Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
24-06-09 | - | - | 16-11-17 | - | 330.06 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 107.785 | - |
67% December - 2017 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
24-06-09 | - | - | 18-05-11 | - | 264.391 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 42.116 | - |
84% September - 2017 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. Revised DCE including damage portion submitted for Rs.339 m to P&D. |
No Image |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
24-06-09 | - | - | 18-05-11 | - | 264.391 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 42.116 | - |
84% August - 2017 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. Revised DCE including damage portion submitted for Rs.339 m to P&D. |
No Image |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
24-06-09 | - | - | 18-05-11 | - | 264.391 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 42.116 | - |
84% July - 2017 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. Revised DCE including damage portion submitted for Rs.339 m to Home Deptt. |
No Image |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 107.785 | - |
67% November - 2017 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 264.391 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 42.116 | - |
84% October - 2017 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. Revised DCE including damage portion submitted for Rs.339 m to P&D. observation attended. |
No Image |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 220.663 | 0 | 0 | 0 | 0 | 220.663 | 109.397 | - |
67% June - 2018 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
Hangu | |||||||||||||||||||
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 220.663 | 0 | 0 | 0 | 0 | 220.663 | 109.397 | - |
67% May - 2018 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
Hangu | |||||||||||||||||||
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 220.663 | 0 | 0 | 0 | 0 | 220.663 | 109.397 | - |
67% April - 2018 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
Hangu | |||||||||||||||||||
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 220.663 | 0 | 0 | 0 | 0 | 220.663 | 109.397 | - |
67% March - 2018 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
Hangu | |||||||||||||||||||
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 220.663 | 0 | 0 | 0 | 0 | 220.663 | 109.397 | - |
67% February - 2018 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
Hangu | |||||||||||||||||||
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (Provincial Funds Exhausted, remaining funds released by FATA). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 222.275 | 0 | 0 | 0 | 0 | 222.275 | 107.785 | - |
67% January - 2018 |
Barraks finishing stage. Admin block damaged due to bomb blast. Mosque finishing stage laid. Dev work in progress. |
No Image |
Hangu | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% December - 2019 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% December - 2019 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% November - 2019 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 69.625 | 121.951 | 40 | 40 | 0 | 0 | 121.951 | 0 | 100% |
100% October - 2019 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 69.625 | 121.951 | 40 | 40 | 0 | 0 | 121.951 | 0 | 100% |
100% September - 2019 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 69.625 | 121.951 | 40 | 40 | 0 | 0 | 121.951 | 0 | 100% |
100% August - 2019 |
Steel Fabrication GF in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% May - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% May - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% April - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% April - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% March - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% March - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% February - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% February - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% January - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
160543-Establishment of Emergency Rescue Services (Rescue 1122) in District Haripur |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.46 | 121.951 | 40 | 40 | 30 | 0 | 121.951 | 0 | 100% |
100% January - 2020 |
GF/FF - roofing in progress. |
No Image |
Haripur | |||||||||||||||||||
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- December - 2020 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- December - 2020 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- October - 2020 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- September - 2020 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- August - 2020 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
July - 2020 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- May - 2021 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- April - 2021 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- March - 2021 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- February - 2021 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- January - 2021 |
No Image | |
717 (OG) |
150974-Construction of BTR from Qutab Garh to Latif Khan Killi, village Jalala to Pir Saddu via Ghano Shah and Pre-Partition Bridge at Vill Pir Saddu Distt: Mardan. |
Mardan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 55.5 | 19.5 | 19.5 | 9.75 | 3.518 | 59.018 | 0 | 100% |
79% September - 2018 |
2/2 units in progress. |
No Image |
1) Qutab Garhi to Latif Khan Killi 2.5 Km (construction/rehabilitation/BT) width 18ft
2) Village Jalala to Pir Saddu via Ghano Shah road 4 Km (construction/rehabilitation/BT) width 18ft | |||||||||||||||||||
717 (OG) |
150974-Construction of BTR from Qutab Garh to Latif Khan Killi, village Jalala to Pir Saddu via Ghano Shah and Pre-Partition Bridge at Vill Pir Saddu Distt: Mardan. |
Mardan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 75 | 55.5 | 19.5 | 19.5 | 9.75 | 0 | 55.5 | 0 | 100% |
74% July - 2018 |
2/2 units in progress. |
ADP's Images |
1) Qutab Garhi to Latif Khan Killi 2.5 Km (construction/rehabilitation/BT) width 18ft
2) Village Jalala to Pir Saddu via Ghano Shah road 4 Km (construction/rehabilitation/BT) width 18ft | |||||||||||||||||||
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
24-06-09 | - | - | 16-11-17 | - | 330.06 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 107.784 | 67% |
67% December - 2017 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
24-06-09 | - | - | 18-05-11 | - | 264.391 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 42.115 | 84% |
84% September - 2017 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
24-06-09 | - | - | 18-05-11 | - | 264.391 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 42.115 | 84% |
84% August - 2017 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
24-06-09 | - | - | 18-05-11 | - | 264.391 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 42.115 | 84% |
84% July - 2017 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 107.784 | 67% |
67% November - 2017 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 264.391 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 42.115 | 84% |
84% October - 2017 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 107.784 | 67% |
67% June - 2018 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 107.784 | 67% |
67% May - 2018 |
No Image | |
717 (OG) |
80466-Construction of District Jail Hangu (Phase-I) 50/50 cost sharing basis with FATA (provincial funds exhausted, remaining funds released by FATA). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 330.06 | 222.275 | 0.001 | 0.001 | 0 | 0 | 222.275 | 107.784 | 67% |
67% April - 2018 |
No Image | |