10) Naseer Killi road to Shikhano road (1 Km) UC Babanay (rehabilitation/improvement) width 18 ft
807
(OG)
170658-Const of internal roads in PK-10, Distt. Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 200 100 10 9.5 7.001 4.5 104.5 90 55% 52%
December - 2018
Internal roads 20 Km - structure work in progress.
No Image
1) Construction of road from Jazz Tower Imdad Mir Koroona Talatan Ghalib Khel road and link road to BHU Ghali Khel 2.30 Km
2) Construction of road from Aza Khel to Naak Band 3 Km
3) Rehabilitation of road from Nawab Chowk Khanow UC Sherkara 2.90 Km
4) Construction of Sam No.1 road taking off from Zangali Canal to GPS Garhi Ghulam Muhammad 2.80 Km
5) Construction of Garhi Mumtaz road taking off from Hazar Khwani Canal 2 Km
6) Rehabilitation/construction of Kulu Daag Lara road at Badabera 2 Km
7) Improvement/rehabilitation of Ghaz Chowk to Rural Health Center Aza Khel Village 1 Km
8) Construction of road from Banat Kalay to Major House Mair Surizai 1.20 Km
807
(OG)
170658-Const of internal roads in PK-10, Distt. Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 200 100 10 9.5 4.501 4.5 104.5 90 55% 52%
November - 2018
Internal roads 20 Km - structure work in progress.
No Image
1) Construction of road from Jazz Tower Imdad Mir Koroona Talatan Ghalib Khel road and link road to BHU Ghali Khel 2.30 Km
2) Construction of road from Aza Khel to Naak Band 3 Km
3) Rehabilitation of road from Nawab Chowk Khanow UC Sherkara 2.90 Km
4) Construction of Sam No.1 road taking off from Zangali Canal to GPS Garhi Ghulam Muhammad 2.80 Km
5) Construction of Garhi Mumtaz road taking off from Hazar Khwani Canal 2 Km
6) Rehabilitation/construction of Kulu Daag Lara road at Badabera 2 Km
7) Improvement/rehabilitation of Ghaz Chowk to Rural Health Center Aza Khel Village 1 Km
8) Construction of road from Banat Kalay to Major House Mair Surizai 1.20 Km
807
(OG)
170658-Const of internal roads in PK-10, Distt. Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 200 100 10 9.5 4.501 4.5 104.5 90 55% 52%
November - 2018
Internal roads 20 Km - structure work in progress.
No Image
1) Construction of road from Jazz Tower Imdad Mir Koroona Talatan Ghalib Khel road and link road to BHU Ghali Khel 2.30 Km
2) Construction of road from Aza Khel to Naak Band 3 Km
3) Rehabilitation of road from Nawab Chowk Khanow UC Sherkara 2.90 Km
4) Construction of Sam No.1 road taking off from Zangali Canal to GPS Garhi Ghulam Muhammad 2.80 Km
5) Construction of Garhi Mumtaz road taking off from Hazar Khwani Canal 2 Km
6) Rehabilitation/construction of Kulu Daag Lara road at Badabera 2 Km
7) Improvement/rehabilitation of Ghaz Chowk to Rural Health Center Aza Khel Village 1 Km
8) Construction of road from Banat Kalay to Major House Mair Surizai 1.20 Km
807
(OG)
170658-Const of internal roads in PK-10, Distt. Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 200 100 10 9.5 9.5 9.5 109.5 90 55% 55%
April - 2019
Internal roads 20 Km - structure work in progress.
No Image
1) Construction of road from Jazz Tower Imdad Mir Koroona Talatan Ghalib Khel road and link road to BHU Ghali Khel 2.30 Km
2) Construction of road from Aza Khel to Naak Band 3 Km
3) Rehabilitation of road from Nawab Chowk Khanow UC Sherkara 2.90 Km
4) Construction of Sam No.1 road taking off from Zangali Canal to GPS Garhi Ghulam Muhammad 2.80 Km
5) Construction of Garhi Mumtaz road taking off from Hazar Khwani Canal 2 Km
6) Rehabilitation/construction of Kulu Daag Lara road at Badabera 2 Km
7) Improvement/rehabilitation of Ghaz Chowk to Rural Health Center Aza Khel Village 1 Km
8) Construction of road from Banat Kalay to Major House Mair Surizai 1.20 Km
Pages : 1 2