Progressive Review for the month(s) of : January - 2019, January - 2021, February - 2019, February - 2021, March - 2019, March - 2021, April - 2019, April - 2021, May - 2021, July - 2020, August - 2020, September - 2020, October - 2020, November - 2018, December - 2018, December - 2020,

Showing Page Number : 1 of 3

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 0 4.931 4.931 4.931 4.931 4.931 90.04 5% 5%
October - 2020
Out of 3 units, all in progress.
No Image
1) GGHS Kuthwal PK-48
2) GGHS Bandi Phullan (Pk-46)
3) GGHS Mirpur (Pk-39)
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 0 4.931 4.931 4.931 4.931 4.931 90.04 5% 5%
September - 2020
Out of 3 units, all in progress.
No Image
1) GGHS Kuthwal PK-48
2) GGHS Bandi Phullan (Pk-46)
3) GGHS Mirpur (Pk-39)
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 0 0 0 0 0 0 94.971 - -
August - 2020
Out of 3 units, all in progress.
No Image
1) GGHS Kuthwal PK-48
2) GGHS B
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 0 0 0 0 0 0 94.971 - -
July - 2020
Out of 3 units, all in progress.
No Image
1) GGHS Kuthwal PK-48
2) GGHS B
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 59.061 25.614 25.614 25.614 11.016 70.077 10.296 89% 74%
May - 2021
03- Units 1. Dev: work in progress, M/B G/F roof laid 2. Completed & H/O 3. Finishing in progress & B/Wall completed
No Image
1) GGHS Kuthwal PK-48  .?.?.. TS 29.531
2) GGHS Bandi Phullan (Pk-46) .?.?.. TS 29.005
3) GGHS Mirpur (Pk-39)  .?.?.. TS 26.702
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 59.061 16.782 16.782 16.782 6.782 65.843 19.128 80% 69%
April - 2021
03 units, 1. Dev: work in progress, M/B G/F roof laid 2. Completed & H/O 3. Finishing in progress & B/Wall completed
No Image
1) GGHS Kuthwal PK-48  .?.?.. TS 29.531
2) GGHS Bandi Phullan (Pk-46) .?.?.. TS 29.005
3) GGHS Mirpur (Pk-39)  .?.?.. TS 26.702
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 59.061 6.782 6.782 6.782 6.782 65.843 29.128 69% 69%
March - 2021
03 units, 1. Dev: work in progress, M/B G/F roof laid 2. Completed & H/O 3. Finishing in progress & B/Wall completed
No Image
1) GGHS Kuthwal PK-48  .?.?.. TS 29.531
2) GGHS Bandi Phullan (Pk-46) .?.?.. TS 29.005
3) GGHS Mirpur (Pk-39)  .?.?.. TS 26.702
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 59.061 6.782 6.782 6.782 6.782 65.843 29.128 69% 69%
February - 2021
03 units, 1. Dev: work in progress, M/B G/F roof laid 2. Completed & H/O 3. Finishing in progress & B/Wall completed
No Image
1) GGHS Kuthwal PK-48  .?.?.. TS 29.531
2) GGHS Bandi Phullan (Pk-46) .?.?.. TS 29.005
3) GGHS Mirpur (Pk-39)  .?.?.. TS 26.702
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 94.971 59.061 6.782 6.782 6.782 6.498 65.559 29.128 69% 69%
January - 2021
03 units, 1. Dev: work in progress, M/B G/F roof laid 2. Completed & H/O 3. Finishing in progress & B/Wall completed
No Image
1) GGHS Kuthwal PK-48
2) GGHS Bandi Phullan (Pk-46)
3) GGHS Mirpur (Pk-39)
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
December - 2020
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
December - 2020
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
October - 2020
Work Order Issued. Site not H/O
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
September - 2020
Work Order Issued. Site not H/O
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
August - 2020
Work Order Issued. Site not H/O
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 0 0 0 0 0 43.751 - -
July - 2020
Work Order Issued. Site not H/O
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 0 0 0 0 0 43.751 - -
May - 2021
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 0 0 0 0 0 43.751 - -
April - 2021
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
March - 2021
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
February - 2021
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 43.751 0 7.951 7.951 7.951 0 0 35.8 18% -
January - 2021
Work Order Issued. Site require land purchase
No Image
GGHS Bazar Ahmad Khan PK-70
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 8.487 8.487 8.487 8.487 8.487 17.335 33% 33%
December - 2020
Work order issued. Site not handed over.
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 8.487 8.487 8.487 8.487 8.487 17.335 33% 33%
December - 2020
Work order issued. Site not handed over.
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 8.487 8.487 8.487 6.285 6.285 17.335 33% 24%
October - 2020
Work order issued. Site not handed over.
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 8.487 8.487 8.487 6.285 6.285 17.335 33% 24%
September - 2020
Work order issued. Site not handed over.
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 0 0 0 0 0 25.822 - -
August - 2020
Work order issued. Site not handed over.
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 0 0 0 0 0 25.822 - -
July - 2020
Work order issued. Site not handed over.
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 31.822 0 32.678 32.678 32.678 22.644 22.644 0 100% 71%
May - 2021
01-Unit G/F roof in progress B/Wall in progress
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 31.822 0 32.678 32.678 32.678 22.644 22.644 0 100% 71%
April - 2021
G/F roof in progress
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 31.822 0 18.476 18.476 18.476 18.476 18.476 13.346 58% 58%
March - 2021
G/F roof in progress
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 31.822 0 18.476 18.476 18.476 18.476 18.476 13.346 58% 58%
February - 2021
G/F roof in progress
No Image
1) GGHS Matwanai PK-78
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
Buner
30-11--1 30-11--1 - 30-11--1 - 25.822 0 18.476 18.476 18.476 15.515 15.515 7.346 72% 60%
January - 2021
G/F roof in progress
No Image
1) GGHS Matwanai PK-78
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2502.052 2270.946 100 100 50 5.573 2276.519 131.106 95% 91%
December - 2018
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed.
No Image
DI.Khan
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
December - 2020
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
December - 2020
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2551.632 2270.946 100 100 50 0 2270.946 180.686 93% 89%
November - 2018
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed. Revised DCE submitted. Observations attended. Lies with Finance Deptt for revenue component. Physicallay 90% work completed.
No Image
DI.Khan
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2551.632 2270.946 100 100 50 0 2270.946 180.686 93% 89%
November - 2018
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed. Revised DCE submitted. Observations attended. Lies with Finance Deptt for revenue component. Physicallay 90% work completed.
No Image
DI.Khan
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
October - 2020
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
September - 2020
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
July - 2020
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2)
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2502.052 2270.946 100 100 100 8.994 2279.94 131.106 95% 91%
April - 2019
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed.
No Image
DI.Khan
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
April - 2021
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2502.052 2270.946 100 100 50 8.932 2279.878 131.106 95% 91%
March - 2019
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed.
No Image
DI.Khan
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2502.052 2270.946 100 100 50 8.932 2279.878 131.106 95% 91%
March - 2019
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed.
No Image
DI.Khan
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
March - 2021
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2502.052 2270.946 100 100 50 8.896 2279.842 131.106 95% 91%
February - 2019
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed.
No Image
DI.Khan
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
February - 2021
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
60046-Construction of Building for Gomal Medical College, DI.Khan Phase-II.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 2502.052 2270.946 100 100 50 5.573 2276.519 131.106 95% 91%
January - 2019
Pack-1 & 2 - completed. Pack-3 & 4 - in progress. Rectification work completed.
No Image
DI.Khan
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
January - 2021
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2) GGHS Kacha Mali khel Kirri Khaisore (Pk-68)
 
415
(OG)
150557-Up-gradation of 50 Govt Girls High Schools to Higher Secondary level (less 25 units).
DI.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
August - 2020
PC-I/DCE for Rs.17.526 m submitted to DEO F on 29/
No Image
1) GGHS Village Malana PK-66
2)
Pages : 1 2 3