Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
04-04-16 | 30-06-18 | - | 14-01-16 | - | 7.155 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 1.779 | - |
75% December - 2017 |
Out of 4 units, 2 completed, 2 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
- | 30-06-18 | - | 14-01-16 | - | 5.5 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 0.124 | - |
98% September - 2017 |
Out of 3 units, 2 completed, 1 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
- | 30-06-18 | - | 14-01-16 | - | 5.5 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 0.124 | - |
98% August - 2017 |
Out of 3 units, 2 completed, 1 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
- | 30-06-18 | - | 14-01-16 | - | 5.5 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 0.124 | - |
98% July - 2017 |
Out of 3 units, 2 completed, 1 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.5 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 0.124 | - |
98% November - 2017 |
Out of 3 units, 2 completed, 1 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.5 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 0.124 | - |
98% October - 2017 |
Out of 3 units, 2 completed, 1 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.155 | 5.376 | 1.655 | 1.655 | 1.655 | 1.218 | 6.594 | 0.124 | 98% |
92% June - 2018 |
Completed (4 units). |
No Image |
1) Haqania Surrani Bannu (construction of 2 class rooms)
2) Darul-Uloom-e-Rehmania main Bazar Bannu (construction of rooms, madrassa)
3) Masjid Faiz Talib Abbas Mandan (construction Over Head Water Tank, ablution place and boring) 4) Nar Dilasa Shah (Masjid KP) (construction of bath room/water tank/bore/drain/ablution house with shed) | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.155 | 5.376 | 1.655 | 1.655 | 1.655 | 0.45 | 5.826 | 0.124 | 98% |
81% May - 2018 |
Out of 4 units, 2 completed, 2 finishing stage. |
No Image |
1) Haqania Surrani Bannu (construction of 2 class rooms)
2) Darul-Uloom-e-Rehmania main Bazar Bannu (construction of rooms, madrassa)
3) Masjid Faiz Talib Abbas Mandan (construction Over Head Water Tank, ablution place and boring) 4) Nar Dilasa Shah (Masjid KP) (construction of bath room/water tank/bore/drain/ablution house with shed) | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.155 | 5.376 | 1.655 | 1.655 | 1.655 | 0.45 | 5.826 | 0.124 | 98% |
81% April - 2018 |
Out of 4 units, 2 completed, 2 finishing stage. |
No Image |
1) Haqania Surrani Bannu (construction of 2 class rooms)
2) Darul-Uloom-e-Rehmania main Bazar Bannu (construction of rooms, madrassa)
3) Masjid Faiz Talib Abbas Mandan (construction Over Head Water Tank, ablution place and boring) 4) Nar Dilasa Shah (Masjid KP) (construction of bath room/water tank/bore/drain/ablution house with shed) | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.155 | 5.376 | 1.655 | 1.655 | 1.655 | 0.45 | 5.826 | 0.124 | 98% |
81% March - 2018 |
Out of 4 units, 2 completed, 2 finishing stage. |
No Image |
1) Haqania Surrani Bannu (construction of 2 class rooms)
2) Darul-Uloom-e-Rehmania main Bazar Bannu (construction of rooms, madrassa)
3) Masjid Faiz Talib Abbas Mandan (construction Over Head Water Tank, ablution place and boring) 4) Nar Dilasa Shah (Masjid KP) (construction of bath room/water tank/bore/drain/ablution house with shed) | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.155 | 5.376 | 1.655 | 1.655 | 1.655 | 0 | 5.376 | 0.124 | 98% |
75% February - 2018 |
Out of 4 units, 2 completed, 2 finishing stage. |
No Image |
1) Haqania Surrani Bannu (construction of 2 class rooms)
2) Darul-Uloom-e-Rehmania main Bazar Bannu (construction of rooms, madrassa)
3) Masjid Faiz Talib Abbas Mandan (construction Over Head Water Tank, ablution place and boring) 4) Nar Dilasa Shah (Masjid KP) (construction of bath room/water tank/bore/drain/ablution house with shed) | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.155 | 5.376 | 0 | 0 | 0 | 0 | 5.376 | 1.779 | - |
75% January - 2018 |
Out of 4 units, 2 completed, 2 finishing stage. |
No Image |
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | 30-06-18 | - | 14-01-16 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% December - 2017 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | 30-06-18 | - | 14-01-16 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% September - 2017 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | 30-06-18 | - | 14-01-16 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% August - 2017 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | 30-06-18 | - | 14-01-16 | - | 0.5 | 0 | 0 | 0 | 0 | 0 | 0 | 0.5 | - |
- July - 2017 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% November - 2017 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% October - 2017 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% June - 2018 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% May - 2018 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% April - 2018 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% March - 2018 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% February - 2018 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.5 | 0.5 | 0 | 0 | 0 | 0 | 0.5 | 0 | - |
100% January - 2018 |
Completed. |
No Image |
Construction/rehabilitation of Jamia Islamia Umar Farooq Gulshan Islam Dedal Tikkri Battagram | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
16-04-16 | 30-06-18 | - | 14-01-16 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% December - 2017 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr
3) Historical Masjid Pir Baba
4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
16-04-16 | 30-06-18 | - | 14-01-16 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% September - 2017 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr
3) Historical Masjid Pir Baba
4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
16-04-16 | 30-06-18 | - | 14-01-16 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% August - 2017 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr
3) Historical Masjid Pir Baba
4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
16-04-16 | 30-06-18 | - | 14-01-16 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% July - 2017 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr
3) Historical Masjid Pir Baba
4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% November - 2017 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr
3) Historical Masjid Pir Baba
4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% October - 2017 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr
3) Historical Masjid Pir Baba
4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% June - 2018 |
Out of 4 units, 3 completed, 1 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai PK-79 (construction)
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr PK-79 (construction of class rooms)
3) Historical Masjid Pir Baba PK-79 (rehabilitation/construction of bath room/wash room)
4) Student Hostel at Dar ul Uloom Haji Abad Dherai PK-78 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% May - 2018 |
Out of 4 units, 3 completed, 1 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai PK-79 (construction)
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr PK-79 (construction of class rooms)
3) Historical Masjid Pir Baba PK-79 (rehabilitation/construction of bath room/wash room)
4) Student Hostel at Dar ul Uloom Haji Abad Dherai PK-78 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% April - 2018 |
Out of 4 units, 3 completed, 1 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai PK-79 (construction)
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr PK-79 (construction of class rooms)
3) Historical Masjid Pir Baba PK-79 (rehabilitation/construction of bath room/wash room)
4) Student Hostel at Dar ul Uloom Haji Abad Dherai PK-78 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% March - 2018 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai PK-79 (construction)
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr PK-79 (construction of class rooms)
3) Historical Masjid Pir Baba PK-79 (rehabilitation/construction of bath room/wash room)
4) Student Hostel at Dar ul Uloom Haji Abad Dherai PK-78 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% February - 2018 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai PK-79 (construction)
2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr PK-79 (construction of class rooms)
3) Historical Masjid Pir Baba PK-79 (rehabilitation/construction of bath room/wash room)
4) Student Hostel at Dar ul Uloom Haji Abad Dherai PK-78 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.32 | 10.354 | 0 | 0 | 0 | 0 | 10.354 | 3.966 | - |
72% January - 2018 |
Out of 4 units, 1 completed, 3 in progress. |
No Image |
1) Madrasa Tarteel ul Quran village Jower Salarzai 2) Madrasa Tafhim ul Quran Koga Tehsil Mandanr 3) Historical Masjid Pir Baba 4) Student Hostel at Dar ul Uloom Haji Abad Dherai | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
20-04-15 | 30-06-18 | - | 14-01-16 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% December - 2017 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
20-04-15 | 30-06-18 | - | 14-01-16 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% September - 2017 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
20-04-15 | 30-06-18 | - | 14-01-16 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% August - 2017 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
20-04-15 | 30-06-18 | - | 14-01-16 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% July - 2017 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% November - 2017 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% October - 2017 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% June - 2018 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai, Tehsil Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% May - 2018 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai, Tehsil Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% April - 2018 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai, Tehsil Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% March - 2018 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai, Tehsil Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% February - 2018 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai, Tehsil Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.444 | 5.491 | 0 | 0 | 0 | 0 | 5.491 | 0 | - |
100% January - 2018 |
Completed & H/O. |
No Image |
Darul Uloom-e-Ahnaf Islamia Mirzai, Tehsil Shabqadda PK-22 | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
01-06-16 | 30-06-18 | - | 14-01-16 | - | 5 | 2.5 | 0 | 0 | 0 | 0 | 2.5 | 2.5 | - |
50% December - 2017 |
Work in progress in all units (5 units). |
No Image |
1) Jamia Talim Ul Islam Khal Bar Kali
2) Daral Uloom Talim Ul Quran Khall Kaloni
3) Jamia Serath ul Janat Lel Banat Khall Mandi and Daral Uloom Tatheer Ul Abkar Zoor Mandai Khall
4) Darul Uloom Luqman Banda and Darul Uloom Dowab
5) Darul Uloom Sherpalam and Sapary and Loo Luqman Banda | |||||||||||||||||||
52 (OG) |
150754-Improvement and Rehabilitation of Deeni Madaris and Mosques in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
01-06-16 | 30-06-18 | - | 14-01-16 | - | 5 | 2.5 | 0 | 0 | 0 | 0 | 2.5 | 2.5 | - |
50% September - 2017 |
Work in progress. |
No Image |
Pages : 1 2 3 4 |