Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2020, January - 2021, January - 2018, January - 2019, February - 2019, February - 2020, February - 2021, February - 2018, March - 2019, March - 2020, March - 2021, March - 2018, April - 2019, April - 2020, April - 2021, April - 2018, May - 2020, May - 2021, May - 2018, June - 2018, July - 2020, July - 2017, July - 2018, August - 2019, August - 2020, August - 2017, September - 2019, September - 2020, September - 2017, September - 2018, October - 2019, October - 2020, October - 2017, November - 2019, November - 2017, November - 2018, December - 2018, December - 2019, December - 2020, December - 2017,

Showing Page Number : 1 of 5

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
- - - 09-01-14 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
December - 2017
Work order issued. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
- - - 09-01-14 - 10.395 4.64 15.35 15.35 15.35 0 4.64 0 100% 45%
September - 2017
Work order issued. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
- - - 09-01-14 - 10.395 4.64 15.35 15.35 15.35 0 4.64 0 100% 45%
August - 2017
Work order issued. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
- - - 09-01-14 - 10.395 4.64 0 0 0 0 4.64 5.755 - 45%
July - 2017
Work order issued. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
November - 2017
Work order issued. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 10.395 4.64 15.35 15.35 15.35 0 4.64 0 100% 45%
October - 2017
Work order issued. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 11.462 11.462 11.462 11.462 16.102 111.106 13% 13%
June - 2018
Work started. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
May - 2018
Work started. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
April - 2018
Work started. Site not yet H/O.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
March - 2018
Work started.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
February - 2018
Work started.
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 127.208 4.64 15.35 15.35 15.35 0 4.64 107.218 16% 4%
January - 2018
Work started .
No Image
1) GDC Lora Abbottabad
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
01-03-13 - - 09-01-14 - 156.203 107.353 13 13 13 4.27 111.623 35.85 77% 71%
December - 2017
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
01-03-13 - - 09-01-14 - 156.203 107.353 13 13 13 0 107.353 35.85 77% 69%
September - 2017
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GDC Kakki
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
01-03-13 - - 09-01-14 - 156.203 107.353 13 13 13 0 107.353 35.85 77% 69%
August - 2017
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GDC Kakki
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
01-03-13 - - 09-01-14 - 156.203 107.353 0 0 0 0 107.353 48.85 - 69%
July - 2017
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GDC Kakki
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 4.27 111.623 35.85 77% 71%
November - 2017
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GDC Kakki
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 0 107.353 35.85 77% 69%
October - 2017
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GDC Kakki
625
(OG)
151077-Construction / Rehabilitation of Road, UC Nar Jaffar, UC Kakki-I, UC Baharat, UC Kausar Fateh Khel, UC Mandan, District Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 150.1 2.154 0.001 0.001 0.0005 0 2.154 147.945 1% 1%
September - 2018
Delay due to stay order by court (vacated) Work in Progress on 21 units.
No Image
Bannu
625
(OG)
151077-Construction / Rehabilitation of Road, UC Nar Jaffar, UC Kakki-I, UC Baharat, UC Kausar Fateh Khel, UC Mandan, District Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 - 150.1 2.154 0.001 0.001 0.0005 0 2.154 147.945 1% 1%
July - 2018
Delay due to stay order by court (vacated) Work in Progress on 21 units.
No Image
Bannu
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 28 28 28 13 120.353 20.85 87% 77%
June - 2018
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki, Bannu
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 13 120.353 35.85 77% 77%
May - 2018
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki, Bannu
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 13 120.353 35.85 77% 77%
April - 2018
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki, Bannu
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 8.73 116.083 35.85 77% 74%
March - 2018
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki, Bannu
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 4.27 111.623 35.85 77% 71%
February - 2018
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki, Bannu
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Bannu
30-11--1 30-11--1 - 30-11--1 - 156.203 107.353 13 13 13 4.27 111.623 35.85 77% 71%
January - 2018
GGDC Kakki - main building, student hostel, cafetaria finishing in progress.
No Image
1) GGDC Kakki
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
- - - 09-01-14 - 262.629 27 25 25 25 15 42 210.629 20% 16%
December - 2017
17 Kanals land available, additional land 8 Kanals acquired Earth work completed. RCC retaining wall in progress. Developmental work started.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
- - - 09-01-14 - 262.629 27 15 15 15 0 27 220.629 16% 10%
September - 2017
Work order issued. Land not handed over.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
- - - 09-01-14 - 262.629 27 15 15 15 0 27 220.629 16% 10%
August - 2017
Work order issued. Land not handed over.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
- - - 09-01-14 - 262.629 27 0 0 0 0 27 235.629 - 10%
July - 2017
Work order issued. Land not handed over.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 15 15 15 15 42 220.629 16% 16%
November - 2017
17 Kanals land available, additional land 8 Kanals acquired Earth work completed. RCC retaining wall in progress. Developmental work started.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 15 15 15 0 27 220.629 16% 10%
October - 2017
Stay order vacated. Work started.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 55 55 55 55 82 180.629 31% 31%
June - 2018
17 Kanals land available, additional land 8 Kanals acquired. Main building - SS in progress. Earth work 90%, RW 70% work completed.
No Image
GDC Allai, Battagram
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 55 55 55 50.003 77.003 180.629 31% 29%
May - 2018
17 Kanals land available, additional land 8 Kanals acquired. Main building - SS in progress. Earth work 90%, RW 70% work completed.
No Image
GDC Allai, Battagram
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 25 25 25 25 52 210.629 20% 20%
April - 2018
17 Kanals land available, additional land 8 Kanals acquired. Main building - SS in progress. Earth work 90%, RW 70% work completed.
No Image
GDC Allai, Battagram
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 25 25 25 25 52 210.629 20% 20%
March - 2018
17 Kanals land available, additional land 8 Kanals acquired Earth work completed. RCC retaining wall in progress. Developmental work started.
No Image
GDC Allai, Battagram
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 25 25 25 25 52 210.629 20% 20%
February - 2018
17 Kanals land available, additional land 8 Kanals acquired Earth work completed. RCC retaining wall in progress. Developmental work started.
No Image
GDC Allai, Battagram
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Battagram
30-11--1 30-11--1 - 30-11--1 - 262.629 27 25 25 25 25 52 210.629 20% 20%
January - 2018
17 Kanals land available, additional land 8 Kanals acquired Earth work completed. RCC retaining wall in progress. Developmental work started.
No Image
GDC Allai
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11-16 - - 30-12-15 - 262.224 28.193 30 30 30 0 28.193 204.031 22% 11%
December - 2017
Main building - excavation in progres. Auditorium - BB work in foundation in progress.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11-16 - - 30-12-15 - 262.224 28.193 30 30 30 0 28.193 204.031 22% 11%
September - 2017
Site preparation work in progress. Layout given for main building.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11-16 - - 30-12-15 - 262.224 28.193 30 30 30 0 28.193 204.031 22% 11%
August - 2017
Site preparation work in progress. Layout given for main building.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11-16 - - 30-12-15 - 262.224 28.193 0 0 0 0 28.193 234.031 - 11%
July - 2017
Site preparation work in progress. Layout given for main building.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 0 28.193 204.031 22% 11%
November - 2017
Main building - excavation in progres. Auditorium - BB work in foundation in progress.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 0 28.193 204.031 22% 11%
October - 2017
Main Building Excavation in progres. Audotorium - BB work in foundation in progress.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 5 5 5 5 33.193 229.031 13% 13%
June - 2018
Main building - excavation in progres. Auditorium - brick works upto lintel level.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 5 33.193 204.031 22% 13%
May - 2018
Main building - excavation in progres. Auditorium - brick works upto lintel level.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 5 33.193 204.031 22% 13%
April - 2018
Main building - excavation in progres. Auditorium - brick works upto lintel level.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 5 33.193 204.031 22% 13%
March - 2018
Main building - excavation in progres. Auditorium - brick works upto lintel level.
No Image
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 5 33.193 204.031 22% 13%
February - 2018
Main building - excavation in progres. Auditorium - Brick works upto lintel level.
ADP's Images
1) GDC Chagharzai PK-78
625
(OG)
120268-Establishment of 20 Govt Colleges (Male & Female) in Khyber Pakhtunkhwa (Phase-V).
Buner
30-11--1 30-11--1 - 30-11--1 - 262.224 28.193 30 30 30 0 28.193 204.031 22% 11%
January - 2018
Main building - excavation in progres. Auditorium - BB work in foundation in progress.
No Image
1) GDC Chagharzai PK-78