Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0 | 0 | 0 | 0 | 15.633 | 0 | - |
100% December - 2020 |
10- Units
Completed & H/O =10
rs. 3.550 M demanded |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0 | 0 | 0 | 0 | 15.633 | 0 | - |
100% December - 2020 |
10- Units
Completed & H/O =10
rs. 3.550 M demanded |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0 | 0 | 0 | 0 | 15.633 | 0 | - |
100% October - 2020 |
10- Units
Completed & H/O =9
Work in progress. =1 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0 | 0 | 0 | 0 | 15.633 | 0 | - |
100% September - 2020 |
10- Units
Completed & H/O =9
Work in progress. =1 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0.683 | 0.683 | 0.683 | 0.683 | 16.316 | 0 | 100% |
100% May - 2021 |
10- Units
Completed & H/O =10
Demanded Rs. 1.660 M |
No Image |
1 GGPS Sadiq Abad
2 GGPS Zagari
3 GGPS Mamenzo
4 GGPS Tawheed Abad Arang
5 GGPS Mena 2
6 GGPS Dag Qalla Alijan
7 GGPS Bala Chingai
8 GGPS Tangai CHamang
9 GGPS Bandagai
10 GGPS Sweai | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0.683 | 0.683 | 0.683 | 0.683 | 16.316 | 0 | 100% |
100% April - 2021 |
10- Units
Completed & H/O =10
Demanded Rs. 1.660 M |
No Image |
1 GGPS Sadiq Abad
2 GGPS Zagari
3 GGPS Mamenzo
4 GGPS Tawheed Abad Arang
5 GGPS Mena 2
6 GGPS Dag Qalla Alijan
7 GGPS Bala Chingai
8 GGPS Tangai CHamang
9 GGPS Bandagai
10 GGPS Sweai | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0.683 | 0.683 | 0.683 | 0.683 | 16.316 | 0 | 100% |
100% March - 2021 |
10- Units
Completed & H/O =10
Demanded Rs. 1.660 M |
No Image |
1 GGPS Sadiq Abad
2 GGPS Zagari
3 GGPS Mamenzo
4 GGPS Tawheed Abad Arang
5 GGPS Mena 2
6 GGPS Dag Qalla Alijan
7 GGPS Bala Chingai
8 GGPS Tangai CHamang
9 GGPS Bandagai
10 GGPS Sweai | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0.683 | 0.683 | 0.683 | 0.683 | 16.316 | 0 | 100% |
100% February - 2021 |
10- Units
Completed & H/O =10
Demanded Rs. 1.660 M |
No Image |
1 GGPS Sadiq Abad
2 GGPS Zagari
3 GGPS Mamenzo
4 GGPS Tawheed Abad Arang
5 GGPS Mena 2
6 GGPS Dag Qalla Alijan
7 GGPS Bala Chingai
8 GGPS Tangai CHamang
9 GGPS Bandagai
10 GGPS Sweai | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0 | 0 | 0 | 0 | 15.633 | 0 | - |
100% January - 2021 |
10- Units
Completed & H/O =10
rs. 3.550 M demanded |
No Image |
1 GGPS Sadiq Abad
2 GGPS Zagari
3 GGPS Mamenzo
4 GGPS Tawheed Abad Arang
5 GGPS Mena 2
6 GGPS Dag Qalla Alijan
7 GGPS Bala Chingai
8 GGPS Tangai CHamang
9 GGPS Bandagai
10 GGPS Sweai | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 91.857 | 106.643 | 106.643 | 0 | 0 | 91.857 | 0 | 100% |
100% October - 2020 |
05- Components.
Completed & H/O=1
Completed =4 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 91.857 | 106.643 | 106.643 | 0 | 0 | 91.857 | 0 | 100% |
100% September - 2020 |
05- Components.
Completed & H/O=1
Completed =4 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 91.857 | 106.643 | 106.643 | 0 | 0 | 91.857 | 0 | 100% |
100% August - 2020 |
05- Components.
02 compnents completed and 03 Nos in progress. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.5 | 91.857 | 106.643 | 0 | 0 | 0 | 91.857 | 0 |
July - 2020 |
No Image | ||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 7 | 2.342 | 2.342 | 2.342 | 0.74 | 7.74 | 0 | 100% |
100% May - 2021 |
F. R Bannu
05 Units Completed & H/O |
No Image |
F.R Bannu
1. GGPS Umar Jan Waligai .?. Rs: 1.4 M (TS 1.358)
2. GGPS Sarwar Jan Shoi Khel .?. Rs: 1.4 M (TS 1.358)
3. GGPS Amir Muhammad .?. Rs: 1.4 M (TS 1.358)
4. GGPS Sher Zada .?. Rs: 1.4 M
5. GGPS Mir Taj Ali Khan .?. Rs: 1.4 M (TS 1.358)
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 7 | 2.342 | 2.342 | 2.342 | 0.74 | 7.74 | 0 | 100% |
100% April - 2021 |
F. R Bannu
05 Units Completed & H/O |
No Image |
F.R Bannu
1. GGPS Umar Jan Waligai .?. Rs: 1.4 M (TS 1.358)
2. GGPS Sarwar Jan Shoi Khel .?. Rs: 1.4 M (TS 1.358)
3. GGPS Amir Muhammad .?. Rs: 1.4 M (TS 1.358)
4. GGPS Sher Zada .?. Rs: 1.4 M
5. GGPS Mir Taj Ali Khan .?. Rs: 1.4 M (TS 1.358)
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 7 | 2.342 | 2.342 | 2.342 | 0.74 | 7.74 | 0 | 100% |
100% March - 2021 |
F. R Bannu
05 Units Completed & H/O |
No Image |
F.R Bannu
1. GGPS Umar Jan Waligai .?. Rs: 1.4 M (TS 1.358)
2. GGPS Sarwar Jan Shoi Khel .?. Rs: 1.4 M (TS 1.358)
3. GGPS Amir Muhammad .?. Rs: 1.4 M (TS 1.358)
4. GGPS Sher Zada .?. Rs: 1.4 M
5. GGPS Mir Taj Ali Khan .?. Rs: 1.4 M (TS 1.358)
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 7 | 2.342 | 2.342 | 2.342 | 0.74 | 7.74 | 0 | 100% |
100% February - 2021 |
F. R Bannu
05 Units Completed & H/O |
No Image |
F.R Bannu
1. GGPS Umar Jan Waligai .?. Rs: 1.4 M (TS 1.358)
2. GGPS Sarwar Jan Shoi Khel .?. Rs: 1.4 M (TS 1.358)
3. GGPS Amir Muhammad .?. Rs: 1.4 M (TS 1.358)
4. GGPS Sher Zada .?. Rs: 1.4 M
5. GGPS Mir Taj Ali Khan .?. Rs: 1.4 M (TS 1.358)
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 11.658 | 2.342 | 2.342 | 2.342 | 0.74 | 12.398 | 0 | 100% |
89% January - 2021 |
F. R Bannu
05 Units Completed & H/O |
No Image |
F.R Bannu
1. GGPS Umar Jan Waligai .?. Rs: 1.4 M
2. GGPS Sarwar Jan Shoi Khel .?. Rs: 1.4 M
3. GGPS Amir Muhammad .?. Rs: 1.4 M
4. GGPS Sher Zada .?. Rs: 1.4 M
5. GGPS Mir Taj Ali Khan .?. Rs: 1.4 M
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 1.12 | 1.12 | 1.12 | 1.12 | 92.977 | 0 | 100% |
100% December - 2020 |
05- Units
In finishing stage=04
completed =01 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 1.12 | 1.12 | 1.12 | 1.12 | 92.977 | 0 | 100% |
100% December - 2020 |
05- Units
In finishing stage=04
completed =01 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 1.12 | 1.12 | 1.12 | 1.12 | 92.977 | 0 | 100% |
100% October - 2020 |
05- Units
In finishing stage=04
completed =01 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 1.12 | 1.12 | 1.12 | 1.12 | 92.977 | 0 | 100% |
100% September - 2020 |
05- Units
In finishing stage=04
completed =01 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 0 | 0 | 0 | 0 | 91.857 | 0 | - |
100% August - 2020 |
05- Units
In finishing stage=04
completed =01 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 106.643 | 0 | 0 | 0 | 91.857 | 0 | 100% |
100% July - 2020 |
No Image | |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 4.745 | 1.232 | 1.232 | 1.232 | 1.232 | 5.977 | 1.368 | 81% |
81% May - 2021 |
05- Units - all in finishing stage |
No Image |
1 GGPS Sheikh Mela
2 GGPS Darazinda
3 GGPS Landi Astandar
4 GGPS Tore Baz Kor
5 GGPS Cheena Aslam Khan | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 4.745 | 1.232 | 1.232 | 1.232 | 1.232 | 5.977 | 1.368 | 81% |
81% April - 2021 |
05- Units - all in finishing stage |
No Image |
1 GGPS Sheikh Mela
2 GGPS Darazinda
3 GGPS Landi Astandar
4 GGPS Tore Baz Kor
5 GGPS Cheena Aslam Khan | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 4.745 | 1.232 | 1.232 | 1.232 | 1.232 | 5.977 | 1.368 | 81% |
81% March - 2021 |
05- Units - all in finishing stage |
No Image |
1 GGPS Sheikh Mela
2 GGPS Darazinda
3 GGPS Landi Astandar
4 GGPS Tore Baz Kor
5 GGPS Cheena Aslam Khan | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 4.745 | 1.232 | 1.232 | 1.232 | 1.232 | 5.977 | 1.368 | 81% |
81% February - 2021 |
05- Units - all in finishing stage |
No Image |
1 GGPS Sheikh Mela
2 GGPS Darazinda
3 GGPS Landi Astandar
4 GGPS Tore Baz Kor
5 GGPS Cheena Aslam Khan | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 91.857 | 1.12 | 1.12 | 1.12 | 1.12 | 92.977 | 0 | 100% |
100% January - 2021 |
05- Units
In finishing stage=04
completed =01 |
No Image |
1 GGPS Sheikh Mela
2 GGPS Darazinda
3 GGPS Landi Astandar
4 GGPS Tore Baz Kor
5 GGPS Cheena Aslam Khan | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 190.551 | 0 | 0 | 0 | 0 | 0 | 0 | 190.551 | - |
- October - 2020 |
05- Compenents
DCE/PC-I sent to District Education officer Darra Adam Khel at Kohat. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 190.551 | 0 | 0 | 0 | 0 | 0 | 0 | 190.551 | - |
- September - 2020 |
i- DPC in progress.
Ii- 80% C/Wall completed. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 190.551 | 0 | 0 | 0 | 0 | 0 | 0 | 190.551 | - |
- August - 2020 |
Scope of work awaited. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 91.857 | 106.643 | 0 | 0 | 0 | 91.857 | 0 |
July - 2020 |
No Image | ||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 11.658 | 106.643 | 106.643 | 0 | 0 | 11.658 | 0 | 100% |
100% October - 2020 |
05- Components
Completed & H/O =2
Finishing in progress=3 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 11.658 | 106.643 | 106.643 | 0 | 0 | 11.658 | 0 | 100% |
100% September - 2020 |
05- Components
Completed & H/O =2
Finishing in progress=3 |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 11.658 | 106.643 | 106.643 | 0 | 0 | 11.658 | 0 | 100% |
100% August - 2020 |
05- Components.
02- Nos M/B completed & H/O
03- Nos finishing in progress. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.5 | 91.857 | 106.643 | 0 | 0 | 0 | 91.857 | 0 |
July - 2020 |
No Image | ||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 4.658 | 2.342 | 2.342 | 2.342 | 0.74 | 5.398 | 0 | 100% |
77% April - 2021 |
F.R Lakki 05 units
02 Units- H/O
03 Units-Finishing
1. Completed & H/O
2. Completed & H/O
3. Finishing in progress
4. Finishing in progress
5. Finishing in progress |
No Image |
F.R Lakki
1. GGPS Gul Muhammad .?. Rs: 1.4 M (TS 1.358)
2. GGPS Zahir Shah .?. Rs: 1.4 M (TS 1.358)
3. GGPS Muhammad Nawaz .?. Rs: 1.4 M (TS 1.358)
4. GGPS Warey Gul .?. Rs: 1.4 M (TS 1.358)
5. GGPS Sattar Behtani Guli Kaskai .?. Rs: 1.4 M (TS 1.358) | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 4.658 | 2.342 | 2.342 | 2.342 | 0.74 | 5.398 | 0 | 100% |
77% March - 2021 |
F.R Lakki 05 units
02 Units- H/O
03 Units-Finishing
1. Completed & H/O
2. Completed & H/O
3. Finishing in progress
4. Finishing in progress
5. Finishing in progress |
No Image |
F.R Lakki
1. GGPS Gul Muhammad .?. Rs: 1.4 M (TS 1.358)
2. GGPS Zahir Shah .?. Rs: 1.4 M (TS 1.358)
3. GGPS Muhammad Nawaz .?. Rs: 1.4 M (TS 1.358)
4. GGPS Warey Gul .?. Rs: 1.4 M (TS 1.358)
5. GGPS Sattar Behtani Guli Kaskai .?. Rs: 1.4 M (TS 1.358) | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 4.658 | 2.342 | 2.342 | 2.342 | 0.74 | 5.398 | 0 | 100% |
77% February - 2021 |
F.R Lakki 05 units
02 Units- H/O
03 Units-Finishing
1. Completed & H/O
2. Completed & H/O
3. Finishing in progress
4. Finishing in progress
5. Finishing in progress |
No Image |
F.R Lakki
1. GGPS Gul Muhammad .?. Rs: 1.4 M (TS 1.358)
2. GGPS Zahir Shah .?. Rs: 1.4 M (TS 1.358)
3. GGPS Muhammad Nawaz .?. Rs: 1.4 M (TS 1.358)
4. GGPS Warey Gul .?. Rs: 1.4 M (TS 1.358)
5. GGPS Sattar Behtani Guli Kaskai .?. Rs: 1.4 M (TS 1.358) | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Lakki |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 4.658 | 2.342 | 2.342 | 2.342 | 0.74 | 5.398 | 0 | 100% |
77% January - 2021 |
F.R Lakki 05 units
1. Completed & H/O
2. Completed & H/O
3. Finishing in progress
4. Finishing in progress
5. Finishing in progress |
No Image |
F.R Lakki
1. GGPS Gul Muhammad .?. Rs: 1.4 M
2. GGPS Zahir Shah .?. Rs: 1.4 M
3. GGPS Muhammad Nawaz .?. Rs: 1.4 M
4. GGPS Warey Gul .?. Rs: 1.4 M
5. GGPS Sattar Behtani Guli Kaskai .?. Rs: 1.4 M | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 11.105 | 2.586 | 2.586 | 2.586 | 0 | 11.105 | 0.309 | 98% |
79% October - 2020 |
10- Units
1-Plaster completed.
2- Roof laid.
3-Finishing completed.
4- do
5- Roofing in progress.
6- BB in S/S in progress.
7- upto lintle level.
8- Upto roof level
9- do
10-B.B work in progress. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 11.105 | 2.586 | 2.586 | 2.586 | 0 | 11.105 | 0.309 | 98% |
79% September - 2020 |
10- Units
1-Plaster completed.
2- Roof laid.
3-Finishing completed.
4- do
5- Roofing in progress.
6- BB in S/S in progress.
7- upto lintle level.
8- Upto roof level
9- do
10-B.B work in progress. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 11.105 | 2.586 | 2.586 | 2.586 | 0 | 11.105 | 0.309 | 98% |
79% August - 2020 |
10- Units
1-Plaster completed.
2- Roof laid.
3-Finishing completed.
4- do
5- Roofing in progress.
6- BB in S/S in progress.
7- upto lintle level.
8- Upto roof level
9- do
10-B.B work in progress. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 11.105 | 0 | 0 | 0 | 0 | 11.105 | 2.895 | - |
79% July - 2020 |
10- Units
1- Site not yet cleared.
2- S/S in progress.
3- Finishing in progress.
4- do
5- Roofing in progress.
6- Work started.
7- Finising in progress.
8- do-
9- do
10-Work started. |
No Image |
493 (OG) |
160445-Reconstruction and Renovation of Judicial Complex Kohat (PC-II approved). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 338.43 | 30.9 | 0.001 | 0.001 | 0 | 0 | 30.9 | 307.529 | 9% |
9% September - 2018 |
MAK consultant for Phase-I. Work started. Land payment made. |
No Image |
KDA, Kohat | |||||||||||||||||||
493 (OG) |
160445-Reconstruction and Renovation of Judicial Complex Kohat (PC-II approved). |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 338.43 | 30.9 | 0.001 | 0.001 | 0 | 0 | 30.9 | 307.529 | 9% |
9% July - 2018 |
MAK consultant for Phase-I. Work order issued. Land payment made. |
No Image |
KDA, Kohat | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 13.096 | 11.105 | 1.99 | 1.99 | 1.99 | 0.89 | 11.995 | 0.001 | 100% |
92% December - 2020 |
10- Units
9/10 Units completed
1- Site not yet cleared. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 13.096 | 11.105 | 1.99 | 1.99 | 1.99 | 0.89 | 11.995 | 0.001 | 100% |
92% December - 2020 |
10- Units
9/10 Units completed
1- Site not yet cleared. |
No Image |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 13.096 | 11.105 | 0.59 | 0.59 | 0.59 | 0 | 11.105 | 1.401 | 89% |
85% October - 2020 |
10- Units
1- Site not yet cleared.
2- S/S in progress.
3- Finishing in progress.
4- do
5- Roofing in progress.
6- Work started.
7- Finising in progress.
8- do-
9- do
10-Super Structur in progress..
Demand Rs. 50 M |
No Image |
Pages : 1 2 |