Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
No Image | |
554 (New) |
190241-Reconstruction of Government Technical Vocational Center (GTVC) at Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- January - 2020 |
No Image | |
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 0.997 | 27.079 | 45.575 | 42% |
34% December - 2018 |
Work in progress (Barracks). Watch tower completed. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 0 | 26.082 | 45.575 | 42% |
33% November - 2018 |
Work in progress (Barracks). Watch tower completed. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 0 | 26.082 | 45.575 | 42% |
33% November - 2018 |
Work in progress (Barracks). Watch tower completed. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 9 | 9 | 9 | 9 | 35.082 | 43.575 | 45% |
45% April - 2019 |
Work in progress (Barracks). Watch tower completed. Demand Rs.10 m. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 7 | 33.082 | 45.575 | 42% |
42% March - 2019 |
Work in progress (Barracks). Watch tower completed. Demand Rs.10 m. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 7 | 33.082 | 45.575 | 42% |
42% March - 2019 |
Work in progress (Barracks). Watch tower completed. Demand Rs.10 m. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 7 | 33.082 | 45.575 | 42% |
42% February - 2019 |
Work in progress (Barracks). Watch tower completed. Demand Rs. 10 M |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 0.099 | 26.181 | 45.575 | 42% |
33% January - 2019 |
Work in progress (Barracks). Watch tower completed. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.246 | 3.138 | 0 | 100% |
98% December - 2018 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.246 | 3.138 | 0 | 100% |
98% November - 2018 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.246 | 3.138 | 0 | 100% |
98% November - 2018 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.301 | 3.193 | 0 | 100% |
100% April - 2019 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.301 | 3.193 | 0 | 100% |
100% March - 2019 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.301 | 3.193 | 0 | 100% |
100% March - 2019 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.301 | 3.193 | 0 | 100% |
100% February - 2019 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.301 | 3.193 | 0 | 100% |
100% January - 2019 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% December - 2018 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% November - 2018 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% November - 2018 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% April - 2019 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% March - 2019 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% March - 2019 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% February - 2019 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% January - 2019 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% December - 2018 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% November - 2018 |
Completed (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% November - 2018 |
Completed (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% April - 2019 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% March - 2019 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% March - 2019 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% February - 2019 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% January - 2019 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% December - 2018 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% November - 2018 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% November - 2018 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% April - 2019 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% March - 2019 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% March - 2019 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% February - 2019 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
554 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% January - 2019 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
Pages : 1 2 3 |