Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 1 | 1 | 1 | 16 | 83.998 | 16% |
16% December - 2020 |
Work in progress. |
No Image |
Abbottabad | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 1 | 1 | 1 | 16 | 83.998 | 16% |
16% December - 2020 |
Work in progress. |
No Image |
Abbottabad | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 1 | 1 | 1 | 16 | 83.998 | 16% |
16% October - 2020 |
Work in progress. |
No Image |
Abbottabad | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 1 | 0 | 0 | 15 | 83.998 | 16% |
15% September - 2020 |
Work in progress. |
No Image |
Abbottabad | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 1 | 0 | 0 | 15 | 83.998 | 16% |
15% August - 2020 |
Work in progress. |
No Image |
Abbottabad | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 0 | 0 | 0 | 15 | 83.998 | 16% |
15% July - 2020 |
Work in progress. |
No Image |
Abbottabad | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 40 | 40 | 25.937 | 40.937 | 83.998 | 16% |
41% May - 2021 |
01- Unit
G/F roof laid, F/F Roof laid, Block B Excavation/Foundaiton in progress |
No Image |
Category-D Hospital, Abbottabad. | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 26 | 26 | 25.937 | 40.937 | 83.998 | 16% |
41% April - 2021 |
Super Structure in porgress
demand Rs. 20 M |
No Image |
Category-D Hospital, Abbottabad. | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 26 | 26 | 26 | 41 | 83.998 | 16% |
41% March - 2021 |
Super Structure in porgress |
No Image |
Category-D Hospital, Abbottabad. | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 26 | 26 | 26 | 41 | 83.998 | 16% |
41% February - 2021 |
Super Structure in porgress |
No Image |
Category-D Hospital, Abbottabad. | |||||||||||||||||||
769 (OG) |
170388-Up-gradation of Civil Hospital Sherwan to Category-D Hospital, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.998 | 15 | 1 | 31 | 31 | 1 | 16 | 83.998 | 16% |
16% January - 2021 |
Work in progress. |
No Image |
Category-D Hospital, Abbottabad. | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% December - 2018 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% November - 2018 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% November - 2018 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% April - 2019 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. Liability Rs. 25 m. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% March - 2019 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. Liability Rs. 25 m. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% March - 2019 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. Liability Rs. 25 m. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% February - 2019 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. Liability : 25 M. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
140885-Reconstruction / Rehabilitation of Road from Kingar Bridge to Narmi Khel (15 Kms), Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 372.849 | 78.258 | 30 | 30 | 30 | 30 | 108.258 | 264.591 | 29% |
29% January - 2019 |
Length 15 Km (width 18ft) - earth work, sub base completed, structure work (slab culvert) in progress. |
No Image |
Bannu | |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 28.725 | 28.725 | 27.591707 | 256.955707 | 90.636 | 74% |
73% December - 2019 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 30 | 15 | 15 | 244.364 | 90.636 | 74% |
70% November - 2019 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 30 | 15 | 7.5 | 236.864 | 90.636 | 74% |
68% October - 2019 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 30 | 7.5 | 7.5 | 236.864 | 90.636 | 74% |
68% September - 2019 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 30 | 7.5 | 5 | 234.364 | 90.636 | 74% |
67% August - 2019 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress. |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 38.725 | 38.725 | 32.421 | 261.785 | 90.636 | 74% |
75% May - 2020 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress.
Demand Rs. 20 m |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 38.725 | 38.725 | 22.702 | 252.066 | 90.636 | 74% |
72% April - 2020 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress.
Demand Rs. 20 m |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 38.725 | 38.725 | 22.702 | 252.066 | 90.636 | 74% |
72% March - 2020 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress.
Demand Rs. 20 m |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 38.725 | 38.725 | 22.702 | 252.066 | 90.636 | 74% |
72% February - 2020 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress.
Demand Rs. 20 m |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 229.364 | 30 | 38.725 | 38.725 | 22.702 | 252.066 | 90.636 | 74% |
72% January - 2020 |
Length 7.125 Km - 6.8 Km asphalt completed. Revised scope (13.50 Km) in progress.
Demand Rs. 20 m |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )
3. Haji Zai to Tarkha (2.5 km ) (12 ft )
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft )
| |||||||||||||||||||
769 (OG) |
150837-Construction & Black Topping of Gudhar Takurro road UC Munda and Danjarri to Ijjara, Nawey Kallay, Bota & Qaziabad Tatar road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.796 | 77.468 | 0.001 | 0.001 | 0.0005 | 0 | 77.468 | 122.327 | 39% |
39% September - 2018 |
Length 12 Km - work in progress on all 6 units. |
No Image |
1) Gudar road
2) Takurro road
3) Denjarai to Ijara road
4) Naway Kalay road
5) Bota road
6) Qazi Abad Tatar road | |||||||||||||||||||
769 (OG) |
150837-Construction & Black Topping of Gudhar Takurro road UC Munda and Danjarri to Ijjara, Nawey Kallay, Bota & Qaziabad Tatar road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.796 | 77.468 | 0.001 | 0.001 | 0.0005 | 0 | 77.468 | 122.327 | 39% |
39% July - 2018 |
Length 12 Km - work in progress on all 6 units. |
No Image |
1) Gudar road
2) Takurro road
3) Denjarai to Ijara road
4) Naway Kalay road
5) Bota road
6) Qazi Abad Tatar road | |||||||||||||||||||
Pages : 1 |