Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
23-05-16 | - | - | 15-09-17 | - | 219.66 | 80.25 | 50 | 58.75 | 46.25 | 46.25 | 126.5 | 89.41 | 59% |
58% December - 2017 |
Length 20 Km - out of 16 units, all in progress. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
23-05-16 | - | - | 29-12-15 | - | 220 | 80.25 | 50 | 50 | 17.75 | 17.75 | 98 | 89.75 | 59% |
45% September - 2017 |
Length 20 Km - out of 16 units, all in progress. Revised PC-I/DCE for Rs.220 m submitted to P&D. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
23-05-16 | - | - | 29-12-15 | - | 220 | 80.25 | 50 | 50 | 17.75 | 17.75 | 98 | 89.75 | 59% |
45% August - 2017 |
Length 20 Km - out of 16 units, all in progress. Revised PC-I/DCE for Rs.220 m submitted to P&D. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
23-05-16 | - | - | 29-12-15 | - | 220 | 80.25 | 50 | 50 | 17.75 | 0 | 80.25 | 89.75 | 59% |
36% July - 2017 |
Length 20 Km - out of 16 units, all in progress. Revised PC-I/DCE for Rs.220 m submitted to P&D. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 58.75 | 46.25 | 40.168 | 120.418 | 89.41 | 59% |
55% November - 2017 |
Length 20 Km - out of 16 units, all in progress. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 50 | 27.75 | 24.303 | 104.553 | 89.41 | 59% |
48% October - 2017 |
Length 20 Km - out of 16 units, all in progress. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 67.679 | 67.679 | 67.679 | 147.929 | 89.41 | 59% |
67% June - 2018 |
Length 20 Km - all 22 units, all in progress. |
No Image |
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 67.842 | 67.842 | 67.679 | 147.929 | 89.41 | 59% |
67% May - 2018 |
Length 20 Km - all 22 units, all in progress. |
No Image |
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 67.842 | 67.842 | 67.679 | 147.929 | 89.41 | 59% |
67% April - 2018 |
Length 20 Km - all 22 units, all in progress. |
No Image |
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 67.842 | 67.842 | 58.04 | 138.29 | 89.41 | 59% |
63% March - 2018 |
Length 20 Km - all 22 units, all in progress. |
No Image |
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 65.152 | 65.152 | 58.04 | 138.29 | 89.41 | 59% |
63% February - 2018 |
Length 20 Km - all 22 units, all in progress. |
No Image |
1) Construction of road from near Modern Public School (1 Km) PK-44
2) Sir Syed Colony road Street No.8 and 9 (0.550 mtr) PK-44
3) Shahzada Masjid to Banda Sinjilan (2 Km) PK-44
4) Karbala Chowk Kehal to Usmania Masjid (1 Km) PK-44
5) Narduba road (1 Km) PK-44
6) Banni to Maira Mandroach road (1 Km) PK-44
7) Township Basali road (dozer work) (1 Km) PK-44
8) Lambi Dehri to Banda Dilazak road (1 Km) PK-44
9) Sheikhulbandi road (1 Km) PK-44
10) Gojre Maira road (1 Km) PK-44
11) Hassa Zai Mansoor road Orash Colony road (1 Km) PK-44
12) Main link road Pul to Masjid Narriyan (1 Km) PK-44
13) Kunj Mirpur road (0.650 mtr) PK-44
14) Sarban Kothera road (3.25 Km) PK-44
15) Kala Pul Chona road (2.25 Km) PK-44
16) Main line road Dhamtor (1 Km) PK-44
17) PCC with sewerage line Oresh Colony road PK-44
18) PCC road sewerage line Jogan PK-44
19) PCC road sewerage line Dhodial PK-44
20) Construction of Comsat University road PK-44
21) Construction of sewerage line Kehal Ward-10 to 15 road PK-44
22) PCC with sewerage line from Kehal Chowk to Qabristan PK-44 | |||||||||||||||||||
1195 (OG) |
140981-Construction / Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in PK-44, Abbottabad. |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 219.66 | 80.25 | 50 | 65.152 | 65.152 | 46.25 | 126.5 | 89.41 | 59% |
58% January - 2018 |
Length 20 Km - out of 16 units, all in progress. |
No Image |
Balolia Deena Rio Guldhok road and Hata Zia Mansoor road (20 Km) PK-44 | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- October - 2020 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- September - 2020 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- August - 2020 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- July - 2020 |
Work order issued to contractor on 08/12/2017. Sit |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- May - 2021 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- April - 2021 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- March - 2021 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- February - 2021 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.05 | 0 | 0 | 0 | 0 | 0 | 0 | 40.05 | - |
- January - 2021 |
Work order issued to contractor on 08/12/2017. Site yet not H/O. |
No Image |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- December - 2020 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- December - 2020 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- October - 2020 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- September - 2020 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- August - 2020 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0 | 0 | 0 | 72.17 | 0 | - |
- July - 2020 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- May - 2021 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- April - 2021 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- March - 2021 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- February - 2021 |
No Image | |
Hangu | |||||||||||||||||||
1195 (OG) |
150726-Establishment of public parks in Havelian-Abbottabad, Thana-Malakand and Hangu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120 | 72.17 | 0.001 | 0.001 | 0 | 0 | 72.17 | 0 | - |
- January - 2021 |
No Image | |
Hangu | |||||||||||||||||||
Pages : 1 |