Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
Scope received in 16/11/2017. PC-I/DCE submitted to Prisons Deptt 04/01/2018. |
No Image |
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
PC-I/DCE under preparation. |
No Image |
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
PC-I/DCE under preparation. |
No Image |
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
PC-I/DCE under preparation. |
No Image |
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
Scope received in 16/11/2017. DCE under preparation. |
No Image |
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
PC-I/DCE under preparation. |
No Image |
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
Scope received in 16/11/2017. PC-I/DCE for Rs.10.946 m submitted to IG Prisons on 12/04/2018. |
No Image |
Construction of Model Interview Room in Central Prison Bannu | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
Scope received in 16/11/2017. PC-I/DCE for Rs.10.946 m submitted to IG Prisons on 12/04/2018. |
No Image |
Construction of Model Interview Room in Central Prison Bannu | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
Scope received in 16/11/2017. PC-I/DCE for Rs.10.946 m submitted to IG Prisons on 12/04/2018. |
No Image |
Construction of Model Interview Room in Central Prison Bannu | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
Scope received in 16/11/2017. PC-I/DCE submitted to Prisons Deptt 04/01/2018. Discussed in DDWP and deferred to revise scope of work with inclusion of additional sub components of jails. |
No Image |
Bannu | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
Scope received in 16/11/2017. PC-I/DCE submitted to Prisons Deptt 04/01/2018. |
No Image |
Bannu | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
Scope received in 16/11/2017. PC-I/DCE submitted to Prisons Deptt 04/01/2018. |
No Image |
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 28.0875 | 28.0875 | 15.508228 | 93.876228 | 91.158 | 54% |
47% December - 2019 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 30 | 7.5 | 7.5 | 85.868 | 91.158 | 54% |
43% November - 2019 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 30 | 7.5 | 7.5 | 85.868 | 91.158 | 54% |
43% October - 2019 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 30 | 7.5 | 6.683 | 85.051 | 91.158 | 54% |
43% September - 2019 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 30 | 7.5 | 0 | 78.368 | 91.158 | 54% |
39% August - 2019 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 28.0875 | 28.0875 | 15.508 | 93.876 | 91.158 | 54% |
47% May - 2020 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 28.0875 | 28.0875 | 15.508 | 93.876 | 91.158 | 54% |
47% April - 2020 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 28.0875 | 28.0875 | 15.508 | 93.876 | 91.158 | 54% |
47% March - 2020 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 28.0875 | 28.0875 | 15.508 | 93.876 | 91.158 | 54% |
47% February - 2020 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.526 | 78.368 | 30 | 28.0875 | 28.0875 | 15.508 | 93.876 | 91.158 | 54% |
47% January - 2020 |
Length 26 Km (width 12 ft) - Jandi Babar to Maroo - earth work, sub base, structure work completed. Revised scope - work order issued. |
No Image |
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- December - 2018 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- November - 2018 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- November - 2018 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- April - 2019 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- March - 2019 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- March - 2019 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- February - 2019 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (OG) |
150658-Establishment of Khyber Pakhtunkhwa Emergency Rescue Services (Rescue 1122) in District Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 137.445 | 0 | 30 | 30 | 0 | 0 | 0 | 0 | - |
- January - 2019 |
Site not yet identified by client deptt. |
No Image |
Dir Lower | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
Dce Submitted |
No Image |
Haripur | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 5.125 | 5.125 | 5.125 | 3.125 | 3.125 | 0 | - |
- May - 2018 |
PC-I/DCE submitted to Supdt Central Prison Haripur. |
No Image |
Haripur | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE submitted to Supdt Central Prison Haripur. |
No Image |
Haripur | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE submitted to Supdt Central Prison Haripur. |
No Image |
Haripur | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
PC-I/DCE submitted to Supdt Central Prison Haripur. |
No Image |
Haripur | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
PC-I/DCE submitted to Supdt Central Prison Haripur. |
No Image |
Haripur | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
PC-I/DCE for Rs.17.539 m submitted to Supdt Jail Karak on 17/01/2018. |
No Image |
Karak | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
PC-I/DCE for Rs.17.539 m submitted to Supdt Jail Karak on 17/01/2018. |
No Image |
Karak | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE for Rs.17.539 m submitted to Supdt Jail Karak on 17/01/2018. |
No Image |
Karak | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE for Rs.17.539 m submitted to Supdt Jail Karak on 17/01/2018. |
No Image |
Karak | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
PC-I/DCE for Rs.17.539 m submitted to Supdt Jail Karak on 17/01/2018. |
No Image |
Karak | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
PC-I/DCE for Rs.17 m submitted to Supdt Jail Mansehra. |
No Image |
District Jail, Mansehra | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
PC-I/DCE for Rs.17 m submitted to Supdt Jail Mansehra. |
No Image |
District Jail, Mansehra | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE for Rs.17 m submitted to Supdt Jail Mansehra. |
No Image |
District Jail, Mansehra | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE for Rs.17 m submitted to Supdt Jail Mansehra. |
No Image |
District Jail, Mansehra | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
PC-I/DCE for Rs.17 m submitted to Supdt Jail Mansehra. |
No Image |
District Jail, Mansehra | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
PC-I/DCE for Rs.11.959 m submitted to Supdt Central Prison Mardan on 04/04/2018. |
No Image |
Central Prison Mardan | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
PC-I/DCE for Rs.11.959 m submitted to Supdt Central Prison Mardan on 04/04/2018. |
No Image |
Central Prison Mardan | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE for Rs.11.959 m submitted to Supdt Central Prison Mardan on 04/04/2018. |
No Image |
Central Prison Mardan | |||||||||||||||||||
738 (New) |
170040-Construction of Model Interview Rooms in selected Jails of Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE for Rs.11.959 m submitted to Supdt Central Prison Mardan on 04/04/2018. |
No Image |
Central Prison Mardan | |||||||||||||||||||
Pages : 1 2 |