Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2019, January - 2020, January - 2021, February - 2019, February - 2020, February - 2021, March - 2019, March - 2020, March - 2021, April - 2019, April - 2020, April - 2021, May - 2020, May - 2021, July - 2020, August - 2019, August - 2020, September - 2019, September - 2020, October - 2019, October - 2020, November - 2018, November - 2019, December - 2018, December - 2019, December - 2020,

Showing Page Number : 1 of 2

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
December - 2018
Scope /site awaited.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
November - 2018
Scope /site awaited.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
November - 2018
Scope /site awaited.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
April - 2019
PC-I/DCE submitted to Health Deptt.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
March - 2019
PC-I/DCE submitted to Health Deptt.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
March - 2019
PC-I/DCE submitted to Health Deptt.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
February - 2019
Scope/site awaited.
No Image
408
(New)
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu.
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 90 0 20 20 0 0 0 0 - -
January - 2019
Scope/site awaited.
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 121.717 1.847 1.847 1.847 0 121.717 60.823 67% 66%
December - 2020
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 121.717 1.847 1.847 1.847 0 121.717 60.823 67% 66%
December - 2020
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 0 0.236 0.236 0.236 0 0 184.151 0% -
October - 2020
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 0 0.236 0.236 0.236 0 0 184.151 0% -
September - 2020
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 0 0 0 0 0 0 184.387 - -
August - 2020
Main building - roof laid. BW 90% completed.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 0 0 0 0 0 0 184.387 - -
July - 2020
Main building - roof laid. BW 90% completed.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 118.739 38.096 38.096 38.096 3.352 122.091 27.552 85% 66%
May - 2021
01- Unit Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 121.717 38.096 38.096 38.096 3.352 125.069 24.574 87% 68%
April - 2021
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 121.717 38.096 38.096 38.096 1.588 123.305 24.574 87% 67%
March - 2021
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 121.717 38.096 38.096 38.096 1.588 123.305 24.574 87% 67%
February - 2021
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Battagram
30-11--1 30-11--1 - 30-11--1 - 184.387 121.717 1.847 1.847 1.847 0 121.717 60.823 67% 66%
January - 2021
Main building - roof laid. BW 90% completed.,,,, An amount of Rs.0.266 m to Pesco Batagram for HT line shifting.
No Image
Construction of Model School at Moza Chapperg
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
December - 2019
PC-II submitted to health. Pre PDWP held
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 30 30 30 0 36.127 131.471 33% 18%
December - 2020
Land paymnet made. But court Stay land issue.
No Image
Bacha Khan Model School Charsadda
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 30 30 30 0 36.127 131.471 33% 18%
December - 2020
Land paymnet made. But court Stay land issue.
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
November - 2019
PC-II submitted to health. Pre PDWP held
No Image
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
October - 2019
PC-II submitted to health. Pre PDWP held
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 0 0 0 0 0 0 197.598 - -
October - 2020
Land paymnet made. But court Stay land issue.
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
September - 2019
PC-II submitted to health
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 0 0 0 0 0 0 197.598 - -
September - 2020
Land paymnet made. But court Stay land issue.
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
August - 2019
PC-II submitted to health
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 0 0 0 0 0 0 197.598 - -
August - 2020
Land paymnet made. But court Stay land issue.
No Image
Bacha Khan Model School Charsadda
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 0 0 0 0 0 0 197.598 - -
July - 2020
Land paymnet made. Denitified initial site . Wor
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
May - 2020
PC-II submitted to health. Pre PDWP held.
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 60 60 60 28.957 65.084 101.471 49% 33%
May - 2021
01- Unit Excavation in progress, B/Wall 70% completed, Layout given Cannot be completed due to revision involoved Rs: 22.000 M surrender
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
April - 2020
PC-II submitted to health. Pre PDWP held.
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 60 60 60 29.007 65.134 101.471 49% 33%
April - 2021
Excavation in progress, B/Wall 70% completed, Layout given Cannot be completed due to revision involoved Rs: 22.000 M surrender
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
March - 2020
PC-II submitted to health. Pre PDWP held.
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 30 30 30 10.994 47.121 131.471 33% 24%
March - 2021
Excavation in progress, B/Wall 70% completed, Layout given Cannot be completed due to revision involoved
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
February - 2020
PC-II submitted to health. Pre PDWP held.
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 30 30 30 10.994 47.121 131.471 33% 24%
February - 2021
Excavation in progress, B/Wall 70% completed, Layout given Cannot be completed due to revision involoved
No Image
Bacha Khan Model School Charsadda
408
(New)
190067-Establishment of Charsadda Medical College, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 1300 0 0.001 0.001 0 0 0 0 - -
January - 2020
PC-II submitted to health. Pre PDWP held.
No Image
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 197.598 36.127 30 30 30 15 51.127 131.471 33% 26%
January - 2021
court Stay vacate Work started on B/wall and excavation on M/B start
No Image
Bacha Khan Model School Charsadda
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 38.99 30.125 15.823 15.823 15.823 4.305 34.43 0 100% 88%
May - 2021
01- Unit Finishing in progress
No Image
GHS Bumborate
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 38.99 30.125 6.094 6.094 6.094 4.305 34.43 2.771 93% 88%
April - 2021
Finishing in progress
No Image
GHS Bumborate
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 38.99 30.125 6.094 6.094 6.094 1.453 31.578 2.771 93% 81%
March - 2021
Finishing in progress
No Image
GHS Bumborate
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 38.99 30.125 6.094 6.094 6.094 1.453 31.578 2.771 93% 81%
February - 2021
Finishing in progress
No Image
GHS Bumborate
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 38.99 30.125 6.094 6.094 6.094 1.453 31.578 2.771 93% 81%
January - 2021
Finishing in progress
No Image
GHS Bumborate
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Hangu
30-11--1 30-11--1 - 30-11--1 - 125.915 46.749 2.244 2.244 2.244 2.244 48.993 76.922 39% 39%
December - 2020
PC-II approved. LOA issued to SHAZ consultants Work in progress. Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20
No Image
Establishment of Model School Hangu
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Hangu
30-11--1 30-11--1 - 30-11--1 - 125.915 46.749 2.244 2.244 2.244 2.244 48.993 76.922 39% 39%
December - 2020
PC-II approved. LOA issued to SHAZ consultants Work in progress. Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20
No Image
Establishment of Model School Hangu
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Hangu
30-11--1 30-11--1 - 30-11--1 - 125.915 0 2.244 2.244 2.244 2.244 2.244 123.671 2% 2%
October - 2020
PC-II approved. LOA issued to SHAZ consultants Work in progress. Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20
No Image
Establishment of Model School Hangu
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Hangu
30-11--1 30-11--1 - 30-11--1 - 125.915 0 2.244 2.244 2.244 0 0 123.671 2% -
September - 2020
PC-II approved. LOA issued to SHAZ consultants Work in progress. Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20
No Image
Establishment of Model School Hangu
408
(OG)
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram).
Hangu
30-11--1 30-11--1 - 30-11--1 - 125.915 0 0 0 0 0 0 125.915 - -
August - 2020
PC-II approved. LOA issued to SHAZ consultants Work in progress. Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20
No Image
Establishment of Model School Hangu