Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
- | 30-06-18 | - | - | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
- | 30-06-18 | - | - | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
- | 30-06-18 | - | - | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
- | 30-06-18 | - | - | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
No Image | |
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 7 | 7 | 7 | 0 | 26.082 | 45.575 | 42% |
33% September - 2018 |
Work in progress (Barracks). Auction completed. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 26.082 | 0 | 0 | 0 | 0 | 26.082 | 52.575 | - |
33% July - 2018 |
Work in progress (Barracks). Auction completed. |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
No Image | |
453 (New) |
170161-Acquisition of Land for Food Grain Godowns in District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 70 | 0 | 70 | 70 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
No Image | |
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 1.301 | 1.301 | 1.301 | 1.246 | 3.138 | 0 | 100% |
98% September - 2018 |
Raising of BW (300 rft) completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 1.892 | 0 | 0 | 0 | 0 | 1.892 | 1.301 | - |
59% July - 2018 |
Raising of BW (300 rft) completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | - |
- December - 2018 |
Work order issued. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 3 | 0 | 4 | 4 | 4 | 0 | 0 | 0 | 100% |
- November - 2018 |
Tender floated on 18/10/2018, approval under process. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 3 | 0 | 4 | 4 | 4 | 0 | 0 | 0 | 100% |
- November - 2018 |
Tender floated on 18/10/2018, approval under process. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% September - 2018 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% July - 2018 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prisoners
2) Watch and Ward Staff Barrak (50) bed
3) ATC Court
4) District Jail Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 2 | 2 | 2 | 0 | 0 | 1 | 67% |
- April - 2019 |
Work order issued. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 2 | 2 | 2 | 0 | 0 | 1 | 67% |
- March - 2019 |
Work order issued. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 2 | 2 | 2 | 0 | 0 | 1 | 67% |
- March - 2019 |
Work order issued. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 2 | 2 | 2 | 0 | 0 | 1 | 67% |
- February - 2019 |
Work order issued. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | - |
- January - 2019 |
Work order issued. |
No Image |
Public Library Timergara | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% September - 2018 |
Completed (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% July - 2018 |
Completed (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage System) | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% September - 2018 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% July - 2018 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 105.337 | 17.996 | 18.241 | 18.241 | 18.241 | 0.532 | 18.528 | 69.1 | 34% |
18% September - 2018 |
5 Barrack for security staff - upto roof level. Interview/visitor block - SS in progress. |
No Image |
District Jail Kohat (5 Nos Barracks 95 x 20)
Juvenile Barracks
25 isolation cells
Checker office
Dev Works | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 105.337 | 17.996 | 0 | 0 | 0 | 0 | 17.996 | 87.341 | - |
17% July - 2018 |
5 Barrack for security staff - upto roof level. Interview/visitor block - SS in progress. |
No Image |
District Jail Kohat (5 Nos Barracks 95 x 20)
Juvenile Barracks
25 isolation cells
Checker office
Dev Works | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 26.734 | 0 | 0 | 0 | 0 | 0 | 0 | 26.734 | - |
- September - 2018 |
Work order issued on 05/06/2017. Demolition estimate submitted to Supdt Jail. Site not available. Site shifting involved. New site not yet H/O. |
No Image |
Improvement of District Jail Lakki Marwat PK-76 | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 26.734 | 0 | 0 | 0 | 0 | 0 | 0 | 26.734 | - |
- July - 2018 |
Work order issued on 05/06/2017. Demolition estimate submitted to Supdt Jail. Site not available. Site shifting involved. New site not yet H/O. |
No Image |
Improvement of District Jail Lakki Marwat PK-76 | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Malakand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 9.999 | 9.35 | 0 | 0 | 0 | 0 | 9.35 | 0.649 | - |
94% September - 2018 |
Interview rooms, kitchen completed, waiting sheds, finishing in progress. Balance work - finishing stage. |
No Image |
Sub Jail Malakand (construction of 02 waiting sheds/Judicial Lockup Malakand) | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Malakand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 9.999 | 9.35 | 0 | 0 | 0 | 0 | 9.35 | 0.649 | - |
94% July - 2018 |
Interview rooms, kitchen completed, waiting sheds, finishing in progress. Balance work - finishing stage. |
No Image |
Sub Jail Malakand (construction of 02 waiting sheds/Judicial Lockup Malakand) | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 26.123 | 17.485 | 7 | 7 | 7 | 0 | 17.485 | 1.638 | 94% |
67% September - 2018 |
Warder Barrack (1 No) - completed. Juvinile Cell (10 Nos) - completed. Segregatioon wall - additional work in progress. |
No Image |
District Jail Manshra PK-53 (barracks/juvenille cells/intersection wall) | |||||||||||||||||||
453 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 26.123 | 17.485 | 0 | 0 | 0 | 0 | 17.485 | 8.638 | - |
67% July - 2018 |
Warder Barrack (1 No) - completed. Juvinile Cell (10 Nos) - completed. Segregatioon wall - additional work in progress. |
No Image |
District Jail Manshra PK-53 (barracks/juvenille cells/intersection wall) | |||||||||||||||||||
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (New) |
190392-Construction of BS Blocks in Government Colleges Khyber Pakhtunkhwa. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2020 |
DCE for Rs.32.090 M sent to Statistical Officer, Higher Education Archives and libraries Deptt on 07/11/19. |
No Image |
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.8 | 0 | 0 | 0 | 0 | 0 | 0 | 2.8 | - |
- December - 2018 |
Work started. |
No Image |
Khushal Khan Khattak Memorial Library Akora Khattak | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.8 | 0 | 2.812 | 2.812 | 2.812 | 1.212 | 1.212 | 0 | 100% |
43% April - 2019 |
Work in progress. |
No Image |
Khushal Khan Khattak Memorial Library Akora Khattak | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.8 | 0 | 2 | 2 | 2 | 1.54 | 1.54 | 0.8 | 71% |
55% March - 2019 |
Work in progress. |
No Image |
Khushal Khan Khattak Memorial Library Akora Khattak | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.8 | 0 | 2 | 2 | 2 | 1.54 | 1.54 | 0.8 | 71% |
55% March - 2019 |
Work in progress. |
No Image |
Khushal Khan Khattak Memorial Library Akora Khattak | |||||||||||||||||||
453 (OG) |
170004-Repair & maintenance, addition/alteration in existing buildings of public libraries in Khyber Pakhtunkhwa. |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 2.8 | 0 | 2 | 2 | 2 | 0.74 | 0.74 | 0.8 | 71% |
26% February - 2019 |
Work in progress. |
No Image |
Khushal Khan Khattak Memorial Library Akora Khattak | |||||||||||||||||||
Pages : 1 2 |