Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- December - 2018 |
Scope /site awaited. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- November - 2018 |
Scope /site awaited. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- November - 2018 |
Scope /site awaited. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- April - 2019 |
PC-I/DCE submitted to Health Deptt. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- March - 2019 |
PC-I/DCE submitted to Health Deptt. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- March - 2019 |
PC-I/DCE submitted to Health Deptt. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- February - 2019 |
Scope/site awaited. |
No Image |
408 (New) |
180618-Improvement and rehabilitation of Women & Children Hospital, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 90 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- January - 2019 |
Scope/site awaited. |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 121.717 | 1.847 | 1.847 | 1.847 | 0 | 121.717 | 60.823 | 67% |
66% December - 2020 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 121.717 | 1.847 | 1.847 | 1.847 | 0 | 121.717 | 60.823 | 67% |
66% December - 2020 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 0 | 0.236 | 0.236 | 0.236 | 0 | 0 | 184.151 | 0% |
- October - 2020 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 0 | 0.236 | 0.236 | 0.236 | 0 | 0 | 184.151 | 0% |
- September - 2020 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 0 | 0 | 0 | 0 | 0 | 0 | 184.387 | - |
- August - 2020 |
Main building - roof laid. BW 90% completed. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 0 | 0 | 0 | 0 | 0 | 0 | 184.387 | - |
- July - 2020 |
Main building - roof laid. BW 90% completed. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 118.739 | 38.096 | 38.096 | 38.096 | 3.352 | 122.091 | 27.552 | 85% |
66% May - 2021 |
01- Unit
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 121.717 | 38.096 | 38.096 | 38.096 | 3.352 | 125.069 | 24.574 | 87% |
68% April - 2021 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 121.717 | 38.096 | 38.096 | 38.096 | 1.588 | 123.305 | 24.574 | 87% |
67% March - 2021 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 121.717 | 38.096 | 38.096 | 38.096 | 1.588 | 123.305 | 24.574 | 87% |
67% February - 2021 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.387 | 121.717 | 1.847 | 1.847 | 1.847 | 0 | 121.717 | 60.823 | 67% |
66% January - 2021 |
Main building - roof laid. BW 90% completed.,,,,
An amount of Rs.0.266 m to Pesco Batagram for HT line shifting. |
No Image |
Construction of Model School at Moza Chapperg | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
PC-II submitted to health. Pre PDWP held |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 30 | 30 | 30 | 0 | 36.127 | 131.471 | 33% |
18% December - 2020 |
Land paymnet made.
But court Stay land issue. |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 30 | 30 | 30 | 0 | 36.127 | 131.471 | 33% |
18% December - 2020 |
Land paymnet made.
But court Stay land issue. |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
PC-II submitted to health. Pre PDWP held |
No Image |
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
PC-II submitted to health. Pre PDWP held |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 0 | 0 | 0 | 0 | 0 | 0 | 197.598 | - |
- October - 2020 |
Land paymnet made.
But court Stay land issue. |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
PC-II submitted to health |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 0 | 0 | 0 | 0 | 0 | 0 | 197.598 | - |
- September - 2020 |
Land paymnet made.
But court Stay land issue. |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
PC-II submitted to health |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 0 | 0 | 0 | 0 | 0 | 0 | 197.598 | - |
- August - 2020 |
Land paymnet made.
But court Stay land issue. |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 0 | 0 | 0 | 0 | 0 | 0 | 197.598 | - |
- July - 2020 |
Land paymnet made. Denitified initial site .
Wor |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
PC-II submitted to health. Pre PDWP held. |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 60 | 60 | 60 | 28.957 | 65.084 | 101.471 | 49% |
33% May - 2021 |
01- Unit
Excavation in progress, B/Wall 70% completed, Layout given
Cannot be completed due to revision involoved
Rs: 22.000 M surrender |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
PC-II submitted to health. Pre PDWP held. |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 60 | 60 | 60 | 29.007 | 65.134 | 101.471 | 49% |
33% April - 2021 |
Excavation in progress, B/Wall 70% completed, Layout given
Cannot be completed due to revision involoved
Rs: 22.000 M surrender |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
PC-II submitted to health. Pre PDWP held. |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 30 | 30 | 30 | 10.994 | 47.121 | 131.471 | 33% |
24% March - 2021 |
Excavation in progress, B/Wall 70% completed, Layout given
Cannot be completed due to revision involoved |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
PC-II submitted to health. Pre PDWP held. |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 30 | 30 | 30 | 10.994 | 47.121 | 131.471 | 33% |
24% February - 2021 |
Excavation in progress, B/Wall 70% completed, Layout given
Cannot be completed due to revision involoved |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (New) |
190067-Establishment of Charsadda Medical College, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1300 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- January - 2020 |
PC-II submitted to health. Pre PDWP held. |
No Image |
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 197.598 | 36.127 | 30 | 30 | 30 | 15 | 51.127 | 131.471 | 33% |
26% January - 2021 |
court Stay vacate
Work started on B/wall and excavation on M/B start |
No Image |
Bacha Khan Model School Charsadda | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.99 | 30.125 | 15.823 | 15.823 | 15.823 | 4.305 | 34.43 | 0 | 100% |
88% May - 2021 |
01- Unit
Finishing in progress |
No Image |
GHS Bumborate | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.99 | 30.125 | 6.094 | 6.094 | 6.094 | 4.305 | 34.43 | 2.771 | 93% |
88% April - 2021 |
Finishing in progress |
No Image |
GHS Bumborate | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.99 | 30.125 | 6.094 | 6.094 | 6.094 | 1.453 | 31.578 | 2.771 | 93% |
81% March - 2021 |
Finishing in progress |
No Image |
GHS Bumborate | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.99 | 30.125 | 6.094 | 6.094 | 6.094 | 1.453 | 31.578 | 2.771 | 93% |
81% February - 2021 |
Finishing in progress |
No Image |
GHS Bumborate | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.99 | 30.125 | 6.094 | 6.094 | 6.094 | 1.453 | 31.578 | 2.771 | 93% |
81% January - 2021 |
Finishing in progress |
No Image |
GHS Bumborate | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 125.915 | 46.749 | 2.244 | 2.244 | 2.244 | 2.244 | 48.993 | 76.922 | 39% |
39% December - 2020 |
PC-II approved. LOA issued to SHAZ consultants
Work in progress.
Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20 |
No Image |
Establishment of Model School Hangu | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 125.915 | 46.749 | 2.244 | 2.244 | 2.244 | 2.244 | 48.993 | 76.922 | 39% |
39% December - 2020 |
PC-II approved. LOA issued to SHAZ consultants
Work in progress.
Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20 |
No Image |
Establishment of Model School Hangu | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 125.915 | 0 | 2.244 | 2.244 | 2.244 | 2.244 | 2.244 | 123.671 | 2% |
2% October - 2020 |
PC-II approved. LOA issued to SHAZ consultants
Work in progress.
Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20 |
No Image |
Establishment of Model School Hangu | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 125.915 | 0 | 2.244 | 2.244 | 2.244 | 0 | 0 | 123.671 | 2% |
- September - 2020 |
PC-II approved. LOA issued to SHAZ consultants
Work in progress.
Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20 |
No Image |
Establishment of Model School Hangu | |||||||||||||||||||
408 (OG) |
120470-Establishment of 5 Model Schools in Khyber Pakhtunkhwa (Karak, Haripur, Charsadda, Hangu and Battagram). |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 125.915 | 0 | 0 | 0 | 0 | 0 | 0 | 125.915 | - |
- August - 2020 |
PC-II approved. LOA issued to SHAZ consultants
Work in progress.
Revised DCE sent to Distt Education officer (Male) Hangu for AA 279.470 on 23/06/20 |
No Image |
Establishment of Model School Hangu | |||||||||||||||||||
Pages : 1 2 |