Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2018, January - 2021, February - 2021, February - 2018, March - 2021, March - 2018, April - 2021, April - 2018, May - 2021, May - 2018, June - 2018, July - 2017, July - 2020, August - 2017, August - 2020, September - 2017, September - 2020, October - 2017, October - 2020, November - 2017, December - 2017, December - 2020,

Showing Page Number : 1 of 8

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
23-09-14 - - 19-01-16 - 451.062 281.208 0 20 20 19.898 301.106 169.854 - 67%
December - 2017
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44
2) PK-45
3) PK-46
4) PK-47
5) PK-48
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
23-09-14 - - 19-01-16 - 199.7 281.208 0 0 0 0 281.208 0 - 100%
September - 2017
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44
2) PK-45
3) PK-46
4) PK-47
5) PK-48
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
23-09-14 - - 19-01-16 - 199.7 281.208 0 0 0 0 281.208 0 - 100%
August - 2017
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44
2) PK-45
3) PK-46
4) PK-47
5) PK-48
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
23-09-14 - - 19-01-16 - 199.7 281.208 0 0 0 0 281.208 0 - 100%
July - 2017
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44
2) PK-45
3) PK-46
4) PK-47
5) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
December - 2020
16 Units - Work order issued.
No Image
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
December - 2020
16 Units - Work order issued.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 199.7 281.208 0 20 20 19.565 300.773 0 - 100%
November - 2017
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44
2) PK-45
3) PK-46
4) PK-47
5) PK-48
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 199.7 281.208 0 0 0 0 281.208 0 - 100%
October - 2017
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44
2) PK-45
3) PK-46
4) PK-47
5) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
October - 2020
16 Units - Work order issued.
No Image
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
September - 2020
16 Units - Work order issued.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 451.062 281.208 61 61 61 61 342.208 108.854 76% 76%
June - 2018
Length 49 Km (85 units) - work in progress.
No Image
1) Construction of PCC road Mohallah Dar-ul-Khair Malikpura PK-44
2) Construction of road Kuthera road UC Sheikhulbandi PK-44
3) Construction of PCC road Dana UC Kakul PK-44
4) PCC road near Janazagah Dhamtour PK-44
5) Construction of PCC road and sewerage of Chonna Kari PK-44
6) Construction of Kuthera Salol Bandi Doga to Dhaki road Dozer/excavator work (PH basis) PK-45
7) Construction of PCC road from main road Rankote to Primary School Rankote Mohallah Faizabad PK-45
8) Construction of Jabli Hill Sanakar road PK-45
9) Construction of Kalas to Panat road PK-45
10) Improvement/rehabilitation of Beri Bagla to Leeranto Jhallan road and Jhallanto Majhan road PK-45
11) PCC Sangar Seena Dara road PK-45
12) Construction of raod from main road Sufi Razaq Mohra PK-45
13) Reconstruction of Nakar to Riala road Dozer/Excavator work (PH basis) PK-45
14) Construction Nari Dana Banota to Khokarial road Dozer/Excavator work (PH basis) PK-45
15) Improvement PCC Kuthiala Gali to Rich Behn road i/c Flood Protection Wealls UC Kuthiala PK-46
16) Improvement and PCC Mohrian to TarhanaMalkan road UC Balderi PK-46
17) Improvement and PCC Phagal Maira to Khattak Maira road UC Banda Pir Khan PK-46
18) Improvement and PCC Pando Thana to Sargal road i/c Talhar and Siyal UC Pawa PK-46
19) Construction, PCC Kalidhar Auchar road UC Banda Pir Khan PK-46
20) Construction RW at Salhad Barrier to Burag road PK-46
21) Improvement and BT of Barthem Nalothian road 0.70 Km PK-47
22) PCC/widening RW Ghari to Noor Pur UC Lora PK-48
23) PCC/RW Seri to Khoiyan UC Lora PK-48
24) PCC/widening/RW Taror to Pairra UC Seer Sharqi PK-48
25) Rehabilitationof link road from Fawara Chowk to Band Khoo PK-44
26) Construction of PCC Behlolia PK-44
27) Rehabilitation of PCC road/RW at Malach road PK-44
28) PCC road Maira Mandroach to Faqir Bandi PK-44
29) Construction of PCC/sewerage line near House of Haroon Khan PK-44
30) Construction of PCC road near Iqbal KhanHouse Kohati Masjid Kehal PK-44
31) PCC road Mohallah Charri Banda Sanjilian PK-44
32) Construction of PCC road from Beer to Banda Nabi PK-44
33) PCC road Allama Iqbal Town Saddat street road PK-44
34) Construction of PCC road Orash Colony Nawansher PK-44
35) Improvement and rehabilitation of PCC Kali Dahar road PK-46
36) Improvement and rehabilitation of road Banda Khair Ali Khan road PK-46
37) Improvement and rehabilitation of road from Main road Mangal to Basti Akram Khan PK-46
38) Improvement and rehabilitation of road from Mangal Chinar to Banda Pir Khan PK-46
39) Improvement and rehabilitation of road Manu De Ban Dakhli Tarhana PK-46
40) Improvement and rehabilitation of road from Banda Pir Khan to Samalser PK-46
41) Improvement and rehabilitation of road KKH to Morekalan PK-46
42) Improvement and rehabilitation of PCC road from Mangal to Chitta Maira PK-46
43) Improvement and rehabilitation of Banda Amlok road PK-46
44) PCC/widening of Chanala to Noormang road UC Namli Maira PK-48
45) PCC Dheri to Bandi Karpasi road UC Namli Maira PK-48
46) PCC/widening of road from GMS Tharyati UC Namli Maira PK-48
47) PCC/improvement Barra Khaitar road UC Seer Sharqi PK-48
48) PCC road Ropar and Tairan UC Phallah PK-48
49) PCC Bagla raod from House of Master Nazik UC Phallah PK-48
50) PCC Bogri road from Kayani de Gali to Ratti Gali UC Phallah PK-48
51) PCC/improvement of Barmi Gali Jhansa SherranKeri Raiki road UC Nathiagali PK-48
52) PCC/improvement of Hoter Kass to Chatri Khurd road UC Kuthwal PK-48
53) PCC road Mochi Dhara Jaswara UC Nathiagali PK-48
54) PCC road from Qalandarabad to Sajikot UC Baidheri PK-46
55) PCC road from Nika Pani to Rian Da Maira and Pathi Da Maira road PK-46
56) PCC road Sajikot Maira road to village Gojri UC Baldehri PK-46
57) PCC road from GGHS Sajikot to Charian and Haimera road Baldheri PK-46
58) PCC road from Lamba Banda road PK-46
59) PCC road from KKH to Lower Dara Lower Salhad UC Salhad PK-46
60) Rehabilitation of Salhad Naala Bridge near Forest Barrier UC Salhad PK-46
61) RW Dheri Maira road UC Salhad PK-46
62) Construction of Small RCC Bridge at Mohra Naala UC Pawa PK-46
63) New shingle road from Pind Kargo Gali to Barkot UC Pind Kargo PK-46
64) Rehabilitation of 2 Nos Bridge of Bandi Phullan road and Gandhian road PK-46
65) Improvement/widening and pavement of Danna to Panchalla road UC Namli Maira PK-48
66) Improvement/widening of Maira Khurd to Kutli road UC Namli Maira PK-48
67) Improvement/widening/pavement of Delli Monda to Surma Gali road UC Namli Maira PK-48
68) Construction and pavement of Halipad to Narreya road UC Namli Maira PK-48
69) Improvement/pavement of Channal to Upper Maira Kalan road UC Namli Maira PK-48
70) Construction/improvement of road from Charian to Jaster link with Pakhlan UC Namli Maira PK-48
71) Construction of road from Jaster to Kutli via Noor Nala and Bagla UC Namli Maira PK-48
72) Improvement/rehabilitation of road village Dobather Katha Seri UC Jhangi PK-48
73) Improvement/rehabilitation of road from Shimla Hill to Dehri to Khorrian road PK-48
74) Construction/rehabilitation of road from GGHS Aziz Bang to Maira Aziz Bang (4 Km)Pk-48
75) Improvement/rehabilitation/upgradation/construction of Namli Maira road (15.05 Km) PK-48
76) Feasibility/design/supervision/construction/improvement/rehabilitation/upgradation of Main Namli Maira road (15.05 Km)
77) Feasibility/design/construction of Beerangali raods (15 Km) PK-48
78) Jaffar Dakh Doga (1 Km) PK-48
79) Jaffar Pehlwan road (1 Km) PK-48
80) Sarbanna Beerangali road (2 Km) PK-48
81) Keri rod (1.5 Km) Pk-48
82) SHU to Kharther road (1.5 Km) PK-48
83) Beerangali Burj UC Laik road to Jogimar (5 Km) PK-48
84) Jandar Bari road (1 Km) PK-48
85) Akhreela under Seri road (2 Km) PK-48
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 451.062 281.208 58 58 58 58 339.208 111.854 75% 75%
May - 2018
Length 49 Km (85 units) - work in progress.
No Image
1) Construction of PCC road Mohallah Dar-ul-Khair Malikpura PK-44
2) Construction of road Kuthera road UC Sheikhulbandi PK-44
3) Construction of PCC road Dana UC Kakul PK-44
4) PCC road near Janazagah Dhamtour PK-44
5) Construction of PCC road and sewerage of Chonna Kari PK-44
6) Construction of Kuthera Salol Bandi Doga to Dhaki road Dozer/excavator work (PH basis) PK-45
7) Construction of PCC road from main road Rankote to Primary School Rankote Mohallah Faizabad PK-45
8) Construction of Jabli Hill Sanakar road PK-45
9) Construction of Kalas to Panat road PK-45
10) Improvement/rehabilitation of Beri Bagla to Leeranto Jhallan road and Jhallanto Majhan road PK-45
11) PCC Sangar Seena Dara road PK-45
12) Construction of raod from main road Sufi Razaq Mohra PK-45
13) Reconstruction of Nakar to Riala road Dozer/Excavator work (PH basis) PK-45
14) Construction Nari Dana Banota to Khokarial road Dozer/Excavator work (PH basis) PK-45
15) Improvement PCC Kuthiala Gali to Rich Behn road i/c Flood Protection Wealls UC Kuthiala PK-46
16) Improvement and PCC Mohrian to TarhanaMalkan road UC Balderi PK-46
17) Improvement and PCC Phagal Maira to Khattak Maira road UC Banda Pir Khan PK-46
18) Improvement and PCC Pando Thana to Sargal road i/c Talhar and Siyal UC Pawa PK-46
19) Construction, PCC Kalidhar Auchar road UC Banda Pir Khan PK-46
20) Construction RW at Salhad Barrier to Burag road PK-46
21) Improvement and BT of Barthem Nalothian road 0.70 Km PK-47
22) PCC/widening RW Ghari to Noor Pur UC Lora PK-48
23) PCC/RW Seri to Khoiyan UC Lora PK-48
24) PCC/widening/RW Taror to Pairra UC Seer Sharqi PK-48
25) Rehabilitationof link road from Fawara Chowk to Band Khoo PK-44
26) Construction of PCC Behlolia PK-44
27) Rehabilitation of PCC road/RW at Malach road PK-44
28) PCC road Maira Mandroach to Faqir Bandi PK-44
29) Construction of PCC/sewerage line near House of Haroon Khan PK-44
30) Construction of PCC road near Iqbal KhanHouse Kohati Masjid Kehal PK-44
31) PCC road Mohallah Charri Banda Sanjilian PK-44
32) Construction of PCC road from Beer to Banda Nabi PK-44
33) PCC road Allama Iqbal Town Saddat street road PK-44
34) Construction of PCC road Orash Colony Nawansher PK-44
35) Improvement and rehabilitation of PCC Kali Dahar road PK-46
36) Improvement and rehabilitation of road Banda Khair Ali Khan road PK-46
37) Improvement and rehabilitation of road from Main road Mangal to Basti Akram Khan PK-46
38) Improvement and rehabilitation of road from Mangal Chinar to Banda Pir Khan PK-46
39) Improvement and rehabilitation of road Manu De Ban Dakhli Tarhana PK-46
40) Improvement and rehabilitation of road from Banda Pir Khan to Samalser PK-46
41) Improvement and rehabilitation of road KKH to Morekalan PK-46
42) Improvement and rehabilitation of PCC road from Mangal to Chitta Maira PK-46
43) Improvement and rehabilitation of Banda Amlok road PK-46
44) PCC/widening of Chanala to Noormang road UC Namli Maira PK-48
45) PCC Dheri to Bandi Karpasi road UC Namli Maira PK-48
46) PCC/widening of road from GMS Tharyati UC Namli Maira PK-48
47) PCC/improvement Barra Khaitar road UC Seer Sharqi PK-48
48) PCC road Ropar and Tairan UC Phallah PK-48
49) PCC Bagla raod from House of Master Nazik UC Phallah PK-48
50) PCC Bogri road from Kayani de Gali to Ratti Gali UC Phallah PK-48
51) PCC/improvement of Barmi Gali Jhansa SherranKeri Raiki road UC Nathiagali PK-48
52) PCC/improvement of Hoter Kass to Chatri Khurd road UC Kuthwal PK-48
53) PCC road Mochi Dhara Jaswara UC Nathiagali PK-48
54) PCC road from Qalandarabad to Sajikot UC Baidheri PK-46
55) PCC road from Nika Pani to Rian Da Maira and Pathi Da Maira road PK-46
56) PCC road Sajikot Maira road to village Gojri UC Baldehri PK-46
57) PCC road from GGHS Sajikot to Charian and Haimera road Baldheri PK-46
58) PCC road from Lamba Banda road PK-46
59) PCC road from KKH to Lower Dara Lower Salhad UC Salhad PK-46
60) Rehabilitation of Salhad Naala Bridge near Forest Barrier UC Salhad PK-46
61) RW Dheri Maira road UC Salhad PK-46
62) Construction of Small RCC Bridge at Mohra Naala UC Pawa PK-46
63) New shingle road from Pind Kargo Gali to Barkot UC Pind Kargo PK-46
64) Rehabilitation of 2 Nos Bridge of Bandi Phullan road and Gandhian road PK-46
65) Improvement/widening and pavement of Danna to Panchalla road UC Namli Maira PK-48
66) Improvement/widening of Maira Khurd to Kutli road UC Namli Maira PK-48
67) Improvement/widening/pavement of Delli Monda to Surma Gali road UC Namli Maira PK-48
68) Construction and pavement of Halipad to Narreya road UC Namli Maira PK-48
69) Improvement/pavement of Channal to Upper Maira Kalan road UC Namli Maira PK-48
70) Construction/improvement of road from Charian to Jaster link with Pakhlan UC Namli Maira PK-48
71) Construction of road from Jaster to Kutli via Noor Nala and Bagla UC Namli Maira PK-48
72) Improvement/rehabilitation of road village Dobather Katha Seri UC Jhangi PK-48
73) Improvement/rehabilitation of road from Shimla Hill to Dehri to Khorrian road PK-48
74) Construction/rehabilitation of road from GGHS Aziz Bang to Maira Aziz Bang (4 Km)Pk-48
75) Improvement/rehabilitation/upgradation/construction of Namli Maira road (15.05 Km) PK-48
76) Feasibility/design/supervision/construction/improvement/rehabilitation/upgradation of Main Namli Maira road (15.05 Km)
77) Feasibility/design/construction of Beerangali raods (15 Km) PK-48
78) Jaffar Dakh Doga (1 Km) PK-48
79) Jaffar Pehlwan road (1 Km) PK-48
80) Sarbanna Beerangali road (2 Km) PK-48
81) Keri rod (1.5 Km) Pk-48
82) SHU to Kharther road (1.5 Km) PK-48
83) Beerangali Burj UC Laik road to Jogimar (5 Km) PK-48
84) Jandar Bari road (1 Km) PK-48
85) Akhreela under Seri road (2 Km) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
May - 2021
16 Units - Work order issued.
No Image
U/C MAJHUAN / NARA
(1) Improvement & Widening of Upper Goal to Lower Goal (Haji Pervaiz House To Haji Rozi khan House).
(2) Improvement & Widening of Link Road from Bodla Bazaar to Mohallah Morri.
(3) Improvement & Widening of Link Road in V/C-I Majohan Saniala and Bandi To Sandakki.
(4) Improvement & Widening of Link Road Manhoni To Nara via Dhamnaka.
   
U/C NATHAIAGALI
(1) Improvement & Widening of Mochi Dara Road Bhek Road.
(2) Improvement & Widening of Road from Primary School Kehtar via Shani Barh to
Arif House in V/C Bagan Khetar.
(3) Improvement & Widening of Bagan Dakhan Road from Jandi Primary School Dhakan in V/C Bagan.
   
U/C BEERANGALI
(1) Improvement & Widening of Harran to Dhaka Road.
(2) Improvement & Widening of Dhandian Tupla Road.
(3) Improvement & Widening of Beermi Gali to Banj Via Bandalyi.
 
   
U/C PHALKOT
(1) Improvement & Widening of Kutli to Dagri Road V/C Phalkot-III.
 
  
U/C BAGNOTAR
(1) Improvement & Widening of Chahan Gran Road U/C Bagnotar.
(2) Improvement & Widening of Bandi Maira Road U/C Bagnotar
(3) Improvement & Widening of Gehya to Jhandan U/C Bagnotar.
 
  
U/C SARBANA
(1) Improvement & Widening of Maira Aziz Bang to Shafiq House road.\
(2) Improvement & Widening of Road from Malik Riaz house Khanin Azizbang.
(3) Improvement & Widening of Chatti Seer Gah Road V/C Deesal.  
 
  
U/C KUTHWAL
(1) Improvement & Widening of Road From Rasoolia to Mohallah Pamgarh Road U/C Kuthwal.
(2) Improvement & Widening of Road from Jee Kalsi to Safeer house U/C Kuthwal.  
 
   
1) Rehabilitation / improvement of Changli road.
2) Rehabilitation / improvement of Bela Bridge Dolla Road.
3) Rehabilitation / improvement of Khoi Dhari Sari Bandi Bandi Pahar road.
4) Rehabilitation / improvement of Sathal Sarhan Gali Meeran Road.
5) Rehabilitation / improvement of Hazeera Tarnwai road.
6) Rehabilitation / improvement of Beela Kaloo Bandi.  
 
  
1) Rehabilitation / improvement of Mojhot Bairbagal  leeran and Doga road.
2) Rehabilitation / improvement of Nakhaiter Batar road.
3) Rehabilitation / improvement of Dakhan Sangal road U/C Bakot.
4) Rehabilitation / improvement of Longal Road i/c R/Wall.
 
  
Rehabilitation / improvement of link road village khoyaan.  
 
 
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 451.062 281.208 58 58 58 57.999 339.207 111.854 75% 75%
April - 2018
Length 49 Km (85 units) - work in progress.
No Image
1) Construction of PCC road Mohallah Dar-ul-Khair Malikpura PK-44
2) Construction of road Kuthera road UC Sheikhulbandi PK-44
3) Construction of PCC road Dana UC Kakul PK-44
4) PCC road near Janazagah Dhamtour PK-44
5) Construction of PCC road and sewerage of Chonna Kari PK-44
6) Construction of Kuthera Salol Bandi Doga to Dhaki road Dozer/excavator work (PH basis) PK-45
7) Construction of PCC road from main road Rankote to Primary School Rankote Mohallah Faizabad PK-45
8) Construction of Jabli Hill Sanakar road PK-45
9) Construction of Kalas to Panat road PK-45
10) Improvement/rehabilitation of Beri Bagla to Leeranto Jhallan road and Jhallanto Majhan road PK-45
11) PCC Sangar Seena Dara road PK-45
12) Construction of raod from main road Sufi Razaq Mohra PK-45
13) Reconstruction of Nakar to Riala road Dozer/Excavator work (PH basis) PK-45
14) Construction Nari Dana Banota to Khokarial road Dozer/Excavator work (PH basis) PK-45
15) Improvement PCC Kuthiala Gali to Rich Behn road i/c Flood Protection Wealls UC Kuthiala PK-46
16) Improvement and PCC Mohrian to TarhanaMalkan road UC Balderi PK-46
17) Improvement and PCC Phagal Maira to Khattak Maira road UC Banda Pir Khan PK-46
18) Improvement and PCC Pando Thana to Sargal road i/c Talhar and Siyal UC Pawa PK-46
19) Construction, PCC Kalidhar Auchar road UC Banda Pir Khan PK-46
20) Construction RW at Salhad Barrier to Burag road PK-46
21) Improvement and BT of Barthem Nalothian road 0.70 Km PK-47
22) PCC/widening RW Ghari to Noor Pur UC Lora PK-48
23) PCC/RW Seri to Khoiyan UC Lora PK-48
24) PCC/widening/RW Taror to Pairra UC Seer Sharqi PK-48
25) Rehabilitationof link road from Fawara Chowk to Band Khoo PK-44
26) Construction of PCC Behlolia PK-44
27) Rehabilitation of PCC road/RW at Malach road PK-44
28) PCC road Maira Mandroach to Faqir Bandi PK-44
29) Construction of PCC/sewerage line near House of Haroon Khan PK-44
30) Construction of PCC road near Iqbal KhanHouse Kohati Masjid Kehal PK-44
31) PCC road Mohallah Charri Banda Sanjilian PK-44
32) Construction of PCC road from Beer to Banda Nabi PK-44
33) PCC road Allama Iqbal Town Saddat street road PK-44
34) Construction of PCC road Orash Colony Nawansher PK-44
35) Improvement and rehabilitation of PCC Kali Dahar road PK-46
36) Improvement and rehabilitation of road Banda Khair Ali Khan road PK-46
37) Improvement and rehabilitation of road from Main road Mangal to Basti Akram Khan PK-46
38) Improvement and rehabilitation of road from Mangal Chinar to Banda Pir Khan PK-46
39) Improvement and rehabilitation of road Manu De Ban Dakhli Tarhana PK-46
40) Improvement and rehabilitation of road from Banda Pir Khan to Samalser PK-46
41) Improvement and rehabilitation of road KKH to Morekalan PK-46
42) Improvement and rehabilitation of PCC road from Mangal to Chitta Maira PK-46
43) Improvement and rehabilitation of Banda Amlok road PK-46
44) PCC/widening of Chanala to Noormang road UC Namli Maira PK-48
45) PCC Dheri to Bandi Karpasi road UC Namli Maira PK-48
46) PCC/widening of road from GMS Tharyati UC Namli Maira PK-48
47) PCC/improvement Barra Khaitar road UC Seer Sharqi PK-48
48) PCC road Ropar and Tairan UC Phallah PK-48
49) PCC Bagla raod from House of Master Nazik UC Phallah PK-48
50) PCC Bogri road from Kayani de Gali to Ratti Gali UC Phallah PK-48
51) PCC/improvement of Barmi Gali Jhansa SherranKeri Raiki road UC Nathiagali PK-48
52) PCC/improvement of Hoter Kass to Chatri Khurd road UC Kuthwal PK-48
53) PCC road Mochi Dhara Jaswara UC Nathiagali PK-48
54) PCC road from Qalandarabad to Sajikot UC Baidheri PK-46
55) PCC road from Nika Pani to Rian Da Maira and Pathi Da Maira road PK-46
56) PCC road Sajikot Maira road to village Gojri UC Baldehri PK-46
57) PCC road from GGHS Sajikot to Charian and Haimera road Baldheri PK-46
58) PCC road from Lamba Banda road PK-46
59) PCC road from KKH to Lower Dara Lower Salhad UC Salhad PK-46
60) Rehabilitation of Salhad Naala Bridge near Forest Barrier UC Salhad PK-46
61) RW Dheri Maira road UC Salhad PK-46
62) Construction of Small RCC Bridge at Mohra Naala UC Pawa PK-46
63) New shingle road from Pind Kargo Gali to Barkot UC Pind Kargo PK-46
64) Rehabilitation of 2 Nos Bridge of Bandi Phullan road and Gandhian road PK-46
65) Improvement/widening and pavement of Danna to Panchalla road UC Namli Maira PK-48
66) Improvement/widening of Maira Khurd to Kutli road UC Namli Maira PK-48
67) Improvement/widening/pavement of Delli Monda to Surma Gali road UC Namli Maira PK-48
68) Construction and pavement of Halipad to Narreya road UC Namli Maira PK-48
69) Improvement/pavement of Channal to Upper Maira Kalan road UC Namli Maira PK-48
70) Construction/improvement of road from Charian to Jaster link with Pakhlan UC Namli Maira PK-48
71) Construction of road from Jaster to Kutli via Noor Nala and Bagla UC Namli Maira PK-48
72) Improvement/rehabilitation of road village Dobather Katha Seri UC Jhangi PK-48
73) Improvement/rehabilitation of road from Shimla Hill to Dehri to Khorrian road PK-48
74) Construction/rehabilitation of road from GGHS Aziz Bang to Maira Aziz Bang (4 Km)Pk-48
75) Improvement/rehabilitation/upgradation/construction of Namli Maira road (15.05 Km) PK-48
76) Feasibility/design/supervision/construction/improvement/rehabilitation/upgradation of Main Namli Maira road (15.05 Km)
77) Feasibility/design/construction of Beerangali raods (15 Km) PK-48
78) Jaffar Dakh Doga (1 Km) PK-48
79) Jaffar Pehlwan road (1 Km) PK-48
80) Sarbanna Beerangali road (2 Km) PK-48
81) Keri rod (1.5 Km) Pk-48
82) SHU to Kharther road (1.5 Km) PK-48
83) Beerangali Burj UC Laik road to Jogimar (5 Km) PK-48
84) Jandar Bari road (1 Km) PK-48
85) Akhreela under Seri road (2 Km) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
April - 2021
16 Units - Work order issued.
No Image
U/C MAJHUAN / NARA
(1) Improvement & Widening of Upper Goal to Lower Goal (Haji Pervaiz House To Haji Rozi khan House).
(2) Improvement & Widening of Link Road from Bodla Bazaar to Mohallah Morri.
(3) Improvement & Widening of Link Road in V/C-I Majohan Saniala and Bandi To Sandakki.
(4) Improvement & Widening of Link Road Manhoni To Nara via Dhamnaka.
   
U/C NATHAIAGALI
(1) Improvement & Widening of Mochi Dara Road Bhek Road.
(2) Improvement & Widening of Road from Primary School Kehtar via Shani Barh to
Arif House in V/C Bagan Khetar.
(3) Improvement & Widening of Bagan Dakhan Road from Jandi Primary School Dhakan in V/C Bagan.
   
U/C BEERANGALI
(1) Improvement & Widening of Harran to Dhaka Road.
(2) Improvement & Widening of Dhandian Tupla Road.
(3) Improvement & Widening of Beermi Gali to Banj Via Bandalyi.
 
   
U/C PHALKOT
(1) Improvement & Widening of Kutli to Dagri Road V/C Phalkot-III.
 
  
U/C BAGNOTAR
(1) Improvement & Widening of Chahan Gran Road U/C Bagnotar.
(2) Improvement & Widening of Bandi Maira Road U/C Bagnotar
(3) Improvement & Widening of Gehya to Jhandan U/C Bagnotar.
 
  
U/C SARBANA
(1) Improvement & Widening of Maira Aziz Bang to Shafiq House road.\
(2) Improvement & Widening of Road from Malik Riaz house Khanin Azizbang.
(3) Improvement & Widening of Chatti Seer Gah Road V/C Deesal.  
 
  
U/C KUTHWAL
(1) Improvement & Widening of Road From Rasoolia to Mohallah Pamgarh Road U/C Kuthwal.
(2) Improvement & Widening of Road from Jee Kalsi to Safeer house U/C Kuthwal.  
 
   
1) Rehabilitation / improvement of Changli road.
2) Rehabilitation / improvement of Bela Bridge Dolla Road.
3) Rehabilitation / improvement of Khoi Dhari Sari Bandi Bandi Pahar road.
4) Rehabilitation / improvement of Sathal Sarhan Gali Meeran Road.
5) Rehabilitation / improvement of Hazeera Tarnwai road.
6) Rehabilitation / improvement of Beela Kaloo Bandi.  
 
  
1) Rehabilitation / improvement of Mojhot Bairbagal  leeran and Doga road.
2) Rehabilitation / improvement of Nakhaiter Batar road.
3) Rehabilitation / improvement of Dakhan Sangal road U/C Bakot.
4) Rehabilitation / improvement of Longal Road i/c R/Wall.
 
  
Rehabilitation / improvement of link road village khoyaan.  
 
 
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 451.062 281.208 56 56 56 52.313 333.521 113.854 75% 74%
March - 2018
Length 49 Km (85 units) - work in progress.
No Image
1) Construction of PCC road Mohallah Dar-ul-Khair Malikpura PK-44
2) Construction of road Kuthera road UC Sheikhulbandi PK-44
3) Construction of PCC road Dana UC Kakul PK-44
4) PCC road near Janazagah Dhamtour PK-44
5) Construction of PCC road and sewerage of Chonna Kari PK-44
6) Construction of Kuthera Salol Bandi Doga to Dhaki road Dozer/excavator work (PH basis) PK-45
7) Construction of PCC road from main road Rankote to Primary School Rankote Mohallah Faizabad PK-45
8) Construction of Jabli Hill Sanakar road PK-45
9) Construction of Kalas to Panat road PK-45
10) Improvement/rehabilitation of Beri Bagla to Leeranto Jhallan road and Jhallanto Majhan road PK-45
11) PCC Sangar Seena Dara road PK-45
12) Construction of raod from main road Sufi Razaq Mohra PK-45
13) Reconstruction of Nakar to Riala road Dozer/Excavator work (PH basis) PK-45
14) Construction Nari Dana Banota to Khokarial road Dozer/Excavator work (PH basis) PK-45
15) Improvement PCC Kuthiala Gali to Rich Behn road i/c Flood Protection Wealls UC Kuthiala PK-46
16) Improvement and PCC Mohrian to TarhanaMalkan road UC Balderi PK-46
17) Improvement and PCC Phagal Maira to Khattak Maira road UC Banda Pir Khan PK-46
18) Improvement and PCC Pando Thana to Sargal road i/c Talhar and Siyal UC Pawa PK-46
19) Construction, PCC Kalidhar Auchar road UC Banda Pir Khan PK-46
20) Construction RW at Salhad Barrier to Burag road PK-46
21) Improvement and BT of Barthem Nalothian road 0.70 Km PK-47
22) PCC/widening RW Ghari to Noor Pur UC Lora PK-48
23) PCC/RW Seri to Khoiyan UC Lora PK-48
24) PCC/widening/RW Taror to Pairra UC Seer Sharqi PK-48
25) Rehabilitationof link road from Fawara Chowk to Band Khoo PK-44
26) Construction of PCC Behlolia PK-44
27) Rehabilitation of PCC road/RW at Malach road PK-44
28) PCC road Maira Mandroach to Faqir Bandi PK-44
29) Construction of PCC/sewerage line near House of Haroon Khan PK-44
30) Construction of PCC road near Iqbal KhanHouse Kohati Masjid Kehal PK-44
31) PCC road Mohallah Charri Banda Sanjilian PK-44
32) Construction of PCC road from Beer to Banda Nabi PK-44
33) PCC road Allama Iqbal Town Saddat street road PK-44
34) Construction of PCC road Orash Colony Nawansher PK-44
35) Improvement and rehabilitation of PCC Kali Dahar road PK-46
36) Improvement and rehabilitation of road Banda Khair Ali Khan road PK-46
37) Improvement and rehabilitation of road from Main road Mangal to Basti Akram Khan PK-46
38) Improvement and rehabilitation of road from Mangal Chinar to Banda Pir Khan PK-46
39) Improvement and rehabilitation of road Manu De Ban Dakhli Tarhana PK-46
40) Improvement and rehabilitation of road from Banda Pir Khan to Samalser PK-46
41) Improvement and rehabilitation of road KKH to Morekalan PK-46
42) Improvement and rehabilitation of PCC road from Mangal to Chitta Maira PK-46
43) Improvement and rehabilitation of Banda Amlok road PK-46
44) PCC/widening of Chanala to Noormang road UC Namli Maira PK-48
45) PCC Dheri to Bandi Karpasi road UC Namli Maira PK-48
46) PCC/widening of road from GMS Tharyati UC Namli Maira PK-48
47) PCC/improvement Barra Khaitar road UC Seer Sharqi PK-48
48) PCC road Ropar and Tairan UC Phallah PK-48
49) PCC Bagla raod from House of Master Nazik UC Phallah PK-48
50) PCC Bogri road from Kayani de Gali to Ratti Gali UC Phallah PK-48
51) PCC/improvement of Barmi Gali Jhansa SherranKeri Raiki road UC Nathiagali PK-48
52) PCC/improvement of Hoter Kass to Chatri Khurd road UC Kuthwal PK-48
53) PCC road Mochi Dhara Jaswara UC Nathiagali PK-48
54) PCC road from Qalandarabad to Sajikot UC Baidheri PK-46
55) PCC road from Nika Pani to Rian Da Maira and Pathi Da Maira road PK-46
56) PCC road Sajikot Maira road to village Gojri UC Baldehri PK-46
57) PCC road from GGHS Sajikot to Charian and Haimera road Baldheri PK-46
58) PCC road from Lamba Banda road PK-46
59) PCC road from KKH to Lower Dara Lower Salhad UC Salhad PK-46
60) Rehabilitation of Salhad Naala Bridge near Forest Barrier UC Salhad PK-46
61) RW Dheri Maira road UC Salhad PK-46
62) Construction of Small RCC Bridge at Mohra Naala UC Pawa PK-46
63) New shingle road from Pind Kargo Gali to Barkot UC Pind Kargo PK-46
64) Rehabilitation of 2 Nos Bridge of Bandi Phullan road and Gandhian road PK-46
65) Improvement/widening and pavement of Danna to Panchalla road UC Namli Maira PK-48
66) Improvement/widening of Maira Khurd to Kutli road UC Namli Maira PK-48
67) Improvement/widening/pavement of Delli Monda to Surma Gali road UC Namli Maira PK-48
68) Construction and pavement of Halipad to Narreya road UC Namli Maira PK-48
69) Improvement/pavement of Channal to Upper Maira Kalan road UC Namli Maira PK-48
70) Construction/improvement of road from Charian to Jaster link with Pakhlan UC Namli Maira PK-48
71) Construction of road from Jaster to Kutli via Noor Nala and Bagla UC Namli Maira PK-48
72) Improvement/rehabilitation of road village Dobather Katha Seri UC Jhangi PK-48
73) Improvement/rehabilitation of road from Shimla Hill to Dehri to Khorrian road PK-48
74) Construction/rehabilitation of road from GGHS Aziz Bang to Maira Aziz Bang (4 Km)Pk-48
75) Improvement/rehabilitation/upgradation/construction of Namli Maira road (15.05 Km) PK-48
76) Feasibility/design/supervision/construction/improvement/rehabilitation/upgradation of Main Namli Maira road (15.05 Km)
77) Feasibility/design/construction of Beerangali raods (15 Km) PK-48
78) Jaffar Dakh Doga (1 Km) PK-48
79) Jaffar Pehlwan road (1 Km) PK-48
80) Sarbanna Beerangali road (2 Km) PK-48
81) Keri rod (1.5 Km) Pk-48
82) SHU to Kharther road (1.5 Km) PK-48
83) Beerangali Burj UC Laik road to Jogimar (5 Km) PK-48
84) Jandar Bari road (1 Km) PK-48
85) Akhreela under Seri road (2 Km) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
March - 2021
16 Units - Work order issued.
No Image
U/C MAJHUAN / NARA
(1) Improvement & Widening of Upper Goal to Lower Goal (Haji Pervaiz House To Haji Rozi khan House).
(2) Improvement & Widening of Link Road from Bodla Bazaar to Mohallah Morri.
(3) Improvement & Widening of Link Road in V/C-I Majohan Saniala and Bandi To Sandakki.
(4) Improvement & Widening of Link Road Manhoni To Nara via Dhamnaka.
   
U/C NATHAIAGALI
(1) Improvement & Widening of Mochi Dara Road Bhek Road.
(2) Improvement & Widening of Road from Primary School Kehtar via Shani Barh to
Arif House in V/C Bagan Khetar.
(3) Improvement & Widening of Bagan Dakhan Road from Jandi Primary School Dhakan in V/C Bagan.
   
U/C BEERANGALI
(1) Improvement & Widening of Harran to Dhaka Road.
(2) Improvement & Widening of Dhandian Tupla Road.
(3) Improvement & Widening of Beermi Gali to Banj Via Bandalyi.
 
   
U/C PHALKOT
(1) Improvement & Widening of Kutli to Dagri Road V/C Phalkot-III.
 
  
U/C BAGNOTAR
(1) Improvement & Widening of Chahan Gran Road U/C Bagnotar.
(2) Improvement & Widening of Bandi Maira Road U/C Bagnotar
(3) Improvement & Widening of Gehya to Jhandan U/C Bagnotar.
 
  
U/C SARBANA
(1) Improvement & Widening of Maira Aziz Bang to Shafiq House road.\
(2) Improvement & Widening of Road from Malik Riaz house Khanin Azizbang.
(3) Improvement & Widening of Chatti Seer Gah Road V/C Deesal.  
 
  
U/C KUTHWAL
(1) Improvement & Widening of Road From Rasoolia to Mohallah Pamgarh Road U/C Kuthwal.
(2) Improvement & Widening of Road from Jee Kalsi to Safeer house U/C Kuthwal.  
 
   
1) Rehabilitation / improvement of Changli road.
2) Rehabilitation / improvement of Bela Bridge Dolla Road.
3) Rehabilitation / improvement of Khoi Dhari Sari Bandi Bandi Pahar road.
4) Rehabilitation / improvement of Sathal Sarhan Gali Meeran Road.
5) Rehabilitation / improvement of Hazeera Tarnwai road.
6) Rehabilitation / improvement of Beela Kaloo Bandi.  
 
  
1) Rehabilitation / improvement of Mojhot Bairbagal  leeran and Doga road.
2) Rehabilitation / improvement of Nakhaiter Batar road.
3) Rehabilitation / improvement of Dakhan Sangal road U/C Bakot.
4) Rehabilitation / improvement of Longal Road i/c R/Wall.
 
  
Rehabilitation / improvement of link road village khoyaan.  
 
 
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 451.062 281.208 56 56 56 50.644 331.852 113.854 75% 74%
February - 2018
Length 49 Km (85 units) - work in progress.
No Image
1) Construction of PCC road Mohallah Dar-ul-Khair Malikpura PK-44
2) Construction of road Kuthera road UC Sheikhulbandi PK-44
3) Construction of PCC road Dana UC Kakul PK-44
4) PCC road near Janazagah Dhamtour PK-44
5) Construction of PCC road and sewerage of Chonna Kari PK-44
6) Construction of Kuthera Salol Bandi Doga to Dhaki road Dozer/excavator work (PH basis) PK-45
7) Construction of PCC road from main road Rankote to Primary School Rankote Mohallah Faizabad PK-45
8) Construction of Jabli Hill Sanakar road PK-45
9) Construction of Kalas to Panat road PK-45
10) Improvement/rehabilitation of Beri Bagla to Leeranto Jhallan road and Jhallanto Majhan road PK-45
11) PCC Sangar Seena Dara road PK-45
12) Construction of raod from main road Sufi Razaq Mohra PK-45
13) Reconstruction of Nakar to Riala road Dozer/Excavator work (PH basis) PK-45
14) Construction Nari Dana Banota to Khokarial road Dozer/Excavator work (PH basis) PK-45
15) Improvement PCC Kuthiala Gali to Rich Behn road i/c Flood Protection Wealls UC Kuthiala PK-46
16) Improvement and PCC Mohrian to TarhanaMalkan road UC Balderi PK-46
17) Improvement and PCC Phagal Maira to Khattak Maira road UC Banda Pir Khan PK-46
18) Improvement and PCC Pando Thana to Sargal road i/c Talhar and Siyal UC Pawa PK-46
19) Construction, PCC Kalidhar Auchar road UC Banda Pir Khan PK-46
20) Construction RW at Salhad Barrier to Burag road PK-46
21) Improvement and BT of Barthem Nalothian road 0.70 Km PK-47
22) PCC/widening RW Ghari to Noor Pur UC Lora PK-48
23) PCC/RW Seri to Khoiyan UC Lora PK-48
24) PCC/widening/RW Taror to Pairra UC Seer Sharqi PK-48
25) Rehabilitationof link road from Fawara Chowk to Band Khoo PK-44
26) Construction of PCC Behlolia PK-44
27) Rehabilitation of PCC road/RW at Malach road PK-44
28) PCC road Maira Mandroach to Faqir Bandi PK-44
29) Construction of PCC/sewerage line near House of Haroon Khan PK-44
30) Construction of PCC road near Iqbal KhanHouse Kohati Masjid Kehal PK-44
31) PCC road Mohallah Charri Banda Sanjilian PK-44
32) Construction of PCC road from Beer to Banda Nabi PK-44
33) PCC road Allama Iqbal Town Saddat street road PK-44
34) Construction of PCC road Orash Colony Nawansher PK-44
35) Improvement and rehabilitation of PCC Kali Dahar road PK-46
36) Improvement and rehabilitation of road Banda Khair Ali Khan road PK-46
37) Improvement and rehabilitation of road from Main road Mangal to Basti Akram Khan PK-46
38) Improvement and rehabilitation of road from Mangal Chinar to Banda Pir Khan PK-46
39) Improvement and rehabilitation of road Manu De Ban Dakhli Tarhana PK-46
40) Improvement and rehabilitation of road from Banda Pir Khan to Samalser PK-46
41) Improvement and rehabilitation of road KKH to Morekalan PK-46
42) Improvement and rehabilitation of PCC road from Mangal to Chitta Maira PK-46
43) Improvement and rehabilitation of Banda Amlok road PK-46
44) PCC/widening of Chanala to Noormang road UC Namli Maira PK-48
45) PCC Dheri to Bandi Karpasi road UC Namli Maira PK-48
46) PCC/widening of road from GMS Tharyati UC Namli Maira PK-48
47) PCC/improvement Barra Khaitar road UC Seer Sharqi PK-48
48) PCC road Ropar and Tairan UC Phallah PK-48
49) PCC Bagla raod from House of Master Nazik UC Phallah PK-48
50) PCC Bogri road from Kayani de Gali to Ratti Gali UC Phallah PK-48
51) PCC/improvement of Barmi Gali Jhansa SherranKeri Raiki road UC Nathiagali PK-48
52) PCC/improvement of Hoter Kass to Chatri Khurd road UC Kuthwal PK-48
53) PCC road Mochi Dhara Jaswara UC Nathiagali PK-48
54) PCC road from Qalandarabad to Sajikot UC Baidheri PK-46
55) PCC road from Nika Pani to Rian Da Maira and Pathi Da Maira road PK-46
56) PCC road Sajikot Maira road to village Gojri UC Baldehri PK-46
57) PCC road from GGHS Sajikot to Charian and Haimera road Baldheri PK-46
58) PCC road from Lamba Banda road PK-46
59) PCC road from KKH to Lower Dara Lower Salhad UC Salhad PK-46
60) Rehabilitation of Salhad Naala Bridge near Forest Barrier UC Salhad PK-46
61) RW Dheri Maira road UC Salhad PK-46
62) Construction of Small RCC Bridge at Mohra Naala UC Pawa PK-46
63) New shingle road from Pind Kargo Gali to Barkot UC Pind Kargo PK-46
64) Rehabilitation of 2 Nos Bridge of Bandi Phullan road and Gandhian road PK-46
65) Improvement/widening and pavement of Danna to Panchalla road UC Namli Maira PK-48
66) Improvement/widening of Maira Khurd to Kutli road UC Namli Maira PK-48
67) Improvement/widening/pavement of Delli Monda to Surma Gali road UC Namli Maira PK-48
68) Construction and pavement of Halipad to Narreya road UC Namli Maira PK-48
69) Improvement/pavement of Channal to Upper Maira Kalan road UC Namli Maira PK-48
70) Construction/improvement of road from Charian to Jaster link with Pakhlan UC Namli Maira PK-48
71) Construction of road from Jaster to Kutli via Noor Nala and Bagla UC Namli Maira PK-48
72) Improvement/rehabilitation of road village Dobather Katha Seri UC Jhangi PK-48
73) Improvement/rehabilitation of road from Shimla Hill to Dehri to Khorrian road PK-48
74) Construction/rehabilitation of road from GGHS Aziz Bang to Maira Aziz Bang (4 Km)Pk-48
75) Improvement/rehabilitation/upgradation/construction of Namli Maira road (15.05 Km) PK-48
76) Feasibility/design/supervision/construction/improvement/rehabilitation/upgradation of Main Namli Maira road (15.05 Km)
77) Feasibility/design/construction of Beerangali raods (15 Km) PK-48
78) Jaffar Dakh Doga (1 Km) PK-48
79) Jaffar Pehlwan road (1 Km) PK-48
80) Sarbanna Beerangali road (2 Km) PK-48
81) Keri rod (1.5 Km) Pk-48
82) SHU to Kharther road (1.5 Km) PK-48
83) Beerangali Burj UC Laik road to Jogimar (5 Km) PK-48
84) Jandar Bari road (1 Km) PK-48
85) Akhreela under Seri road (2 Km) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
February - 2021
16 Units - Work order issued.
No Image
U/C MAJHUAN / NARA
(1) Improvement & Widening of Upper Goal to Lower Goal (Haji Pervaiz House To Haji Rozi khan House).
(2) Improvement & Widening of Link Road from Bodla Bazaar to Mohallah Morri.
(3) Improvement & Widening of Link Road in V/C-I Majohan Saniala and Bandi To Sandakki.
(4) Improvement & Widening of Link Road Manhoni To Nara via Dhamnaka.
   
U/C NATHAIAGALI
(1) Improvement & Widening of Mochi Dara Road Bhek Road.
(2) Improvement & Widening of Road from Primary School Kehtar via Shani Barh to
Arif House in V/C Bagan Khetar.
(3) Improvement & Widening of Bagan Dakhan Road from Jandi Primary School Dhakan in V/C Bagan.
   
U/C BEERANGALI
(1) Improvement & Widening of Harran to Dhaka Road.
(2) Improvement & Widening of Dhandian Tupla Road.
(3) Improvement & Widening of Beermi Gali to Banj Via Bandalyi.
 
   
U/C PHALKOT
(1) Improvement & Widening of Kutli to Dagri Road V/C Phalkot-III.
 
  
U/C BAGNOTAR
(1) Improvement & Widening of Chahan Gran Road U/C Bagnotar.
(2) Improvement & Widening of Bandi Maira Road U/C Bagnotar
(3) Improvement & Widening of Gehya to Jhandan U/C Bagnotar.
 
  
U/C SARBANA
(1) Improvement & Widening of Maira Aziz Bang to Shafiq House road.\
(2) Improvement & Widening of Road from Malik Riaz house Khanin Azizbang.
(3) Improvement & Widening of Chatti Seer Gah Road V/C Deesal.  
 
  
U/C KUTHWAL
(1) Improvement & Widening of Road From Rasoolia to Mohallah Pamgarh Road U/C Kuthwal.
(2) Improvement & Widening of Road from Jee Kalsi to Safeer house U/C Kuthwal.  
 
   
1) Rehabilitation / improvement of Changli road.
2) Rehabilitation / improvement of Bela Bridge Dolla Road.
3) Rehabilitation / improvement of Khoi Dhari Sari Bandi Bandi Pahar road.
4) Rehabilitation / improvement of Sathal Sarhan Gali Meeran Road.
5) Rehabilitation / improvement of Hazeera Tarnwai road.
6) Rehabilitation / improvement of Beela Kaloo Bandi.  
 
  
1) Rehabilitation / improvement of Mojhot Bairbagal  leeran and Doga road.
2) Rehabilitation / improvement of Nakhaiter Batar road.
3) Rehabilitation / improvement of Dakhan Sangal road U/C Bakot.
4) Rehabilitation / improvement of Longal Road i/c R/Wall.
 
  
Rehabilitation / improvement of link road village khoyaan.  
 
 
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 451.062 281.208 0 30 30 26 307.208 169.854 - 68%
January - 2018
Length 49 Km (80 units) - work in progress.
No Image
1) PK-44 2) PK-45 3) PK-46 4) PK-47 5) PK-48
1303
(OG)
190448-Regional Development Initiatives for achieving SDGs (inclusive liabilties under SPDI, PP & DDIs).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 15.5 0 0 0 0 0 0 15.5 - -
January - 2021
16 Units - Work order issued.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
28-11-14 - - 19-01-16 - 75 80.119 1 1 1 1 81.119 0 100% 100%
December - 2017
Completed (8.5 Km).
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
28-11-14 - - 19-01-16 - 75 80.119 0 0 0 0 80.119 0 - 100%
September - 2017
Completed.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
28-11-14 - - 19-01-16 - 75 80.119 0 0 0 0 80.119 0 - 100%
August - 2017
Completed.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
28-11-14 - - 19-01-16 - 75 80.119 0 0 0 0 80.119 0 - 100%
July - 2017
Completed.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.119 1 1 1 1 81.119 0 100% 100%
November - 2017
Completed. Length 8.5 km)
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.119 1 1 1 1 81.119 0 100% 100%
October - 2017
Completed.
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.11 1 1 1 1 81.11 0 100% 100%
June - 2018
Completed (8.5 Km).
No Image
1) Improvement/rehabilitation/upgradation from Surani road to Haibak Jan PK-70
2) Umerzai Serki Khel road Km-8, 9 and 10 PK-71
3) Road from Domel to Jangi Killa Zeraki Priba Khel PK-71
4) Road from Marwat Canal road to Gul Baz Khen PK-72
5) Construction of BT road from Bannu Miranshah road to Mir Kalam Koroona Phase-1 PK-72
6) BT road from Spin Filling Station to Gul Badin Sardi Khel PK-72
7) From Kakki road to Bada Mir Abas PK-73
8) Road from Bannu to Kakki road to Bharat PK-73
9) Road from DI.Khan road Nar Jaffar Main road PK-73
10) BT road from Bannu Commerce College to Village Dabak Said Khel PK-73
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.11 1 1 1 1 81.11 0 100% 100%
May - 2018
Completed (8.5 Km).
No Image
1) Improvement/rehabilitation/upgradation from Surani road to Haibak Jan PK-70
2) Umerzai Serki Khel road Km-8, 9 and 10 PK-71
3) Road from Domel to Jangi Killa Zeraki Priba Khel PK-71
4) Road from Marwat Canal road to Gul Baz Khen PK-72
5) Construction of BT road from Bannu Miranshah road to Mir Kalam Koroona Phase-1 PK-72
6) BT road from Spin Filling Station to Gul Badin Sardi Khel PK-72
7) From Kakki road to Bada Mir Abas PK-73
8) Road from Bannu to Kakki road to Bharat PK-73
9) Road from DI.Khan road Nar Jaffar Main road PK-73
10) BT road from Bannu Commerce College to Village Dabak Said Khel PK-73
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.11 1 1 1 1 81.11 0 100% 100%
April - 2018
Completed (8.5 Km).
No Image
1) Improvement/rehabilitation/upgradation from Surani road to Haibak Jan PK-70
2) Umerzai Serki Khel road Km-8, 9 and 10 PK-71
3) Road from Domel to Jangi Killa Zeraki Priba Khel PK-71
4) Road from Marwat Canal road to Gul Baz Khen PK-72
5) Construction of BT road from Bannu Miranshah road to Mir Kalam Koroona Phase-1 PK-72
6) BT road from Spin Filling Station to Gul Badin Sardi Khel PK-72
7) From Kakki road to Bada Mir Abas PK-73
8) Road from Bannu to Kakki road to Bharat PK-73
9) Road from DI.Khan road Nar Jaffar Main road PK-73
10) BT road from Bannu Commerce College to Village Dabak Said Khel PK-73
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.11 1 1 1 1 81.11 0 100% 100%
March - 2018
Completed (8.5 Km).
No Image
1) Improvement/rehabilitation/upgradation from Surani road to Haibak Jan PK-70
2) Umerzai Serki Khel road Km-8, 9 and 10 PK-71
3) Road from Domel to Jangi Killa Zeraki Priba Khel PK-71
4) Road from Marwat Canal road to Gul Baz Khen PK-72
5) Construction of BT road from Bannu Miranshah road to Mir Kalam Koroona Phase-1 PK-72
6) BT road from Spin Filling Station to Gul Badin Sardi Khel PK-72
7) From Kakki road to Bada Mir Abas PK-73
8) Road from Bannu to Kakki road to Bharat PK-73
9) Road from DI.Khan road Nar Jaffar Main road PK-73
10) BT road from Bannu Commerce College to Village Dabak Said Khel PK-73
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.11 1 1 1 1 81.11 0 100% 100%
February - 2018
Completed (8.5 Km).
No Image
1) Improvement/rehabilitation/upgradation from Surani road to Haibak Jan PK-70
2) Umerzai Serki Khel road Km-8, 9 and 10 PK-71
3) Road from Domel to Jangi Killa Zeraki Priba Khel PK-71
4) Road from Marwat Canal road to Gul Baz Khen PK-72
5) Construction of BT road from Bannu Miranshah road to Mir Kalam Koroona Phase-1 PK-72
6) BT road from Spin Filling Station to Gul Badin Sardi Khel PK-72
7) From Kakki road to Bada Mir Abas PK-73
8) Road from Bannu to Kakki road to Bharat PK-73
9) Road from DI.Khan road Nar Jaffar Main road PK-73
10) BT road from Bannu Commerce College to Village Dabak Said Khel PK-73
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 75 80.119 1 1 1 1 81.119 0 100% 100%
January - 2018
Completed (8.5 Km).
No Image
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
01-12-14 - - 19-01-16 - 20 21 0 0 0 0 21 0 - 100%
December - 2017
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads)
2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
01-12-14 - - 19-01-16 - 20 21 0 0 0 0 21 0 - 100%
September - 2017
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads)
2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
01-12-14 - - 19-01-16 - 20 21 0 0 0 0 21 0 - 100%
August - 2017
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads)
2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
01-12-14 - - 19-01-16 - 20 21 0 0 0 0 21 0 - 100%
July - 2017
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads)
2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 21 0 0 0 0 21 0 - 100%
November - 2017
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads)
2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 21 0 0 0 0 21 0 - 100%
October - 2017
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads)
2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 18.624 0.4 0.4 0.4 0.4 19.024 0.976 95% 95%
June - 2018
Completed.
No Image
1) Huthel Narra, Gatsar Malkal road UC Thakot PK-59
2) Paimal road to Banda Shah zada Serai PK-59
3) Ajmera Kharari and Palango roads UC Ajmera PK-59
4) Jabri Phagora UC Rajdahari and Dagai road PK-59
5) Kotwal toSaidra Biland Kot road UC Kuza Banda PK-59
6) Tangi Ikhtiar Malook road UC Banian
7) Khushal Abad Qalla road UC Battagram
8) Banna to Damtay Koshgram road UC Banna
9) Kandow to Laghari raod UC Sakargah
10) Paiza Bajar road UC Jambera
11) Pashtoto Geray road UC Pashto
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 18.624 0.4 0.4 0.4 0.4 19.024 0.976 95% 95%
May - 2018
Completed.
No Image
1) Huthel Narra, Gatsar Malkal road UC Thakot PK-59
2) Paimal road to Banda Shah zada Serai PK-59
3) Ajmera Kharari and Palango roads UC Ajmera PK-59
4) Jabri Phagora UC Rajdahari and Dagai road PK-59
5) Kotwal toSaidra Biland Kot road UC Kuza Banda PK-59
6) Tangi Ikhtiar Malook road UC Banian
7) Khushal Abad Qalla road UC Battagram
8) Banna to Damtay Koshgram road UC Banna
9) Kandow to Laghari raod UC Sakargah
10) Paiza Bajar road UC Jambera
11) Pashtoto Geray road UC Pashto
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 18.624 0.4 0.4 0.4 0.4 19.024 0.976 95% 95%
April - 2018
Completed.
No Image
1) Huthel Narra, Gatsar Malkal road UC Thakot PK-59
2) Paimal road to Banda Shah zada Serai PK-59
3) Ajmera Kharari and Palango roads UC Ajmera PK-59
4) Jabri Phagora UC Rajdahari and Dagai road PK-59
5) Kotwal toSaidra Biland Kot road UC Kuza Banda PK-59
6) Tangi Ikhtiar Malook road UC Banian
7) Khushal Abad Qalla road UC Battagram
8) Banna to Damtay Koshgram road UC Banna
9) Kandow to Laghari raod UC Sakargah
10) Paiza Bajar road UC Jambera
11) Pashtoto Geray road UC Pashto
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 18.624 0.4 0.4 0.4 0.4 19.024 0.976 95% 95%
March - 2018
Completed.
No Image
1) Huthel Narra, Gatsar Malkal road UC Thakot PK-59
2) Paimal road to Banda Shah zada Serai PK-59
3) Ajmera Kharari and Palango roads UC Ajmera PK-59
4) Jabri Phagora UC Rajdahari and Dagai road PK-59
5) Kotwal toSaidra Biland Kot road UC Kuza Banda PK-59
6) Tangi Ikhtiar Malook road UC Banian
7) Khushal Abad Qalla road UC Battagram
8) Banna to Damtay Koshgram road UC Banna
9) Kandow to Laghari raod UC Sakargah
10) Paiza Bajar road UC Jambera
11) Pashtoto Geray road UC Pashto
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 18.624 0.4 0.4 0.4 0 18.624 0.976 95% 93%
February - 2018
Completed.
No Image
1) Huthel Narra, Gatsar Malkal road UC Thakot PK-59
2) Paimal road to Banda Shah zada Serai PK-59
3) Ajmera Kharari and Palango roads UC Ajmera PK-59
4) Jabri Phagora UC Rajdahari and Dagai road PK-59
5) Kotwal toSaidra Biland Kot road UC Kuza Banda PK-59
6) Tangi Ikhtiar Malook road UC Banian
7) Khushal Abad Qalla road UC Battagram
8) Banna to Damtay Koshgram road UC Banna
9) Kandow to Laghari raod UC Sakargah
10) Paiza Bajar road UC Jambera
11) Pashtoto Geray road UC Pashto
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 21 0.4 0.4 0.4 0 21 0 100% 100%
January - 2018
Completed.
No Image
1) Tehsil Battagram PK-59 (7 Roads) 2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Buner
29-09-14 - - 19-01-16 - 61.9 59.731 9 0 0 0 59.731 0 100% 96%
December - 2017
7 Km - 6 Km completed.
No Image
PK-77 (Rs.10 m), PK-78 (Rs.41.900 m), PK-79 (Rs.10 m)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Buner
- - - 19-01-16 - 61.9 59.731 9 9 9 0 59.731 0 100% 96%
September - 2017
7 Km - 6 Km completed.
No Image
PK-77 (Rs.10 m), PK-78 (Rs.41.900 m), PK-79 (Rs.10 m)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Buner
- - - 19-01-16 - 61.9 59.731 9 9 9 0 59.731 0 100% 96%
August - 2017
7 Km - 6 Km completed.
No Image
PK-77 (Rs.10 m), PK-78 (Rs.41.900 m), PK-79 (Rs.10 m)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Buner
- - - 19-01-16 - 61.9 59.731 9 9 9 0 59.731 0 100% 96%
July - 2017
7 Km - 6 Km completed.
No Image
PK-77 (Rs.10 m), PK-78 (Rs.41.900 m), PK-79 (Rs.10 m)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Buner
30-11--1 30-11--1 - 30-11--1 - 61.9 59.731 9 0 0 0 59.731 0 100% 96%
November - 2017
7 Km - 6 Km completed.
No Image
PK-77 (Rs.10 m), PK-78 (Rs.41.900 m), PK-79 (Rs.10 m)
Pages : 1 2 3 4 5 6 7 8