Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2018, January - 2021, February - 2018, February - 2021, March - 2018, March - 2021, April - 2018, April - 2021, May - 2018, May - 2021, June - 2018, July - 2017, July - 2020, August - 2017, August - 2020, September - 2017, September - 2020, October - 2017, October - 2020, November - 2017, December - 2017, December - 2020,

Showing Page Number : 1 of 1

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
18-08-14 - - 15-09-17 - 300 81.886 50 80 55 32.935 114.821 168.114 44% 38%
December - 2017
Earth work, sub base in progress.
No Image
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
18-08-14 - - 03-11-16 - 150 81.886 50 50 25 0.867 82.753 18.114 88% 55%
September - 2017
Earth work, sub base in progress. Revised PC-I/DCE for Rs.300 m submitted to P&D. Approved, AA under process.
No Image
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
18-08-14 - - 03-11-16 - 150 81.886 50 50 17.75 0.867 82.753 18.114 88% 55%
August - 2017
Earth work, sub base in progress. Revised PC-I/DCE for Rs.300 m submitted to P&D
No Image
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
18-08-14 - - 03-11-16 - 150 81.886 50 50 17.75 0 81.886 18.114 88% 55%
July - 2017
Earth work, sub base in progress. Revised PC-I/DCE for Rs.300 m submitted to SOR on 19/07/2017.
No Image
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 150 81.886 50 50 25 24.337 106.223 18.114 88% 71%
November - 2017
Earth work, sub base in progress. Revised PC-I/DCE for Rs.300 m submitted to P&D. Approved. AA awaited.
No Image
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 150 81.886 50 50 25 19.407 101.293 18.114 88% 68%
October - 2017
Earth work, sub base in progress. Revised PC-I/DCE for Rs.300 m submitted to P&D. Approved. AA awaited.
No Image
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 300 111.886 50 128.683 128.683 128.682 240.568 138.114 54% 80%
June - 2018
48 units (PCC/BT) - earth work, sub base in progress.
No Image
1) Pavement of road/street at village Gheba
2) Construction of road at Shah Maqsood
3) Construction of road/street at Thanda Choa UC Shah Maqsood
4) Pavement of road/streets a village Kholian Kalawan Mohara
5) Construction of road Shah Maqsood Maira to Bandi Sher Khan road UC Shah Maqsood
6) Pavement of road/street at village Akhoon Bandi and Mohallah Toheed Abad
7) Pavement of road/street at village Nikah Pah
8) Pavement of street at village Mohari No.1 UC Shah Maqsood
9) Pavement of road N/H of Master Ashiq Lora Chowk
10) Pavement of roads/street at village Mohari No.2 UC Shah Maqsood
11) Construction of road from Batkh to Mohalla Jalsi
12) Construction of road Soka Changi Bandi UC Sarai Saleh
13) Construction ofroad Saida Abad Sarai Saleh
14) Pavement of street at Mohallah Lehanda
15) Construction of raod at Ghar
16) Pavement of street at Mohallah Gul Bahaar Colony Jandran and Khan Bahadar UC Serai Saleh
17) Pavement of street at Tatreela Ghar
18) Pavement of road/street at Sarai Saleh Maira UC Serai Saleh
19) Pavement of roads/street at Sameer Ayub Colony Sarai Saleh UC Sarai Saleh
20) Construction of road/streets at village Moonan
21) Construction of road/street at village Mohara and Faisal Colony
22) Construction of road/street at Manzoor Colony Nai Abadi and Yasir Colony UC Ali Khan
23) Construction of road/street at Soka Nazir Abad and Maira Ali Khan UC Ali Khan
24) Construction of road/strets at village Muradabad UC Ali Khan
25) Construction of road/street at village Shah Muhammad and Mohallah Tanki UC Ali Khan
26) Construction of road/street at village Kahal UC Ali Khan
27) Construction of main road Pandak
28) Construction of Mairan Ali Khan road
29) Construction of bridge at Pandak Soka UC Pandak
30) Construction of road/streets at Talokar Dheri UC Pandak
31) Construction of road/streets at Gher Khan Maira
32) Construction of road/street at Soka Pandak UC Pandak
33) Pavement of roads/street village Durrnaian and Jamia
34) Pavement of roads/sreet village Nurdi Mohallah Shamali Mohara
35) Pavement fo roads/streets at Mohallah Dharri UC Rehana
36) Pavement of raod/street Kotha Pir Kot
37) Pavement of roads/street at Dolni
38) Pavement of road/street at village Chapra and Pir Kot Maira
39) Pavement of road/street at village Pind Jamal Khan and Kamal Pur
40) Construction of Maira Pandak road
41) Pavement of road/street at village Rehana Pinda Choi UC Rehana
42) Pavement of roads/streets at Mohallah Chitri and Kanat
43) Construction of road a GY Zareen House
44) Pavement of roads/steets at village Koaka Dinga
45) Pavement of road/street at Pind Hashim Khan
46) Construction of road/street at Mohallah Munsafabad
47) Construction of Serai Saleh Maira road
48) Construction of Tanki Ali Khan
49) Construction of road/street at Mirpur UC Pandak
50) Construction of road/steet at Soka Pandak
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 300 111.886 50 128.683 128.683 128.682 240.568 138.114 54% 80%
May - 2018
48 units (PCC/BT) - earth work, sub base in progress.
No Image
1) Pavement of road/street at village Gheba
2) Construction of road at Shah Maqsood
3) Construction of road/street at Thanda Choa UC Shah Maqsood
4) Pavement of road/streets a village Kholian Kalawan Mohara
5) Construction of road Shah Maqsood Maira to Bandi Sher Khan road UC Shah Maqsood
6) Pavement of road/street at village Akhoon Bandi and Mohallah Toheed Abad
7) Pavement of road/street at village Nikah Pah
8) Pavement of street at village Mohari No.1 UC Shah Maqsood
9) Pavement of road N/H of Master Ashiq Lora Chowk
10) Pavement of roads/street at village Mohari No.2 UC Shah Maqsood
11) Construction of road from Batkh to Mohalla Jalsi
12) Construction of road Soka Changi Bandi UC Sarai Saleh
13) Construction ofroad Saida Abad Sarai Saleh
14) Pavement of street at Mohallah Lehanda
15) Construction of raod at Ghar
16) Pavement of street at Mohallah Gul Bahaar Colony Jandran and Khan Bahadar UC Serai Saleh
17) Pavement of street at Tatreela Ghar
18) Pavement of road/street at Sarai Saleh Maira UC Serai Saleh
19) Pavement of roads/street at Sameer Ayub Colony Sarai Saleh UC Sarai Saleh
20) Construction of road/streets at village Moonan
21) Construction of road/street at village Mohara and Faisal Colony
22) Construction of road/street at Manzoor Colony Nai Abadi and Yasir Colony UC Ali Khan
23) Construction of road/street at Soka Nazir Abad and Maira Ali Khan UC Ali Khan
24) Construction of road/strets at village Muradabad UC Ali Khan
25) Construction of road/street at village Shah Muhammad and Mohallah Tanki UC Ali Khan
26) Construction of road/street at village Kahal UC Ali Khan
27) Construction of main road Pandak
28) Construction of Mairan Ali Khan road
29) Construction of bridge at Pandak Soka UC Pandak
30) Construction of road/streets at Talokar Dheri UC Pandak
31) Construction of road/streets at Gher Khan Maira
32) Construction of road/street at Soka Pandak UC Pandak
33) Pavement of roads/street village Durrnaian and Jamia
34) Pavement of roads/sreet village Nurdi Mohallah Shamali Mohara
35) Pavement fo roads/streets at Mohallah Dharri UC Rehana
36) Pavement of raod/street Kotha Pir Kot
37) Pavement of roads/street at Dolni
38) Pavement of road/street at village Chapra and Pir Kot Maira
39) Pavement of road/street at village Pind Jamal Khan and Kamal Pur
40) Construction of Maira Pandak road
41) Pavement of road/street at village Rehana Pinda Choi UC Rehana
42) Pavement of roads/streets at Mohallah Chitri and Kanat
43) Construction of road a GY Zareen House
44) Pavement of roads/steets at village Koaka Dinga
45) Pavement of road/street at Pind Hashim Khan
46) Construction of road/street at Mohallah Munsafabad
47) Construction of Serai Saleh Maira road
48) Construction of Tanki Ali Khan
49) Construction of road/street at Mirpur UC Pandak
50) Construction of road/steet at Soka Pandak
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 300 111.886 50 128.683 128.683 120.717 232.603 138.114 54% 78%
April - 2018
48 units (PCC/BT) - earth work, sub base in progress.
No Image
1) Pavement of road/street at village Gheba
2) Construction of road at Shah Maqsood
3) Construction of road/street at Thanda Choa UC Shah Maqsood
4) Pavement of road/streets a village Kholian Kalawan Mohara
5) Construction of road Shah Maqsood Maira to Bandi Sher Khan road UC Shah Maqsood
6) Pavement of road/street at village Akhoon Bandi and Mohallah Toheed Abad
7) Pavement of road/street at village Nikah Pah
8) Pavement of street at village Mohari No.1 UC Shah Maqsood
9) Pavement of road N/H of Master Ashiq Lora Chowk
10) Pavement of roads/street at village Mohari No.2 UC Shah Maqsood
11) Construction of road from Batkh to Mohalla Jalsi
12) Construction of road Soka Changi Bandi UC Sarai Saleh
13) Construction ofroad Saida Abad Sarai Saleh
14) Pavement of street at Mohallah Lehanda
15) Construction of raod at Ghar
16) Pavement of street at Mohallah Gul Bahaar Colony Jandran and Khan Bahadar UC Serai Saleh
17) Pavement of street at Tatreela Ghar
18) Pavement of road/street at Sarai Saleh Maira UC Serai Saleh
19) Pavement of roads/street at Sameer Ayub Colony Sarai Saleh UC Sarai Saleh
20) Construction of road/streets at village Moonan
21) Construction of road/street at village Mohara and Faisal Colony
22) Construction of road/street at Manzoor Colony Nai Abadi and Yasir Colony UC Ali Khan
23) Construction of road/street at Soka Nazir Abad and Maira Ali Khan UC Ali Khan
24) Construction of road/strets at village Muradabad UC Ali Khan
25) Construction of road/street at village Shah Muhammad and Mohallah Tanki UC Ali Khan
26) Construction of road/street at village Kahal UC Ali Khan
27) Construction of main road Pandak
28) Construction of Mairan Ali Khan road
29) Construction of bridge at Pandak Soka UC Pandak
30) Construction of road/streets at Talokar Dheri UC Pandak
31) Construction of road/streets at Gher Khan Maira
32) Construction of road/street at Soka Pandak UC Pandak
33) Pavement of roads/street village Durrnaian and Jamia
34) Pavement of roads/sreet village Nurdi Mohallah Shamali Mohara
35) Pavement fo roads/streets at Mohallah Dharri UC Rehana
36) Pavement of raod/street Kotha Pir Kot
37) Pavement of roads/street at Dolni
38) Pavement of road/street at village Chapra and Pir Kot Maira
39) Pavement of road/street at village Pind Jamal Khan and Kamal Pur
40) Construction of Maira Pandak road
41) Pavement of road/street at village Rehana Pinda Choi UC Rehana
42) Pavement of roads/streets at Mohallah Chitri and Kanat
43) Construction of road a GY Zareen House
44) Pavement of roads/steets at village Koaka Dinga
45) Pavement of road/street at Pind Hashim Khan
46) Construction of road/street at Mohallah Munsafabad
47) Construction of Serai Saleh Maira road
48) Construction of Tanki Ali Khan
49) Construction of road/street at Mirpur UC Pandak
50) Construction of road/steet at Soka Pandak
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 300 111.886 50 128.683 128.683 107.218 219.104 138.114 54% 73%
March - 2018
48 units (PCC/BT) - earth work, sub base in progress.
No Image
1) Pavement of road/street at village Gheba
2) Construction of road at Shah Maqsood
3) Construction of road/street at Thanda Choa UC Shah Maqsood
4) Pavement of road/streets a village Kholian Kalawan Mohara
5) Construction of road Shah Maqsood Maira to Bandi Sher Khan road UC Shah Maqsood
6) Pavement of road/street at village Akhoon Bandi and Mohallah Toheed Abad
7) Pavement of road/street at village Nikah Pah
8) Pavement of street at village Mohari No.1 UC Shah Maqsood
9) Pavement of road N/H of Master Ashiq Lora Chowk
10) Pavement of roads/street at village Mohari No.2 UC Shah Maqsood
11) Construction of road from Batkh to Mohalla Jalsi
12) Construction of road Soka Changi Bandi UC Sarai Saleh
13) Construction ofroad Saida Abad Sarai Saleh
14) Pavement of street at Mohallah Lehanda
15) Construction of raod at Ghar
16) Pavement of street at Mohallah Gul Bahaar Colony Jandran and Khan Bahadar UC Serai Saleh
17) Pavement of street at Tatreela Ghar
18) Pavement of road/street at Sarai Saleh Maira UC Serai Saleh
19) Pavement of roads/street at Sameer Ayub Colony Sarai Saleh UC Sarai Saleh
20) Construction of road/streets at village Moonan
21) Construction of road/street at village Mohara and Faisal Colony
22) Construction of road/street at Manzoor Colony Nai Abadi and Yasir Colony UC Ali Khan
23) Construction of road/street at Soka Nazir Abad and Maira Ali Khan UC Ali Khan
24) Construction of road/strets at village Muradabad UC Ali Khan
25) Construction of road/street at village Shah Muhammad and Mohallah Tanki UC Ali Khan
26) Construction of road/street at village Kahal UC Ali Khan
27) Construction of main road Pandak
28) Construction of Mairan Ali Khan road
29) Construction of bridge at Pandak Soka UC Pandak
30) Construction of road/streets at Talokar Dheri UC Pandak
31) Construction of road/streets at Gher Khan Maira
32) Construction of road/street at Soka Pandak UC Pandak
33) Pavement of roads/street village Durrnaian and Jamia
34) Pavement of roads/sreet village Nurdi Mohallah Shamali Mohara
35) Pavement fo roads/streets at Mohallah Dharri UC Rehana
36) Pavement of raod/street Kotha Pir Kot
37) Pavement of roads/street at Dolni
38) Pavement of road/street at village Chapra and Pir Kot Maira
39) Pavement of road/street at village Pind Jamal Khan and Kamal Pur
40) Construction of Maira Pandak road
41) Pavement of road/street at village Rehana Pinda Choi UC Rehana
42) Pavement of roads/streets at Mohallah Chitri and Kanat
43) Construction of road a GY Zareen House
44) Pavement of roads/steets at village Koaka Dinga
45) Pavement of road/street at Pind Hashim Khan
46) Construction of road/street at Mohallah Munsafabad
47) Construction of Serai Saleh Maira road
48) Construction of Tanki Ali Khan
49) Construction of road/street at Mirpur UC Pandak
50) Construction of road/steet at Soka Pandak
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 300 111.886 50 122.683 122.683 76.67 188.556 138.114 54% 63%
February - 2018
48 units (PCC /BT) Earth work, sub base in progress.
No Image
1) Pavement of road/street at village Gheba
2) Construction of road at Shah Maqsood
3) Construction of road/street at Thanda Choa UC Shah Maqsood
4) Pavement of road/streets a village Kholian Kalawan Mohara
5) Construction of road Shah Maqsood Maira to Bandi Sher Khan road UC Shah Maqsood
6) Pavement of road/street at village Akhoon Bandi and Mohallah Toheed Abad
7) Pavement of road/street at village Nikah Pah
8) Pavement of street at village Mohari No.1 UC Shah Maqsood
9) Pavement of road N/H of Master Ashiq Lora Chowk
10) Pavement of roads/street at village Mohari No.2 UC Shah Maqsood
11) Construction of road from Batkh to Mohalla Jalsi
12) Construction of road Soka Changi Bandi UC Sarai Saleh
13) Construction ofroad Saida Abad Sarai Saleh
14) Pavement of street at Mohallah Lehanda
15) Construction of raod at Ghar
16) Pavement of street at Mohallah Gul Bahaar Colony Jandran and Khan Bahadar UC Serai Saleh
17) Pavement of street at Tatreela Ghar
18) Pavement of road/street at Sarai Saleh Maira UC Serai Saleh
19) Pavement of roads/street at Sameer Ayub Colony Sarai Saleh UC Sarai Saleh
20) Construction of road/streets at village Moonan
21) Construction of road/street at village Mohara and Faisal Colony
22) Construction of road/street at Manzoor Colony Nai Abadi and Yasir Colony UC Ali Khan
23) Construction of road/street at Soka Nazir Abad and Maira Ali Khan UC Ali Khan
24) Construction of road/strets at village Muradabad UC Ali Khan
25) Construction of road/street at village Shah Muhammad and Mohallah Tanki UC Ali Khan
26) Construction of road/street at village Kahal UC Ali Khan
27) Construction of main road Pandak
28) Construction of Mairan Ali Khan road
29) Construction of bridge at Pandak Soka UC Pandak
30) Construction of road/streets at Talokar Dheri UC Pandak
31) Construction of road/streets at Gher Khan Maira
32) Construction of road/street at Soka Pandak UC Pandak
33) Pavement of roads/street village Durrnaian and Jamia
34) Pavement of roads/sreet village Nurdi Mohallah Shamali Mohara
35) Pavement fo roads/streets at Mohallah Dharri UC Rehana
36) Pavement of raod/street Kotha Pir Kot
37) Pavement of roads/street at Dolni
38) Pavement of road/street at village Chapra and Pir Kot Maira
39) Pavement of road/street at village Pind Jamal Khan and Kamal Pur
40) Construction of Maira Pandak road
41) Pavement of road/street at village Rehana Pinda Choi UC Rehana
42) Pavement of roads/streets at Mohallah Chitri and Kanat
43) Construction of road a GY Zareen House
44) Pavement of roads/steets at village Koaka Dinga
45) Pavement of road/street at Pind Hashim Khan
46) Construction of road/street at Mohallah Munsafabad
47) Construction of Serai Saleh Maira road
48) Construction of Tanki Ali Khan
49) Construction of road/street at Mirpur UC Pandak
50) Construction of road/steet at Soka Pandak
1218
(OG)
150889-Pavement of roads and streets for UC Saray Saleh, Shah Maqsood, Rehana, Ali Khan, Darwesh, Pind Hasim Khan, UC Sourth and Pandak of District Haripur.
Haripur
30-11--1 30-11--1 - 30-11--1 - 300 81.886 50 122.683 122.683 55 136.886 168.114 44% 46%
January - 2018
Earth work, sub base in progress.
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
December - 2020
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
December - 2020
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
October - 2020
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
September - 2020
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
August - 2020
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0 0 0 0 0 -
July - 2020
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
May - 2021
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
April - 2021
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
March - 2021
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
February - 2021
No Image
1218
(New)
190400-Strengthening / Capacity Building of Local Government Insitutions (2% share of Local Government).
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 720 0 0.001 0.001 0 0 0 0 - -
January - 2021
No Image