Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% December - 2018 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% November - 2018 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% November - 2018 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0.8 | 0.8 | 0.8 | 0 | 157.117 | 5.56 | 97% |
96% April - 2019 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% March - 2019 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% March - 2019 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% February - 2019 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163.477 | 157.117 | 0 | 0 | 0 | 0 | 157.117 | 6.36 | - |
96% January - 2019 |
Completed. |
No Image |
Construction of bridge over Kurram river at Shugi Machin Khel/Adhami Rasool Khan, Bannu | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2018 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2018 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2018 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2019 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2019 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2019 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2019 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Chitral |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2019 |
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016. |
No Image |
Chitral | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% December - 2018 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 48 | 15.77 | 26.77 | 0 | 100% |
48% December - 2019 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% November - 2018 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% November - 2018 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 12 | 11.283 | 22.283 | 0 | 100% |
40% November - 2019 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 12 | 11.283 | 22.283 | 0 | 100% |
40% October - 2019 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 12 | 11.283 | 22.283 | 0 | 100% |
40% September - 2019 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 12 | 0 | 11 | 0 | 100% |
20% August - 2019 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 48 | 48 | 59 | 0 | 100% |
100% May - 2020 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% April - 2019 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 48 | 48 | 59 | 0 | 100% |
100% April - 2020 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% March - 2019 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% March - 2019 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 48 | 48 | 59 | 0 | 100% |
100% March - 2020 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% February - 2019 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 48 | 48 | 59 | 0 | 100% |
100% February - 2020 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.466 | 2.666 | 0 | 0 | 0 | 0 | 2.666 | 0.8 | - |
77% January - 2019 |
Completed. |
No Image |
RCC Bridge Gawardesh PK-95 | |||||||||||||||||||
1049 (OG) |
170234-Construction / Up-gradation of School for Deaf & Dumb Children at Timergara Dir Lower |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.9 | 11 | 48 | 48 | 48 | 48 | 59 | 0 | 100% |
100% January - 2020 |
Academic block - slab in progress. |
No Image |
Timergara, Dir Lower | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 0 | 0 | 0 | 0 | 18.986 | 1.564 | - |
92% December - 2018 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. Demand for completion Rs.5.7 m. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 0 | 0 | 0 | 0 | 18.986 | 1.564 | - |
92% November - 2018 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. Demand for completion Rs.5.7 m. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 0 | 0 | 0 | 0 | 18.986 | 1.564 | - |
92% November - 2018 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. Demand for completion Rs.5.7 m. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 5 | 5 | 5 | 2.541 | 21.527 | 0 | 100% |
100% April - 2019 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 5 | 5 | 5 | 2.541 | 21.527 | 0 | 100% |
100% March - 2019 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 5 | 5 | 5 | 2.541 | 21.527 | 0 | 100% |
100% March - 2019 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 0 | 0 | 0 | 0 | 18.986 | 1.564 | - |
92% February - 2019 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. Demand for completion Rs.5.7 m. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II). |
Dir Upper |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20.55 | 18.986 | 0 | 0 | 0 | 0 | 18.986 | 1.564 | - |
92% January - 2019 |
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. Demand for completion Rs.5.7 m. |
No Image |
1) Sundal bridge PK-93
2) RCC bridge Patrak PK-92 | |||||||||||||||||||
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
01-05-16 | - | - | 15-09-17 | - | 700.09 | 199.393 | 100 | 84.5 | 59.5 | 81.158 | 280.551 | 400.697 | 43% |
40% December - 2017 |
Length 18.5 Km - earth work, sub base, WBM, structure work in progress. 1st revised - work in progress. 2nd revised scope - Work started. |
No Image |
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 199.393 | 100 | 69.5 | 30 | 30 | 229.393 | 400.697 | 43% |
33% November - 2017 |
Length 18.5 Km - earth work, sub base, WBM, structure work in progress. 1st revised - work in progress. 2nd Revised scope-tender approval under process. |
No Image |
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 199.393 | 100 | 100 | 35.5 | 21.427 | 220.82 | 400.697 | 43% |
32% October - 2017 |
Length 18.5 Km - earth work, sub base, WBM, structure work in progress. Revised scope tender approval under process. |
No Image |
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
01-05-16 | - | - | 02-03-17 | - | 700 | 199.393 | 100 | 100 | 35.5 | 14.66 | 214.053 | 400.607 | 43% |
31% September - 2017 |
Length 18.5 Km - earth work, sub base, WBM, structure work in progress. Revised scope tendering in progress, opening on 01/11/2017. |
No Image |
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
01-05-16 | - | - | 02-03-17 | - | 400 | 199.393 | 100 | 100 | 35.5 | 6.279 | 205.672 | 100.607 | 75% |
51% August - 2017 |
Length 18.5 Km - earth work, sub base, WBM, structure work in progress. Revised PC-I/DCE for Rs.700 m submitted to SOR on 18/08/2017. Pre-PDWP held. |
No Image |
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
01-05-16 | - | - | 02-03-17 | - | 400 | 199.393 | 100 | 100 | 35.5 | 0 | 199.393 | 100.607 | 75% |
50% July - 2017 |
Length 18.5 Km - earth work, sub base, WBM, structure work in progress. Revised PC-I/DCE submitted for Rs.700 m to CE. |
No Image |
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 199.993 | 100 | 158.897 | 158.897 | 158.897 | 358.89 | 400.097 | 43% |
51% June - 2018 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1049 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 199.993 | 100 | 158.897 | 158.897 | 158.897 | 358.89 | 400.097 | 43% |
51% May - 2018 |
Length 18.5 Km - completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||