Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% December - 2018 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- December - 2019 |
Tender's approval under process. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% November - 2018 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% November - 2018 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- November - 2019 |
Tender will be opened on 13/11/2019. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- October - 2019 |
Tender will be opened on 13/11/2019. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- May - 2020 |
Tender's approval under process. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% April - 2019 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- April - 2020 |
Tender's approval under process. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% March - 2019 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% March - 2019 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- March - 2020 |
Tender's approval under process. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% February - 2019 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- February - 2020 |
Tender's approval under process. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 16.03 | 16.03 | 0 | 0 | 0 | 0 | 16.03 | 0 | - |
100% January - 2019 |
Work order issued (1 unit). |
No Image |
1) GGHS Birot PK-45
2) GGHS Bakot | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 0 | 0 | 0 | 0 | 0 | 0 | 40 | - |
- January - 2020 |
Tender's approval under process. |
No Image |
GGHS Beeran Gali PK-48 | |||||||||||||||||||
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 45.748 | 5 | 5 | 0 | 0 | 45.748 | 0 | 100% |
100% December - 2020 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 45.748 | 5 | 5 | 0 | 0 | 45.748 | 0 | 100% |
100% December - 2020 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 45.748 | 5 | 5 | 0 | 0 | 45.748 | 0 | 100% |
100% October - 2020 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 45.748 | 5 | 5 | 0 | 0 | 45.748 | 0 | 100% |
100% September - 2020 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50.748 | 45.748 | 5 | 5 | 0 | 0 | 45.748 | 0 | - |
- August - 2020 |
No Image | |
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50.748 | 45.748 | 5 | 0 | 0 | 0 | 45.748 | 0 |
July - 2020 |
No Image | ||
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 31.7 | 5 | 5 | 5 | 5 | 36.7 | 0 | 100% |
100% May - 2021 |
02- Units
1- Completed
2- Completed |
No Image |
1 Conference Room & DC House
2 Reh: of Existing Builidng
| |||||||||||||||||||
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 31.7 | 5 | 5 | 5 | 5 | 36.7 | 0 | 100% |
100% April - 2021 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
1 Conference Room & DC House
2 Reh: of Existing Builidng
| |||||||||||||||||||
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 31.7 | 5 | 5 | 5 | 5 | 36.7 | 0 | 100% |
100% March - 2021 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
1 Conference Room & DC House
2 Reh: of Existing Builidng
| |||||||||||||||||||
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 31.7 | 5 | 5 | 5 | 0 | 31.7 | 0 | 100% |
96% February - 2021 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
1 Conference Room & DC House
2 Reh: of Existing Builidng
| |||||||||||||||||||
206 (OG) |
191161-180497 - Rehabilitation of Districts Administration Buildings and residences and provision of missing facilities in District Bajaur. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.135 | 45.748 | 5 | 5 | 0 | 0 | 45.748 | 0 | 100% |
100% January - 2021 |
02- Units
1- Plastering in progress.
2- Finshing in progress. |
No Image |
1 Conference Room & DC House
2 Reh: of Existing Builidng
| |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 0 | 0 | 0 | 0 | 1.508 | 4.31 | - |
26% December - 2018 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 0 | 0 | 0 | 0 | 1.508 | 4.31 | - |
26% November - 2018 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 0 | 0 | 0 | 0 | 1.508 | 4.31 | - |
26% November - 2018 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 2.212 | 2.212 | 2.212 | 0 | 1.508 | 2.098 | 64% |
26% April - 2019 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 2.212 | 2.212 | 2.212 | 0 | 1.508 | 2.098 | 64% |
26% March - 2019 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 2.212 | 2.212 | 2.212 | 0 | 1.508 | 2.098 | 64% |
26% March - 2019 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 2.212 | 2.212 | 2.212 | 0 | 1.508 | 2.098 | 64% |
26% February - 2019 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.818 | 1.508 | 2.212 | 2.212 | 2.212 | 0 | 1.508 | 2.098 | 64% |
26% January - 2019 |
Completed. |
No Image |
Bannu | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 2.061 | 2.061 | 2.061 | 0 | 0 | 0 | - |
- December - 2019 |
Approved, AA awaited. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 2.061 | 2.061 | 2.061 | 0 | 0 | 0 | - |
- November - 2019 |
Approved, AA awaited. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
PC-I/DCE for Rs.33.275 m each submitted to DEO Male on 07/03/2018. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
PC-I/DCE for Rs.33.275 m each submitted to DEO Male on 07/03/2018. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
PC-I/DCE for Rs.33.275 m each submitted to DEO Male on 07/03/2018. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 5 | 5 | 5 | 0 | 0 | 0 | - |
- May - 2020 |
3 - Units
1- No space in existing building other site not yet identified.
2. Pc-1 amounting to
Rs. 33.275 M each unit
submitted to DEO (M).
3. Work order issued to
Horizon on 29/01/2020. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
3 - Units
1- No space in existing building other site not yet identified.
2. Pc-1 amounting to
Rs. 33.275 M each unit
submitted to DEO (M).
3. Work order issued to
Horizon on 29/01/2020. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
3 - Units
1- No space in existing building other site not yet identified.
2. Pc-1 amounting to
Rs. 33.275 M each unit
submitted to DEO (M).
3. Work order issued to
Horizon on 29/01/2020. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
3 - Units
1- No space in existing building other site not yet identified.
2. Pc-1 amounting to
Rs. 33.275 M each unit
submitted to DEO (M).
3. Work order issued to
Horizon on 29/01/2020. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
160595-Upgradation of 50 High Schools to Higher Secondary level (B&G) on need basis in Khyber Pakhtunkhwa (less 18 units) |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 2.061 | 2.061 | 2.061 | 0 | 0 | 0 | - |
- January - 2020 |
3 - Units
1- No space in existing building other site not yet identified.
2. Pc-1 amounting to
Rs. 33.275 M each unit
submitted to DEO (M).
3. Work order issued to
Horizon on 29/01/2020. |
No Image |
1) GGHS Rajjar PK-58
2) GHS Hisara UC Hisara PK-57 (renamed as GHS Sarki Titara
3) GGHS Muslim Abad Shakoor PK-56 | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.19 | 0 | 0 | 0 | 0 | 0 | 0 | 1.19 | - |
- December - 2018 |
Physically completed, contractor liabilities yet to be paid. |
No Image |
Chitral | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.19 | 0 | 0 | 0 | 0 | 0 | 0 | 1.19 | - |
- November - 2018 |
Physically completed, contractor liabilities yet to be paid. |
No Image |
Chitral | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.19 | 0 | 0 | 0 | 0 | 0 | 0 | 1.19 | - |
- November - 2018 |
Physically completed, contractor liabilities yet to be paid. |
No Image |
Chitral | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.19 | 0 | 0 | 0 | 0 | 0 | 0 | 1.19 | - |
- April - 2019 |
Physically completed, contractor liabilities yet to be paid. |
No Image |
Chitral | |||||||||||||||||||
206 (OG) |
140204-Continuation of ongoing ADP schemes for completion in 2014-15. |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.19 | 0 | 0 | 0 | 0 | 0 | 0 | 1.19 | - |
- March - 2019 |
Physically completed, contractor liabilities yet to be paid. |
No Image |
Chitral | |||||||||||||||||||