Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
10-04-17 | - | - | - | Line Deptt | 285.853 | 4 | 7 | 7 | 7 | 7 | 11 | 274.853 | 4% |
4% December - 2017 |
GF finishing stage. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
- | - | - | - | Line Deptt | 285.853 | 4 | 7 | 7 | 7 | 0 | 4 | 274.853 | 4% |
1% September - 2017 |
Roofing in progress. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
- | - | - | - | Line Deptt | 285.853 | 4 | 7 | 7 | 7 | 0 | 4 | 274.853 | 4% |
1% August - 2017 |
Column upto roof level. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
- | - | - | - | Line Deptt | 285.853 | 4 | 7 | 7 | 7 | 0 | 4 | 274.853 | 4% |
1% July - 2017 |
Above DPC level. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 285.853 | 4 | 7 | 7 | 7 | 3.777 | 7.777 | 274.853 | 4% |
3% November - 2017 |
GR roof laid. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 285.853 | 4 | 7 | 7 | 7 | 3.777 | 7.777 | 274.853 | 4% |
3% October - 2017 |
GR roof laid. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 37.85 | 4 | 16.3 | 16.3 | 16.3 | 16.3 | 20.3 | 17.55 | 54% |
54% June - 2018 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 37.85 | 4 | 12.3 | 12.3 | 12.3 | 12.3 | 16.3 | 21.55 | 43% |
43% May - 2018 |
GF - flooring completed. FF finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 37.85 | 4 | 12.3 | 12.3 | 12.3 | 12.3 | 16.3 | 21.55 | 43% |
43% April - 2018 |
GF - flooring completed. FF finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 37.85 | 4 | 12.3 | 12.3 | 12.3 | 10.883 | 14.883 | 21.55 | 43% |
39% March - 2018 |
GF flooring completed. FF finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 37.85 | 4 | 7 | 7 | 7 | 7 | 11 | 26.85 | 29% |
29% February - 2018 |
2nd floor roof in progress. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 37.85 | 4 | 7 | 7 | 7 | 7 | 11 | 26.85 | 29% |
29% January - 2018 |
2nd floor roof in progress. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
09-08-16 | - | - | - | Line Deptt | 36.281 | 19 | 7 | 7 | 7 | 7 | 26 | 10.281 | 72% |
72% December - 2017 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
09-08-16 | - | - | - | Line Deptt | 36.281 | 19 | 7 | 7 | 7 | 3.691 | 22.691 | 10.281 | 72% |
63% September - 2017 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
09-08-16 | - | - | - | Line Deptt | 36.281 | 19 | 0 | 0 | 0 | 0 | 19 | 17.281 | - |
52% August - 2017 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
09-08-16 | - | - | - | Line Deptt | 36.281 | 19 | 0 | 0 | 0 | 0 | 19 | 17.281 | - |
52% July - 2017 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 7 | 7 | 7 | 4.723 | 23.723 | 10.281 | 72% |
65% November - 2017 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 7 | 7 | 7 | 4.723 | 23.723 | 10.281 | 72% |
65% October - 2017 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 9.023 | 9.023 | 9.023 | 9.023 | 28.023 | 8.258 | 77% |
77% June - 2018 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 9.2 | 9.2 | 9.2 | 9.023 | 28.023 | 8.081 | 78% |
77% May - 2018 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 9.2 | 9.2 | 9.2 | 9.023 | 28.023 | 8.081 | 78% |
77% April - 2018 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 9.2 | 9.2 | 9.2 | 9.023 | 28.023 | 8.081 | 78% |
77% March - 2018 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 7 | 7 | 7 | 7 | 26 | 10.281 | 72% |
72% February - 2018 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 36.281 | 19 | 7 | 7 | 7 | 7 | 26 | 10.281 | 72% |
72% January - 2018 |
Finishing in progress. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
17-03-17 | - | - | - | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 10 | 15 | 37.566 | 29% |
29% December - 2017 |
FF - roofing in progress. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
17-03-17 | - | - | - | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 5 | 10 | 37.566 | 29% |
19% September - 2017 |
GF - SS in progress. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
17-03-17 | - | - | - | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 5 | 10 | 37.566 | 29% |
19% August - 2017 |
GF SS in progress. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
17-03-17 | - | - | - | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 0 | 5 | 37.566 | 29% |
10% July - 2017 |
GF SS in progress. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 6.224 | 11.224 | 37.566 | 29% |
21% November - 2017 |
GF - SS completed. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 6.224 | 11.224 | 37.566 | 29% |
21% October - 2017 |
GF - SS completed. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 14 | 14 | 14 | 14 | 19 | 33.566 | 36% |
36% June - 2018 |
GF - finishing in progres.
FF - roof trusses in progress. |
No Image |
Muhafiz Khana, Chitral | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 10 | 15 | 37.566 | 29% |
29% May - 2018 |
GF - painting in progres.
FF - roofing in progress. Rs.42.822 demanded for completion. |
No Image |
Muhafiz Khana, Chitral | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 10 | 15 | 37.566 | 29% |
29% April - 2018 |
GF - painting in progres.
FF - roofing in progress. Rs.42.822 demanded for completion. |
No Image |
Muhafiz Khana, Chitral | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 10 | 15 | 37.566 | 29% |
29% March - 2018 |
GF - Plastering completed
FF - roofing in progress. Work stopped due to cold weather. |
No Image |
Muhafiz Khana, Chitral | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 10 | 15 | 37.566 | 29% |
29% February - 2018 |
FF - roofing in progress. Work stopped due to cold weather. |
ADP's Images |
Chitral | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 52.566 | 5 | 10 | 10 | 10 | 10 | 15 | 37.566 | 29% |
29% January - 2018 |
FF - roofing in progress. Work stopped due to stream cold weather. |
No Image |
Chitral | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
02-11-16 | - | - | - | Line Deptt | 38.26 | 13 | 6 | 6 | 6 | 6 | 19 | 19.26 | 50% |
50% December - 2017 |
Painting/roof tiles in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
02-11-16 | - | - | - | Line Deptt | 38.26 | 13 | 6 | 6 | 6 | 6 | 19 | 19.26 | 50% |
50% September - 2017 |
FF - plastering in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
02-11-16 | - | - | - | Line Deptt | 38.26 | 13 | 6 | 6 | 6 | 6 | 19 | 19.26 | 50% |
50% August - 2017 |
GF - flooring in progress. FF - roof laid. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
02-11-16 | - | - | - | Line Deptt | 38.26 | 13 | 0 | 0 | 0 | 0 | 13 | 25.26 | - |
34% July - 2017 |
Roof laid. FF RCC column in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 6 | 6 | 6 | 6 | 19 | 19.26 | 50% |
50% November - 2017 |
FF - flooring in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 6 | 6 | 6 | 6 | 19 | 19.26 | 50% |
50% October - 2017 |
FF - flooring in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 21.104 | 21.104 | 21.104 | 16.615 | 29.615 | 4.156 | 89% |
77% June - 2018 |
Finishing in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 16 | 16 | 16 | 16 | 29 | 9.26 | 76% |
76% May - 2018 |
Finishing in progress. Rs.6 m required for completion. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 16 | 16 | 16 | 16 | 29 | 9.26 | 76% |
76% April - 2018 |
Work in progress. Rs.6 m required for completion. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 16 | 16 | 16 | 11.467 | 24.467 | 9.26 | 76% |
64% March - 2018 |
Work in progress. Rs.6 m required for completion. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 16 | 16 | 16 | 11.467 | 24.467 | 9.26 | 76% |
64% February - 2018 |
Work in progress. Funds required for completion. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 38.26 | 13 | 6 | 6 | 6 | 6 | 19 | 19.26 | 50% |
50% January - 2018 |
Joinery in progress. |
No Image |
District Hangu | |||||||||||||||||||
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Karak |
15-11-16 | - | - | - | Line Deptt | 34.989 | 11.828 | 7 | 7 | 7 | 2.686 | 14.514 | 16.161 | 54% |
41% December - 2017 |
Main building - roof slab laid. Pressure Pump, ground reservoir tank completed. Demand Rs.16.161 m. |
No Image |
66 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Karak |
15-11-16 | - | - | - | Line Deptt | 34.989 | 11.828 | 7 | 7 | 7 | 0 | 11.828 | 16.161 | 54% |
34% September - 2017 |
Main building - roof slab laid. Pressure Pump, ground reservoir tank completed. |
No Image |
Pages : 1 2 3 |