Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
XEN Swabi (focal person) - Umbrella PC-I/DCE for Rs.242.449 m (MRS-2017) submitted to IG Prisons on 18/12/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016. Observation under process. PC-I/DCE for Rs.73.331 m re-submitted to Home Deptt on 11/07/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016. Observation under process. PC-I/DCE for Rs.73.331 m re-submitted to Home Deptt on 11/07/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016. Observation under process. PC-I/DCE for Rs.73.331 m re-submitted to Home Deptt on 11/07/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016. Observation under process. PC-I/DCE for Rs.73.331 m re-submitted to Home Deptt on 11/07/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016. Observation under process. PC-I/DCE for Rs.73.331 m re-submitted to Home Deptt on 11/07/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
PC-I/DCE for Rs.77.659 m submitted to IG Prisons on 31/01/2018 (XEN Swabi focal person). |
No Image |
Central Prison, Bannu | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
PC-I/DCE for Rs.77.659 m submitted to IG Prisons on 31/01/2018 (XEN Swabi focal person). |
No Image |
Central Prison, Bannu | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE for Rs.77.659 m submitted to IG Prisons on 31/01/2018 (XEN Swabi focal person). |
No Image |
Central Prison, Bannu | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE for Rs.77.659 m submitted to IG Prisons on 31/01/2018 (XEN Swabi focal person). |
No Image |
Central Prison, Bannu | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
PC-I/DCE for Rs.77.659 m submitted to IG Prisons on 31/01/2018 (XEN Swabi focal person). |
No Image |
Central Prison, Bannu | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
PC-I/DCE for Rs.77.659 m submitted to IG Prisons on 31/01/2018 (XEN Swabi focal person). |
No Image |
Central Prison Bannu | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
Umberlla PC-I/DCE submitted to P&D Deptt by XEN Swabi (focal person). Pre-PDWP held on 25/07/2016. Observation of P&D regarding MRS-2016 corrected and resubmitted to IG Prison on 15/01/2017. IG Prison submtted revised scoope of work to focal person. |
No Image |
District Jail Daggar | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
PC-I/DCE for Rs.11.145 m submitted to IG Prison on 26/09/2016. Pre-PDWP held, observations under process. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 62.244645 | 62.244645 | 40.864955 | 194.185955 | 0 | 100% |
88% December - 2019 |
Length 20 Km (width 18 ft) - earth work completed. Sub-base 10 Km completed. WBM 5 Km completed. |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 66.483 | 16.62 | 16.62 | 169.941 | 0 | 100% |
77% November - 2019 |
Length 20 Km (width 18 ft) - earth work completed. Sub-base 10 Km completed. WBM 5 Km completed. |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 66.483 | 16.62 | 16.62 | 169.941 | 0 | 100% |
77% October - 2019 |
Length 20 Km (width 18 ft) - earth work completed. Sub-base 10 Km completed. WBM 5 Km completed. |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 66.483 | 16.62 | 4.936 | 158.257 | 0 | 100% |
72% September - 2019 |
Length 20 Km (width 18 ft) - earth work completed. Sub-base 10 Km completed. WBM 5 Km completed. |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 66.483 | 16.62 | 0 | 153.321 | 0 | 100% |
70% August - 2019 |
Length 20 Km (width 18 ft) - earth work completed. Sub-base 10 Km completed. WBM 5 Km completed. |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 62.244645 | 62.244645 | 40.864955 | 194.185955 | 0 | 100% |
88% May - 2020 |
Length 20 Km (width 18 ft) - Completed |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 62.244645 | 62.244645 | 40.864955 | 194.185955 | 0 | 100% |
88% April - 2020 |
Length 20 Km (width 18 ft) - Completed |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 62.244645 | 62.244645 | 40.864955 | 194.185955 | 0 | 100% |
88% March - 2020 |
Length 20 Km (width 18 ft) - Completed |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 62.244645 | 62.244645 | 40.864955 | 194.185955 | 0 | 100% |
88% February - 2020 |
Length 20 Km (width 18 ft) - Completed |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (OG) |
150784-Construction / BT of Lunda Sharif to Jumma Sharif road UC Lunda Sharif and Charri Bhohar to Jhok Ameen road UC Mairan District D.I.Khan. |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.804 | 153.321 | 66.483 | 62.244645 | 62.244645 | 40.864955 | 194.185955 | 0 | 100% |
88% January - 2020 |
Length 20 Km (width 18 ft) - Completed |
No Image |
1) Lunda Sharif to Juma Sharif road UC Lunda Sharif 10 Km
2) Charri Bhohar to Jhoke Ameen road UC Miran 8.9 Km
3) Lunda Sharif to Juma Sharif rod 1.515 Km - additional work | |||||||||||||||||||
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Dir Lower |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
XEN Swabi (focal person) - Umbrella PC-I/DCE for Rs.242.449 m (MRS-2017) submitted to IG Prisons on 18/12/2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Dir Lower |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016.
Corrected PC-I submitted to IG Prison in July 2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Dir Lower |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016.
Corrected PC-I submitted to IG Prison in July 2017. |
No Image |
737 (New) |
150267-Improvement / Strengthening of Female and Juvenile Sections in selected Jails of Khyber Pakhtunkhwa. |
Dir Lower |
- | - | - | - | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
XEN Swabi (focal person). Pre-PDWP held on 30/09/2016. Corrected PC-I submitted to IG Prison in July 2017. |
No Image |
Pages : 1 2 3 |