Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
790 (OG) |
170575-Construction of RCC Bridge at Duryal Karo Darra in PK-93 District Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.617 | 0 | 0.001 | 0.001 | 0.0005 | 0 | 0 | 30.616 | 0% |
- September - 2018 |
Work in progress. |
No Image |
PK-93, Dir Upper | |||||||||||||||||||
790 (OG) |
170575-Construction of RCC Bridge at Duryal Karo Darra in PK-93 District Dir Upper. |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30.617 | 0 | 0.001 | 0.001 | 0.0005 | 0 | 0 | 30.616 | 0% |
- July - 2018 |
Work in progress. |
No Image |
PK-93, Dir Upper | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 53.96 | 27.192 | 27.192 | 20.447 | 503.176 | 0 | 100% |
94% December - 2018 |
18.5/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 24.461 | 24.461 | 24.461 | 18.393 | 501.122 | 25.564 | 95% |
94% November - 2018 |
18.5/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 24.461 | 24.461 | 24.461 | 18.393 | 501.122 | 25.564 | 95% |
94% November - 2018 |
18.5/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 53.922 | 41.922 | 41.922 | 21.664 | 504.393 | 0 | 100% |
95% April - 2019 |
20/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 53.922 | 41.922 | 41.922 | 21.664 | 504.393 | 0 | 100% |
95% March - 2019 |
20/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 53.922 | 41.922 | 41.922 | 21.664 | 504.393 | 0 | 100% |
95% March - 2019 |
20/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 53.96 | 41.192 | 41.192 | 21.664 | 504.393 | 0 | 100% |
95% February - 2019 |
20/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 532.754 | 482.729 | 53.96 | 27.192 | 27.192 | 21.66 | 504.389 | 0 | 100% |
95% January - 2019 |
20/20 Km BT completed, structure work in progress. |
No Image |
20 Km under jurisdiction of this division | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% December - 2018 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% November - 2018 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% November - 2018 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% April - 2019 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% March - 2019 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% March - 2019 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% February - 2019 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 440.41 | 420.179 | 5 | 5 | 5 | 0 | 420.179 | 15.231 | 97% |
95% January - 2019 |
Completed (22.35 Km). |
No Image |
1) Package-II (22.35 Km) from Lachi side | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 30 | 29.999947 | 403.889947 | 296.2 | 58% |
58% December - 2019 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 15 | 15 | 388.89 | 296.2 | 58% |
56% November - 2019 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 7.5 | 7.5 | 381.39 | 296.2 | 58% |
54% October - 2019 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 7.5 | 7.5 | 381.39 | 296.2 | 58% |
54% September - 2019 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 7.5 | 7.5 | 381.39 | 296.2 | 58% |
54% August - 2019 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 30 | 29.999947 | 403.889947 | 296.2 | 58% |
58% May - 2020 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 30 | 29.999947 | 403.889947 | 296.2 | 58% |
58% April - 2020 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 30 | 29.999947 | 403.889947 | 296.2 | 58% |
58% March - 2020 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 30 | 29.999947 | 403.889947 | 296.2 | 58% |
58% February - 2020 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 373.89 | 30 | 30 | 30 | 29.999947 | 403.889947 | 296.2 | 58% |
58% January - 2020 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 46.922 | 32.192 | 0 | 866.716 | 0 | 100% |
100% December - 2018 |
Work in progress. |
No Image |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2020 |
No Image | |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 58.922 | 44.192 | 0 | 866.716 | 0 | 100% |
100% November - 2018 |
Work in progress. |
No Image |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 58.922 | 44.192 | 0 | 866.716 | 0 | 100% |
100% November - 2018 |
Work in progress. |
No Image |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2020 |
No Image | |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2020 |
No Image | |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2020 |
No Image | |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2020 |
No Image | |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 46.922 | 46.922 | 0 | 866.716 | 0 | 100% |
100% April - 2019 |
Kohat: Completed (22.35 Km).
Hangu: 20/20 Km BT completed, structure work in progress. |
No Image |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2021 |
No Image | |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 46.922 | 46.922 | 0 | 866.716 | 0 | 100% |
100% March - 2019 |
Kohat: Completed (22.35 Km).
Hangu: 20/20 Km BT completed, structure work in progress. |
No Image |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 46.922 | 46.922 | 0 | 866.716 | 0 | 100% |
100% March - 2019 |
Kohat: Completed (22.35 Km).
Hangu: 20/20 Km BT completed, structure work in progress. |
No Image |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2021 |
No Image | |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 46.922 | 46.922 | 0 | 866.716 | 0 | 100% |
100% February - 2019 |
Kohat: Completed (22.35 Km).
Hangu: 20/20 Km BT completed, structure work in progress. |
No Image |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2021 |
No Image | |
790 (OG) |
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 655.054 | 866.716 | 58.922 | 46.922 | 32.192 | 0 | 866.716 | 0 | 100% |
100% January - 2019 |
Work in progress. |
No Image |
790 (New) |
200240-F/S for Provision of significant diagnostic facilities i.e. CT Scan, MRI etc in DHQ Hospitals of District Upper and Lower Chitral. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2021 |
No Image | |
Pages : 1 |