Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- December - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- December - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- October - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- September - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- August - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- July - 2020 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- May - 2021 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- April - 2021 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- March - 2021 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- February - 2021 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.847 | 0 | 0 | 0 | 0 | 0 | 0 | 7.847 | - |
- January - 2021 |
Work order issued.
Work Executed By PBC |
No Image |
1) Construction of Mosque in Khyber Pakhtunkh | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar MPD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 246.478 | 10 | 10 | 10 | 7.5 | 253.978 | 78.259 | 77% |
76% May - 2021 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of over head tank | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar MPD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 246.478 | 10 | 10 | 10 | 7.5 | 253.978 | 78.259 | 77% |
76% April - 2021 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of over head tank | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 10 | 10 | 10 | 2.5 | 2.5 | 324.737 | 3% |
1% December - 2020 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 10 | 10 | 10 | 2.5 | 2.5 | 324.737 | 3% |
1% December - 2020 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 2.5 | 2.5 | 5 | 2.5 | 2.5 | 332.237 | 1% |
1% October - 2020 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress. |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 2.5 | 2.5 | 2.5 | 2.5 | 2.5 | 332.237 | 1% |
1% September - 2020 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress. |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 0 | 0 | 0 | 0 | 0 | 334.737 | - |
- August - 2020 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress. |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 0 | 0 | 0 | 0 | 0 | 334.737 | - |
- July - 2020 |
Bore, OHT completed. Work in CM Sectt and house in |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 246.478 | 10 | 10 | 10 | 6.337 | 252.815 | 78.259 | 77% |
76% March - 2021 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of over head tank | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 246.478 | 10 | 10 | 10 | 6.337 | 252.815 | 78.259 | 77% |
76% February - 2021 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of over head tank | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Peshawar PBC-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 334.737 | 0 | 10 | 10 | 10 | 7.5 | 7.5 | 324.737 | 3% |
2% January - 2021 |
Bore, OHT completed.
CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress.
OHT Gunner lane is in progress.
Demand Rs. 20 m
TS Submitted |
No Image |
1) Boring of Tube Well and construction of ov | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- December - 2020 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- December - 2020 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 5 | 0 | 251.718 | 0 | - |
- October - 2020 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 2.5 | 0 | 251.718 | 0 | - |
- September - 2020 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 2.5 | 0 | 251.718 | 0 | - |
- August - 2020 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 0 | 0 | 0 | 251.718 | 0 | - |
- July - 2020 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- May - 2021 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- April - 2021 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- March - 2021 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- February - 2021 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 352.584 | 251.718 | 10 | 10 | 10 | 0 | 251.718 | 0 | - |
- January - 2021 |
Work in progress. |
No Image |
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- December - 2020 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- December - 2020 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- October - 2020 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- September - 2020 |
Work order issued. Site not yet handed over |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- August - 2020 |
Land occupied by Pak Army. Work order issued. |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- July - 2020 |
Land occupied by Pak Army. Work order issued. |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- May - 2021 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kalam PK-02 | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- April - 2021 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kalam PK-02 | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- March - 2021 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kalam PK-02 | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- February - 2021 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kalam PK-02 | |||||||||||||||||||
1453 (OG) |
120362-Emergent nature and Additional Construction of Office/Residential Buildings. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | - |
- January - 2021 |
Work order issued. Occupied by Pak Army. |
No Image |
Construction of C&W SDO office / residence at Kala | |||||||||||||||||||
Pages : 1 |