Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2021, January - 2018, February - 2021, February - 2018, March - 2021, March - 2018, April - 2021, April - 2018, May - 2018, May - 2021, June - 2018, July - 2020, July - 2017, August - 2020, August - 2017, September - 2020, September - 2017, October - 2020, October - 2017, November - 2017, December - 2020, December - 2017,

Showing Page Number : 1 of 4

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
- - - 04-08-17 - 8.726 0 0 0 0 0 0 8.726 - -
December - 2017
Tender approval under process.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi 2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
- - - 04-08-17 - 8.726 0 0 0 0 0 0 8.726 - -
September - 2017
Work started. Revised PC-I/DCE for Rs.2000 m submitted to SOR on 28/09/2017.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi 2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
- - - 04-08-17 - 8.726 0 0 0 0 0 0 8.726 - -
August - 2017
Work started.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi 2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
- - - 26-04-17 - 2.226 0 0 0 0 0 0 2.226 - -
July - 2017
Work started.
No Image
Jhangi Khoja Banda Qazi UC Jhangi
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 8.726 0 0 0 0 0 0 8.726 - -
November - 2017
Tender approval under process.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi 2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 8.726 0 0 0 0 0 0 8.726 - -
October - 2017
Tender approval under process.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi 2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 48.726 0 7.809 7.809 7.809 7.808 7.808 40.917 16% 16%
June - 2018
3 units - 1 unit work strated 2 units -DCE for Rs.20.902 m (Kharian to Chamian PK-49) submitted to SOR on 19/01/2018.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi
2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 48.726 0 10.2 10.2 10.2 7.05 7.05 38.526 21% 14%
May - 2018
3 units - 1 unit work strated 2 units -DCE for Rs.20.902 m (Kharian to Chamian PK-49) submitted to SOR on 19/01/2018.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi
2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 48.726 0 10.2 10.2 10.2 7.05 7.05 38.526 21% 14%
April - 2018
3 units - 1 unit work strated 2 units -DCE for Rs.20.902 m (Kharian to Chamian PK-49) submitted to SOR on 19/01/2018.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi
2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 8.726 0 8.7 8.7 8.7 5.808 5.808 0.026 100% 67%
March - 2018
3 units - 1 unit work strated 2 units -DCE for Rs.20.902 m (Kharian to Chamian PK-49) submitted to SOR on 19/01/2018.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi
2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 8.726 0 8.7 8.7 8.7 3.694 3.694 0.026 100% 42%
February - 2018
3 units - 1 unit work strated 2 units -DCE for Rs.20.902 m (Kharian to Chamian PK-49) submitted to SOR on 19/01/2018.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi
2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 8.726 0 0 0 0 0 0 8.726 - -
January - 2018
3 units - 1 unit work strated 2 units -DCE for Rs.20.902 m (Kharian to Chamian PK-49) submitted to SOR on 19/01/2018.
No Image
1) Jhangi Khoja Banda Qazi UC Jhangi 2) Reconstruction of Pandu Thana road
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
- - - 09-06-17 - 15.351 0 0 0 0 0 0 15.351 - -
December - 2017
Work started.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
- - - 09-06-17 - 15.351 0 0 0 0 0 0 15.351 - -
September - 2017
Approved. Revised PC-I/DCE for Rs.2000 m approved. NIT floated.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
- - - 26-04-17 - 0 0 0 0 0 0 0 0 - -
August - 2017
PC-I/DCE for Rs.15.351 m on MRS-2017 submitted to SOR on 02/08/2017. AA awaited.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
- - - 26-04-17 - 0 0 0 0 0 0 0 0 - -
July - 2017
PC-I/DCE for Rs.15.351 m on MRS-2017 submitted to SOR on 02/08/2017. AA awaited.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 0 0 0 0 0 15.351 - -
November - 2017
Tender approved.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 0 0 0 0 0 15.351 - -
October - 2017
Technical evaluation of contractor under process.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 4 4 4 2.932 2.932 11.351 26% 19%
June - 2018
Length 1 Km - earth work 40% completed.
No Image
Kotka Sherdad (Matiullah), Bannu
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 4 4 4 2.932 2.932 11.351 26% 19%
May - 2018
Length 1 Km - earth work 40% completed.
No Image
Kotka Sherdad (Matiullah), Bannu
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 4 4 4 1.738 1.738 11.351 26% 11%
April - 2018
Length 1 Km - earth work 40% completed.
No Image
Kotka Sherdad (Matiullah), Bannu
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 4 4 4 1.738 1.738 11.351 26% 11%
March - 2018
Length 1km - Earth work 40% completed.
No Image
Kotka Sherdad (Matiullah), Bannu
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 4 4 4 1.738 1.738 11.351 26% 11%
February - 2018
Length 1km - Earth work 40% completed.
No Image
Kotka Sherdad (Matiullah), Bannu
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 15.351 0 4 4 4 0 0 11.351 26% -
January - 2018
Work started.
No Image
Kotka Sherdad (Matiullah)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
- - - 26-04-17 - 20 0 0 0 0 0 0 20 - -
December - 2017
Work started.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
- - - 26-04-17 - 20 0 0 0 0 0 0 20 - -
September - 2017
Work order issued. Revised PC-I/DCE for Rs.2000 m approved. NIT floated.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
- - - 26-04-17 - 20 0 0 0 0 0 0 20 - -
August - 2017
Tender approval under process.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
- - - 26-04-17 - 20 0 0 0 0 0 0 20 - -
July - 2017
Tender approval under process.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
November - 2017
Work started.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
October - 2017
Work order issued.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 6 6 6 6 6 14 30% 30%
June - 2018
Length 2 Km - 30% work completed.
No Image
Thakot Banna road (29 Km), Battagram
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 6 6 6 6 6 14 30% 30%
May - 2018
Length 2 Km - work started. Rs.15 m demanded to clear liabilities.
No Image
Thakot Banna road (29 Km), Battagram
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 6 6 6 3.025 3.025 14 30% 15%
April - 2018
Length 2 Km - work started. Rs.15 m demanded to clear liabilities.
No Image
Thakot Banna road (29 Km), Battagram
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 5 5 5 3.025 3.025 15 25% 15%
March - 2018
Length 2 Km - work started.
No Image
Thakot Banna road (29 Km), Battagram
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 5 5 5 0 0 15 25% -
February - 2018
Length 2 km - Work started.
No Image
Thakot Banna road (29 Km), Battagram
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
January - 2018
Work started.
No Image
Thakot Banna road (29 Km)
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
- - - 23-11-17 - 117.05 0 0 57 57 17.368 17.368 117.05 - 15%
December - 2017
EW in progress.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
- - - 26-04-17 - 0 0 0 0 0 0 0 0 - -
September - 2017
PC-I/DCE for Rs.57.674 m submitted to SOR on 02/10/2017.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 117.05 0 0 57 57 17.365 17.365 117.05 - 15%
November - 2017
Work started.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 57.674 0 0 0 0 0 0 57.674 - -
October - 2017
Tender approval under process.
No Image
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 226.041 0 107.359 107.359 107.359 107.359 107.359 118.682 47% 47%
June - 2018
Completed (Package-1 (length - 5 Km (12 ft). Shifting of site involved in other packages. Summary submitted to CA.
No Image
Package-I
Package-II
Package-III
Package-IV
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 226.041 0 166.9 166.9 166.9 84.125 84.125 59.141 74% 37%
May - 2018
Work in progress on Package-1 (length - 5 Km (12 ft), shifting of site involved in other packages. Summary submitted to CA.
No Image
Package-I
Package-II
Package-III
Package-IV
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 226.041 0 166.9 166.9 166.9 62.733 62.733 59.141 74% 28%
April - 2018
Work in progress on Package-1 (length - 5 Km (12 ft), shifting of site involved in other packages. Summary submitted to CA.
No Image
Package-I
Package-II
Package-III
Package-IV
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 226.041 0 166.9 166.9 166.9 59.058 59.058 59.141 74% 26%
March - 2018
Work in progress on Package-1 (length - 5 Km (12 ft), shifting of site involved in other packages. Summary submitted to CA.
No Image
Package-I
Package-II
Package-III
Package-IV
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 226.041 0 0 156.9 156.9 52.917 52.917 226.041 - 23%
February - 2018
Work in progres on Package - I (length -5km (12 FT )) , Shifting of site involved in other Packages . Summary Submitted to CA
No Image
Package-I
Package-II
Package-III
Package-IV
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 226.041 0 0 57 57 41.257 41.257 226.041 - 18%
January - 2018
EW in progress.
No Image
Package-I
Package-II
Package-III
Package-IV
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Chitral
30-11--1 30-11--1 - 30-11--1 - 15 0 0 0 0 0 0 15 - -
June - 2018
Approved.
No Image
Rehabilitation/repair of Arkari Valley road Chitral
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Chitral
30-11--1 30-11--1 - 30-11--1 - 15 0 0 0 0 0 0 15 - -
May - 2018
Approved.
No Image
Rehabilitation/repair of Arkari Valley road Chitral
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
Chitral
30-11--1 30-11--1 - 30-11--1 - 15 0 0 0 0 0 0 15 - -
April - 2018
Approved.
No Image
Rehabilitation/repair of Arkari Valley road Chitral
1309
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 40 0 0 0 0 0 0 40 - -
June - 2018
Approved.
No Image
Improvement/rehabilitation of various roads in Pk-64 DI.Khan